National Ramp New Vertical Pickets Quick Installation Guide 

Thank you for purchasing from National Ramp!  This quick installation guide will focus on the differences 
between a vertical picket handrail vs. dual rail handrail (Liberty/Breeze) install.  It is a prerequisite to 
understand how to install dual rail handrails on the Liberty or Breeze system before proceeding with this 
guide.  Please read through entire guide before installation. 
 

Tools Required: 

 

Tools required to install Liberty / Breeze system 

 

9/16” open end wrench (will be used for inside corner configurations) 

 

7/16” socket and/or wrench (used for vertical picket handrail through-bolts) 

 

Vertical Picket – Legs: 

 
What’s different? 

Dual Rail Handrail (Liberty/Breeze) 

New Vertical Picket Handrail 

Legs are fixed sizes and once piece.  

Leg channel and 

foot plate are one piece.

 

Vertical picket legs can be cut and customized.  

Leg 

channel and foot plate are 2 separate components.

  

Leg channel can be cut and installed into foot plate.  
The length is customizable due to potential 
interference with bottom rail of the vertical picket 
handrails. 

 

Instructions: 

1. 

Determine required leg sizes and cut leg 
channels to required lengths.  Top of leg should 
extend 3” from walking surface (2-3” for 
platforms, 3-4” for ramps sections). 

  

 

                   (ramp)                              (platform) 

Summary of Contents for Liberty Vertical Picket

Page 1: ...or inside corner configurations 7 16 socket and or wrench used for vertical picket handrail through bolts Vertical Picket Legs What s different Dual Rail Handrail Liberty Breeze New Vertical Picket Ha...

Page 2: ...tall leg to ramp platform using 3 universal brackets 3 8 16 x 1 5 bolts and 3 8 16 serrated flange nuts Slide the universal bracket assembly into the ramp platform channel and attach leg to universal...

Page 3: ...Assemble vertical picket handrail to ramp platform using 2 5 universal brackets 3 8 16 x 2 5 bolts and 3 8 16 serrated flange nuts Top assembly shows the 3 universal bracket with 1 25 bolts for dual r...

Page 4: ...vertical picket handrails at an inside corner The layout depicted will be a ramp into a platform into another ramp turning left off the platform Install the first inside corner vertical picket handrai...

Page 5: ...icket handrail to the switchback bracket then slide entire assembly into the channel 3c Once the first inside corner vertical picket handrail is assembled to the platform channel snug the serrated nut...

Page 6: ...ng the extended bolts from the ramp section picket coming onto the platform and a universal bracket assembly in the channel of the other platform 3e The picture to the right shows the universal bracke...

Page 7: ...e bottom slot 3h Once the vertical picket handrail is positioned tighten the serrated nuts holding the on coming ramp with a 9 16 open end wrench Install another set of serrated nuts to the 5 bolts to...

Page 8: ...ctions using through bolts washers and acorn nuts 20 x 4 5 bolt for Ramp to Ramp or Ramp to Platform connections 20 x 5 0 bolt for Platform to Ramp connections 5b Connect all corners using the corner...

Page 9: ...been made and switchback bracket is secured to platform fully tighten all leg and handrail nuts Inspect entire installation by walking and jumping on each ramp section platform to be sure it is secure...

Reviews: