background image

Installation & Operating Instructions 

FS 800 

FS 500 

IS 800 

IS 500 

Pecan Engineering Pty Ltd  

13 Acorn Road  

DRY CREEK  SA 5094  

Ph. (08) 8349 8332  Fax. (08) 8260 6643    

www.nectre.com  email:  info@pecan-eng.com.au   

Toll Free  1800 636 301  

NECTRE 

FIREPLACES 

Summary of Contents for FS 800

Page 1: ...ing Instructions FS 800 FS 500 IS 800 IS 500 Pecan Engineering Pty Ltd 13 Acorn Road DRY CREEK SA 5094 Ph 08 8349 8332 Fax 08 8260 6643 www nectre com email info pecan eng com au Toll Free 1800 636 30...

Page 2: ......

Page 3: ...ONS OF HEATERS DOOR HANDLE ADJUSTMENT DOOR GLASS DOOR GASKET FIREBRICKS LIGHTING YOUR FIRE INITIAL OPERATING PERIOD GENERAL OPERATION OVERNIGHT BURN BAFFLE PLATE LOCATION FAN SERVICE CLEANING THE FIRE...

Page 4: ...rpretation of AS NZS 2918 2001 WARNING The heater must no be operated without the floor protector installed as heat radiation from the glass door may burn floor surfaces WARNING DO NOT BURN FLAMMABLE...

Page 5: ...than 300mm to the sides and 600mm above the hot air outlet without adequate heat shielding in terms on clause 3 4 2 AS NZS 2918 2001 FLOOR PROTECTOR Refer to AS NZS 2918 2001 Clause 2 2 3 3 1 3 3 2 a...

Page 6: ...ibles as shown below Currently for installation with an Australian Standard Double Cased flue kit with a full length half radius perforated mesh flue shield OUTER CASING NO LESS THAN 25MM CLEARANCE TO...

Page 7: ...TING PERFORMANCE MAY REDUCE AS A RESULT OF VAULTED CEILINGS DRAFTS LARGE GLASSED AREAS OR POOR INSULATION Y X Z Z B B A A MODEL X Y Z B MODEL HEIGHT WIDTH DEPTH REAR OF HEATER TO FLUE CENTRE IS500 Fas...

Page 8: ...OR GLASS Inspect door glass regularly for cracks and breaks If a crack is found extinguish fire immediately and replace glass Contact your dealer for replacement glass If your glass becomes stained or...

Page 9: ...n air slide fully 5 Light several parts of the newspapers 6 Close the door to avoid smoke spillage Do not close latch this will allow extra air into the firebox and helps create a draft After approxim...

Page 10: ...e open on high for 15 20 mins to allow new fuel to catch freely and entirely Then re adjust the air slide to desired setting for maximum efficiency If the fire is too small refuelling first with kindl...

Page 11: ...Lift baffle up from the rear and slide forward out through the door You will need to lift the rear lip of the baffle plate over the front and rear mounting rods 2 After cleaning the flue system simpl...

Page 12: ...ot to damage the blades 3 Plug in power and turn on CLEANING THE FIREBOX Ash should be cleared or removed when build up reaches the level of the door opening To clean use a metal fireplace shovel maki...

Page 13: ...ctric fans are only warranted against failure to operate for one year Under the terms of this warranty Pecan Engineering Pty Ltd assumes no reponsibility for the labour costs involved in removing or r...

Page 14: ...5mm 3 Baffle Plate 800 Series 590mm x 288mm x 8mm 500 Series 490mm x 248mm x 8mm 4 Door Rope 800 Series 1900mm x 16 mm Round 500 Series 1300mm x 16 mm Round 5 Glass Rope 800 Series 1840mm x 19mm x 3m...

Page 15: ......

Page 16: ...14...

Reviews: