Summary of Contents for FastLane SelfServ 7358-K112

Page 1: ...Kit Instructions 2 Bag Bagwell Upgrade 7358 K112 Issue A...

Page 2: ...tions of an agreement you have with NCR NCR s copyright notice must be included It is the policy of NCR Corporation NCR to improve products as new technology components software and firmware become av...

Page 3: ...i Revision Record Issue Date Remarks A Oct 2019 First Issue...

Page 4: ...ed for either Left hand LH orientation or Right hand RH orientation which refers to the direction customers scan and bag items Left hand LH orientation Customers scan from left to right Right hand RH...

Page 5: ...2 2 Bag Bagwell Upgrade Kit Contents Part Number Description 497 0526493 Kit 2 Bagwell Module Bumpers Skirts Dark White...

Page 6: ...Bagwell backsplash 2 bagger 497 0455519 Plastic deflector core side 006 8611143 Nut Keps 8 32 Steel Blue Zinc 9 pcs 006 8611505 Bushing Nylon 2 pcs 009 0005930 Cable Tie Snap in Mounting 3 pcs 006 86...

Page 7: ...mper 1 2 3 Bag Side Wrap Around Corner 497 0518276 Bumper Core Low Side Core Low Back 2 and 3 Bag Low Back 497 0455678 Bracket rear frame support 2 bagger 497 0423108 Instructions Kit Reference Sheet...

Page 8: ...ell upgrade involves the following procedures Removing Existing Bagwell on the next page Changing Bagwell Orientation on page 12 Note This procedure may be optional Installing New Bagwell on page 19 I...

Page 9: ...well To remove an existing 2 Bag Bagwell follow these steps Note To remove a 1 Bag Bagwell refer to To remove a 3 Bag Bagwell refer to 1 Detach the Scale Tray from the Bagwell by removing four 4 flat...

Page 10: ...2 Bag Bagwell Upgrade 7 2 Remove the clear plastic deflectors from the Backsplash and side of the Core Note Leave the Core side deflector in its place if the new Bagwell is attached on the same side...

Page 11: ...cables USB Power Cable from the Scale Controller Local Area Network LAN Cable from the Customer Interface AC Power Out Cables from the Power Strip AC Power In Cable from the Power Strip Note Remove ca...

Page 12: ...Hole AC Power In Cable Core Cable Access Hole USB Power Cable Local Area Network LAN Cable AC Power Out Cables Note The Local Area Network LAN Cable and AC Power In Cable may be routed differently dep...

Page 13: ...Upgrade 6 Remove the Bagwell by doing the following a Remove the two 2 bottom screws attaching the Bagwell to the Core Screws are located on either side of power strip b Loosen the two 2 upper screws...

Page 14: ...e Core Cabinet The upper screw heads will pass through the key holes in the Bagwell side support Note The two 2 upper screws may be left in place if a new Bagwell will be installed in the same orienta...

Page 15: ...orientation follow these steps Note These steps should be done before attaching the Bagwell to the Core For the purpose of illustration only this procedure shows images using Left hand LH orientation...

Page 16: ...ve the bumpers by doing the following Note Do not remove the front access door bumper a Detach the lower rear bumper from the Bagwell by removing two 2 flat head screws b Detach the Backsplash the Bag...

Page 17: ...ag Bagwell Upgrade c Detach rear support frame from the Bagwell by removing four 4 nuts d Detach the upper bumper from the Bagwell by removing six 6 flat head screws and spacers as shown in the image...

Page 18: ...e 15 e Detach the wrap around side bumper by removing three 3 flat head screws and spacers as shown in the image below 3 Remove two 2 nuts securing the front panel to the Bagwell frame located at the...

Page 19: ...sengage from the slots in the Bagwell frame base as shown in the image below 5 Install the front panel on the opposite side of the Bagwell and secure it with two 2 nuts Note Ensure that the the lower...

Page 20: ...not reinstall Scale Tray Backsplash panel and rear lower bumper if present For more information refer to Installing New Bagwell on page 19 a Attach the rear frame support by using four 4 nuts b Attach...

Page 21: ...18 2 Bag Bagwell Upgrade c Attach the wrap around bumper to the Bagwell by using three 3 flat head screws and spacers...

Page 22: ...g the new Bagwell to the Core For the purpose of illustration only this procedure shows images using a Left hand LH orientation unit 1 Remove the Scale Tray from the Bagwell 2 Remove the lower access...

Page 23: ...l Upgrade 3 Lower all the leveling feet of the Bagwell slightly beyond the height of the casters to assist in lining up the Core and the Bagwell mounting holes 4 Install the new Backsplash panel using...

Page 24: ...he two 2 upper screws on the Bagwell side of the Core Leave approximately inch of the threads exposed 6 Mate the new Bagwell to the Core by lifting the frame up and over the partially threaded screws...

Page 25: ...ten the two 2 screws and install the two 2 lower screws that connect the Bagwell and the Core 8 Install the upper rear screw attaching the Backsplash panel to the Core Note Adjust the leveling feet if...

Page 26: ...and two 2 flat head screws on the Backsplash 10 Route the following cables through the cable access hole Bagwell Cable Access Hole AC Power In Cable Core Cable Access Hole USB Power Cable Local Area N...

Page 27: ...24 2 Bag Bagwell Upgrade 11 Remove four 4 yellow shipping spacers from the scale pods before installing the Scale Tray...

Page 28: ...ll using four 4 flat head screws Note Ensure that the surface marked BACK is facing towards the back of the unit Important Use the correct screw length Tighten the screws from six to eight pounds Do n...

Page 29: ...ce to avoid scale errors 14 Attach the Bagwell Skirt Panels For more information refer to Installing Bagwell Skirt Panels on the facing page 15 Do the following Level the unit and attach the bag racks...

Page 30: ...agwell do the following a Attach the skirt panel to the skirt brackets by aligning the open slots in the skirt panel with the screw holes in the skirt bracket b Secure the skirt panel to the bracket u...

Page 31: ...e side skirt panel of the Bagwell a Attach the front and back skirt panels to the skirt brackets by aligning the open slots of both skirt panels with the screw holes in the skirt bracket b Secure both...

Page 32: ...o Routing Cables for No Bag unit on page 32 Note Use the new pre installed USB Power Cable only when installing a new Bagwell to a No Bag unit If not reuse the existing USB Power Cable of the previous...

Page 33: ...e 2 Tie the USB Power Cable with cable ties to hold it in place 3 Route the Local Access Network LAN Cable from the Core to the Customer Interface through the smaller opening of the Bagwell frame as s...

Page 34: ...2 Bag Bagwell Upgrade 31 4 Route the AC Power Out and AC Power In cables and then connect to the Power Strip as shown in the image below...

Page 35: ...ditional steps in routing cables when upgrading a No Bag unit to a 2 Bag unit Note Use the new USB Power Cable Route the USB Power Cable to the I O Box first before installing new Bagwell 1 Unlock and...

Page 36: ...le by doing the following a Grasp the front of the Scanner and lift up b Grasp the back of the Scanner and slide the scanner out of the bucket area 4 Detach the rear Core panel by removing six 6 screw...

Page 37: ...n the new Bagwell and plug the host connector to USB G port of the I O Box 7 Route the cables along the cable guides as shown in the image below Ensure that the cable bundle is not in contact with the...

Page 38: ...ollowing a Grasp the Scanner Scale by its handles and then lower it into the checkstand cutout Caution Be careful not to damage any of the cables b Lower the Scanner Scale unto the scannder bucket are...

Page 39: ...reused in the new Bagwell AC Power Out Cable should be routed either through the left hand or right hand lower Core access cutout into the new Bagwell Note The Power Strip remains on the rear Core wa...