background image

220-0000071 rev01

UIM-E1

E1 Uplink Interface Module

INSTALLATION

1. Unpack and inspect the equipment.

The following components should be included:

          1 UIM-E1
          4 #6 Phillips Panhead Internal Locking Screws
          2 #6 Phillips Beige Flathead Screws

If there is any visible damage, do not attempt to connect the device. Contact Customer Support at 1-
877-638-2638 (001-603-427-0600 for international customers) or Support@NetToNet.com.

2. Verify switch configuration.

Ensure that the DIP switches on the UIM-E1 circuit board are positioned correctly (according to 
desired configurations) prior to installing the UIM-E1 on a Multiplexer Uplink Module or in a Mini 
DSLAM. There are eight DIP switches located on the top side of the circuit board, opposite the 
faceplate. Switches are numbered from left to right, starting with Switch #1 on the left and ending 
with Switch #8 on the right. Switches 1-2 and 5-8 are not used. Configuration for switches #3 and 
#4 are as follows:

Frame Type & Line Coding 
Switch Configuration

 

Installation Instructions

 

CAUTION

Net to Net Technologies strongly recommends the use of proper electrostatic discharge (ESD) precautions when 
handling this equipment. 

Switch #3 Frame Type Switch #4 Line Coding

down

CRC

down

HDB3

up

no CRC

up

AMI

  

CRC = Cyclic Redundancy Check
HDB3 = High Density Bipolar 3
AMI = Alternate Mark Inversion

Reviews: