background image

Operating Instructions 

Do Not Throw Away 

Please keep these Operating Instructions in a safe place for future reference 

The model shown here is the Mega LE Pedestal  

Pecan Engineering Pty Ltd proudly supports 

the activities of Landcare Australia through its 

membership of the AHHA

MEGA LE Model

Summary of Contents for MEGA LE

Page 1: ...e keep these Operating Instructions in a safe place for future reference The model shown here is the Mega LE Pedestal Pecan Engineering Pty Ltd proudly supports the activities of Landcare Australia th...

Page 2: ...STORE FUEL WITHIN HEATER INSTALLATION CLEARANCES WARNING WHEN OPERATING THIS APPLIANCE AS AN OPEN FIRE USE A FIRE SCREEN WARNING OPEN AIR CONTROL AND DAMPER WHEN FITTED BEFORE OPENING FIRING DOOR CAU...

Page 3: ...Nectre MEGA LE door handle is made from mild steel and has a stay cool spring screwed on Warning The handle may get hot if the appliance has been operating at High Burn setting for an extended period...

Page 4: ...draw already warm air out of the same space Running the appliance with the top and bottom air slides in the fully opened position will not produce the hottest fire as too much heat is lost up the flu...

Page 5: ...g and keeping a fire burning well smoke and only small flames dirty glass and or firebricks rapid creosote build up in the flue low heat output short burn times and blue grey smoke from flue outlet 3...

Page 6: ...n for any build ups creosote or any obstructions To do this removethebaffleplate seeReplacement of Baffles using a small mirror and a torch hold the mirror on a angle below the flue inside the firebox...

Page 7: ...have 8 full bricks standing on their ends Back of firebox is lined with 5 full bricks standing on their ends Remove the side and rear fire bricks before fitting the brick retainer With the retainer o...

Page 8: ...ugh the door opening Repeat steps i to iii in reverse to replace with the new baffle plates The ash plate acts to protect the front of the firebox below the door opening from the hot coal bed and fire...

Page 9: ...g to loosen them In this case a new hole can be drilled in the door and tapped using a 3 4mm drill bit and M4 tap FIREBRICKS 21 x full bricks 234 h x 118 w x 40 d mm 4 x half bricks 175 h x 115 w x 40...

Page 10: ...g Pty Ltd assumes no responsibility for the labour costs involved in removing or replacing the stove Nor shall Pecan Engineering Pty Ltd be liable for any injury loss or damage direct indirect or cons...

Reviews: