background image

 

Combination Boiler 

Model 

NCB-180/210/240 

 

This boiler is configured for Natural Gas 

from the factory. If conversion   

to Propane Gas is required, the 

conversion kit supplied with the boiler   

must be used. 

 

  WARNING 

This conversion kit shall be installed by a qualified service agency* in 
accordance with Navien  America’s instructions and all applicable codes and 
requirements of the authority having jurisdiction. The information in these 
instructions must be followed to minimize the risk of fire or explosion or to 
prevent property damage, personal injury or death. The qualified service 
agency is responsible for the proper installation of this kit. The installation is 
not proper and complete until the operation of the converted appliance is 
checked as specified in the manufacturer’s instructions supplied with the kit. 

 

٭

 

A qualified service agency is any individual, firm, corporation or company 

which either in person or through a representative is engaged in and is 

responsible for the connection, utilization, repair or servicing of gas 

utilization equipment or accessories; who is experienced in such work, 

familiar with all precautions required, and has complied with all of the 

requirements of the authority having jurisdiction. 

In Canada

: The conversion shall be carried out in accordance with 

the requirements of the provincial authorities having jurisdiction 

and in accordance with the requirements of the CAN‐B149.1 and 

CAN1‐B149.2 Installation Code. 

Tools Required: 

 

Phillips Screwdriver 

 

Flathead Screwdriver 

 

5/32 in or 4mm Allen Wrench 

 

Combustion Analyzer or Dual Port Manometer   

 

Gas Leak Detector 

Included Items: 

 

Gas Orifice (refer to below table) 

 

Model 

NG 

LP 

1STAGE 

2STAGE 

1STAGE 

2STAGE 

NCB-180 

Ø4.80 

Ø5.95 

Ø3.80 

Ø4.70 

NCB-210 

Ø6.10 

Ø6.30 

Ø4.50 

Ø4.80 

NCB-240 

Ø6.10 

Ø6.30 

Ø4.50 

Ø4.80 

Table 1. Orifice Size 

 

Gas Pressure and Conversion Kit Number Labels 

11.

 

  Once the Gas Orifice is exposed, remove the two screws that 

hold the part in place. Remove the Gas Orifice from its housing 

and prepare the new Gas Orifice for the LP conversion for 

installation. 

 

Figure 4. Access to Gas Orifice in Fan Assembly 

 

 

  WARNING 

 

DO NOT adjust or attempt to measure gas valve outlet 
pressure. The gas valve is factory-set for the correct outlet 
pressure. This setting is suitable for natural gas and propane, 
requiring no field adjustment. 

 

Attempting to alter or measure the gas valve outlet pressure 
could result in damage to the valve, causing potential severe 
personal injury, death or substantial property damage. Navien 
NCB boilers are shipped ready to fire natural gas ONLY. 

 

 

Figure 5. Exploded View of Gas Pipe Assembly 

 

  DANGER 

See Figure 5. Inspect the O-ring between the gas valve and gas valve inlet 
adapter whenever they are disassembled. The O-ring must be in good 
condition and must be installed. Failure to comply will cause a gas leak, 
resulting in severe personal injury or death. 

 

Procedure: 

1.    Turn off both gas and water supply to the boiler. 

2.    Using a Phillips screwdriver, remove 4 screws (2 from the top and 2 from 

the bottom) of the front cover assembly to gain access to the internal 

components. See Figure 1 for illustration of the front cover on the unit. 

 

3.  Once the front cover is removed, place it in a safe location to prevent 

accidental damage. 

4.  Label all the wires on the PCB. 

5.  Disconnect all the wires. 

6.  Loosen the three screws indicated in the figure. (Refer to Figure 2.) 

7.    Remove the PCB assembly. 

8.    With the internal components exposed, locate the gas inlet 

pipe and the gas valve in the middle of the unit. 

9.  Use a Phillips screwdriver to remove the two screws at location 

A - the connection below the gas valve where it connects to the 
pipe. See Figure 3 for reference. Once the screws are removed, 

carefully separate the pipe from the gas valve. 

10. 

 

Once the gas inlet pipe is detached from the gas valve, find 

location B - the connection above the gas valve where it is 
attached to the fan motor assembly. Carefully remove the four 

screws by hand using a Phillips screwdriver and pull the gas 

valve away from the fan assembly to access the gas orifice. 

 

Figure 3. Detaching Gas Valve from 

Gas Inlet Pipe and Fan Motor Assembly 

 

Figure 6. Orifice identification 

12.

 

  Replace the old Orifice piece with the new part for use with LP 

gas. Ensure that the Orifice is properly seated inside the port 

before proceeding to the next step. 

13. 

 

Replace the gas inlet pipe to its original position and use all 

screws to secure all connections. 

 

Do not overtighten as this may damage or crack the 

components. 

 

  DANGER 

Inspect the O-ring between the gas valve and gas valve inlet adapter 
whenever they are disassembled. The O-ring must be in good condition 
and must be installed. Failure to comply will cause a gas leak, resulting 
in severe personal injury or death. 

14. 

 

Place the PCB assembly back on to the boiler and tighten the 

three screws. 

15. 

 

Check the labels carefully and then connect all the wires. 

16. 

 

Set the front panel Dip Switch to change the gas type. For LP, set Dip 

Switch 2 #2 to On. For NG, set DIP SW2 #2 to Off. 

  WARNING 

Ensure that you have turned off the power to the boiler before accessing the 
DIP switches. 

 

  DANGER 

 

When conversion is required, be sure to set the front panel DIP 
switches according to the supply gas type. 

 

Failure to properly set the DIP switches could cause carbon 
monoxide poisoning, resulting in severe personal injury or death. 

17.

 

  Turn on the gas and water supply to the boiler. 

Location B: Remove 

4 screws here 

Location A: Remove 

2 screws here 

Figure 1. 

Figure 2. 

Gas Orifice 

O-ring 

Remove two (2) 

screws here 

Reviews: