Installation
guide
for
Newsteo’s
products
(LOG,
LGR,
LGS,
LGP,
LGW,
TRK,
LOM
ranges)
1.
Software
installation
Follow
the
instructions
of
the
Quick
Start
document.
Minimum
required
configuration
for
RF
Monitor
Premium:
‐
CPU
1GHz
‐
RAM
500MB
‐
Windows
XP
SP2
or
higher
‐
10MB
available
hard
disk
‐
1
USB
slot
Minimum
required
configuration
for
RF
Monitor
Gold:
For
the
reception
PC:
‐
CPU
1GHz
‐
RAM
500MB
‐
Windows
XP
SP2
or
higher
‐
10MB
available
hard
disk
‐
1
USB
slot
For
the
server:
MySQL
data
base
2.
RF
‐
to
‐
USB
key
(receiver)
When
the
installation
program
requests
it,
plug
the
receiver
into
a
USB
port
of
the
PC
thanks
to
its
USB
cable
extender.
‐
Move
the
key
away
from
the
screen
‐
Place
the
key
in
height
‐
The
antenna
should
always
be
vertical
‐
Do
not
stick
the
key
on
a
wall
NOTE:
if
the
receiver
is
connected
to
an
outdoor
antenna,
take
care
to
the
fact
that
the
antenna
can
be
stroked
by
lightning
and
lightning
can
be
conducted
to
the
PC.
3.
Telemeter
installation
Newsteo
Tracker
(TRK)
:
‐
Put
the
battery(ies)
inside
the
product
‐
Screw
the
housing
Newsteo
Logger
(LOG)
:
‐
Screw
the
antenna
with
fingers.
Be
careful;
do
not
use
a
tool
for
tightening
the
antenna.
Newsteo
LGR,
LGS,
LGW,
LGP
range:
‐
Screw
the
antenna
and
the
probe
with
fingers.
Be
careful;
do
not
use
a
tool
for
tightening
them.
4.
General
remark
about
radio
communication
Radio
waves
cannot
pass
through
a
full
metal
grounded
wall.
However,
if
the
wall
has
openings,
the
radio
waves
can
pass
but
will
be
attenuated.
The
waves
can
pass
through
walls
(concrete),
but
will
be
also
be
attenuated.
‐
Place
the
telemeter
high
up
(ideally
at
2
/
3
of
the
room
height,
in
the
case
of
a
closed
room)
‐
Do
not
stick
the
telemeter
directly
to
the
wall,
ceiling,
or
fl
oor.
‐
The
antenna
must
be
vertical
‐
The
measurement
is
made
at
the
exact
position
of
the
telemeter’s
sensor.
Its
positioning
is
therefore
essential.
‐
In
case
of
communication
troubles,
add
a
Newsteo
Repeater
to
the
installation
or
use
a
more
powerful
antenna.
5.
Battery
replacement
Battery
model
LOG31,
LOG36,
LGR
range,
LGS
range,
LGP
range
:
XENO
XL
‐
060F
with
wires
and
fast
connector
(3.6
V,
AA
model)
LGW
range:
XENO
ER14505M
(3.6V
AA
size,
spiral
cell)
with
wires
and
fast
connector
LOM
:
XENO
XL
‐
050F
(3.6
V,
1/2AA
model)
with
wires
and
fast
connector
Other
LOG:
XENO
XL
‐
050F
(3.6
V,
1/2AA
model)
TRK31
&
TRK41
:
3
x
1.5V
(AA
model)
industrial
alkaline
batteries
TRK33
:
XLP
‐
060F
STD
(3.6
V,
AA
model)
Newsteo
can
provide
set
of
batteries.
Please
contact
us.
Casing
opening
For
LOG31,
LOG36,
LGR
range,
LGS
range,
LGW
range,
LGP
range
The
housing
is
waterproof
and
equipped
with
a
moisture
‐
absorbing
bag
with
a
capacity
of
1g.
Proceed
to
open
and
change
the
battery
in
a
dry
place
and
in
a
shortest
possible
time
(less
than
5
minutes)
so
as
not
to
saturate
the
absorber.
It
is
not
necessary
to
change
the
absorber
except
if
you
leave
the
case
open
more
than
5
minutes.
The
housing
must
be
clean
and
free
of
dust.
Clean
it
if
necessary
before
opening.
Use
a
Phillips™
screwdriver
PH2.
Unscrew
the
4
screws
on
the
top
of
the
housing.
Carefully
open
the
box,
taking
care
not
to
lose
the
joint.
The
case
was
closed
with
a
grease
seal
which
normally
assures
it
will
open
correctly.
However,
in
the
case
of
use
in
a
particularly
aggressive
or
hot
area,
the
joint
may
be
glued
to
the
joint
plane.
In
this
case,
replace
the
seal
in
its
groove.
As
a
precaution,
the
lubrication
of
the
joint
face
with
a
silicone
‐
based
grease
is
recommended
to
ensure
later
easy
removal.
For
other
LOG
and
TRK
Proceed
to
open
and
change
of
the
battery
in
a
dry
place.
The
housing
must
be
clean
and
free
of
dust.
Clean
it
if
necessary
before
opening.
Use
a
Phillips™
screwdriver
PH2.
Unscrew
the
2
screws
(for
the
LOG)
or
4
screws
(TRK)
on
the
back
of
the
housing.
LOM16
Proceed
to
open
and
change
the
battery
in
a
dry
place
and
in
a
shortest
possible
time
(less
than
5
minutes)
so
as
not
to
saturate
the
absorber.
It
is
not
necessary
to
change
the
absorber
except
if
you
leave
the
case
open
more
than
5
minutes.
The
housing
must
be
clean
and
free
of
dust.
Clean
it
if
necessary
before
opening.
Manually
remove
the
cap
on
top
of
this
box.
New
battery
installation
Remove
the
old
battery
from
its
holder
and
put
the
new
battery
in
place
of
the
old.
Respect
polarity
shown
highlighted
on
the
product.
Check
the
correct
restart
of
the
product
on
RF
Monitor
software.
Housing
closing
Replace
the
screws
(or
the
cap)
and
screw
them.
The
two
housing
parts
should
be
joined,
without
space.
6.
Protection
level
LOG31,
LOG36,
LGR
range,
LGS
range,
LGW
range,
LGP
range:
IP65
Other
LOG,
TRK:
IP54
LOM
:
IP67
The
level
of
tightness
of
the
product
is
valid
only
if
the
probe
and
antenna
are
properly
tightened
(seals
smoothly
“crushed”).
7.
Certifications
Products
with
radio
transmission
certified
for
use
in
Europe,
on
the
frequency
of
868
MHz
(ISM
band).
For
use
in
another
area,
check
with
local
authorities.
CE
conformity:
Meets
the
requirements
stated
in
the
following
Council
Directives:
‐
2006/95/EC
(for
electrical
equipment
designed
for
use
with
certain
voltage
limits);
‐
2004/108/EC
(concerning
the
electromagnetic
compatibility
requirements).
Complies
with
the
provisions
of
the
following
European
harmonized
standards:
‐
EN
61000
‐
6
‐
1:2007
‐
EN
61010
‐
1:2001
‐
ETSI
EN
300
220
‐
1
V2.3.1:2010
‐
ETSI
EN
300
220
‐
2
V2.3.1:2010
‐
ETSI
EN
301
489
‐
1
V1.8.1:2002
‐
ETSI
EN
301
489
‐
3
V1.4.1:2008
8.
Address
of
the
manufacturer
NEWSTEO
S.A.S.
93
avenue
des
Sorbiers
–
ZE
Athelia
4
13600
La
Ciotat
–
France