background image

 

 

 

 

 

 

Installation 

Suggestions

 

 

 

 

 

 

 

 

Summary of Contents for ULTIMATE 1000

Page 1: ...Installation Suggestions ...

Page 2: ...the various types of mounting options DO NOT RECESS TRACK THE LIFT WILL SCRATCH THE CEILING WHEN UNDER LOAD IF THE TRACK IS RECESSED Electrical Requirements Electrical requirements for this machine are a 110v 15amp groundedoutlet with surge protector placedwithin 5 ft ofthemachine Astandard 5ft cord is sent pre installed with all stationary units It is highly recommended to have the outlet to whic...

Page 3: ...le the machine isstillon the ground plugthe machine in and unwind straps until fully extended 4 Flip the machine so that the motor and components are touching the floor 5 Connect extended straps to eye bolts and lift the hoist to the ceiling by pressing the up button on the remote or pendant this keeps the hooks on the machine from jamming or catching in the machine spools whilelifting Be sure the...

Page 4: ...th corner until the metal washer is firm against the frame and does not rattle A good method is to make this adjustment while the motor is in operation When in perfect alignment the motor will run smoothly and quietly C Insert and tighten the center 2 lag screws until the metal washer touches the frame and does not rattle Suspended Monorail Track Mount on a WoodJoistCeiling Mounted Perpendicular t...

Page 5: ...base Slotted Holes Used for Stationary mounting with Lag Bolts or All Thread 10 Slotted holes 5 on each side of the machine 2 End Slots are 16 on center Slots are 2 Long X 9 16 Wide Slots are from Long Edge of the machine 16 on Center 2 End slots and Center Slot are 16 on Center length 32 ...

Page 6: ...Rev 4 5 2021 M ORTUARY LIFT COMPANY THE ULTIMATE 1000 LIFT 127Cottage Grove Avenue S E Cedar Rapids Iowa 52403 800 628 8809 319 364 4910 www mortuarylift com ...

Reviews: