background image

Mount Juliet (6ft Double) Climbing Frame Instruction Manual 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for Mount Juliet

Page 1: ...Mount Juliet 6ft Double Climbing Frame Instruction Manual...

Page 2: ...Parts List Item Number Description Image Quantity 1 3m post cut at 40 angle 8 2 3m post cut at 60 angle 2 with 32mm hole pre drilled 3 420mm post 1 4 1575mm post 4...

Page 3: ...5 1755mm x 1170 mm roof panel 4 6 6 x 1 small board for roof 4 7 6 x 1 large board for roof 4 8 1755mm x 1755mm base 2 9 1575mm x 3 x 1 5 timber 4 20 for picnic table...

Page 4: ...10 1755mm 3 x 1 5 timber 9 2 for picnic table 11 Railings Open Railing Closed Railing 8 6 open 2 closed as standard 12 Decking screws 300...

Page 5: ...13 200mm index screws 26 14 120mm screws 40 15 Set of steps 1 16 Screw covers 40...

Page 6: ...17 M10 swing hook 6 as standard depends on swing choices 18 Rock wall 1 10 rocks as standard for 8ft wall 5ft wall has 5 rock holds 19 9ft slide 1...

Page 7: ...20 Swing varies depending on customers choice 3 as standard 21 2450mm 3 x 1 5 doubled up for Rope Bridge 2 22 1575mm 3 x 1 5 doubled up for Rope Bridge 2...

Page 8: ...23 330mm Decking Board 16 or 32 x 330mm 3 x 1 5 slats 24 Green Mesh 2 25 3m rope 2 26 Large U Nails 1 Bag...

Page 9: ...27 Small U Nails 1 bag 28 8ft Cargo Net 1 29 8ft tall Fireman s Pole 1 30 10ft Monkey Bars 1 holes pre drilled for swing hooks...

Page 10: ...x 1 5 2 32 16mm Rope 18m Other components included Handgrips telescope steering wheel Tools needed Cordless drill Handsaw Spirit Level Hammer Shovel Stepladder Pencil Measuring tape 10mm Hex bit PZ 2...

Page 11: ...ings and the roof to prevent children from climbing onto the swing bar 2 Allow for at least 1 8m clearance beyond the end of the slide and 1 2m clearance for the steps rock module and swing module 3 O...

Page 12: ...h step Step 1 H Frame Assembly Lay 2 3m posts that are cut at a 40 angle on a level surface Ensure the cut angle is facing the same way on both posts and the holes are on the outside Step 2 Place the...

Page 13: ...mark to each post 2100mm down from the top of the post Using a piece of 1755mm 3 x 1 5 timber and the 65mm decking screws screw the timber to the 3m posts at the 2 4m mark you made on the posts this i...

Page 14: ...n the top of the post and screw into place using the 65mm decking screws Steps 3 and 4 strengthen the H frame structure without this additional support at the top and bottom the frame will twist once...

Page 15: ...H frames into the holes that have been cut out in the ground Make sure the H frames are orientated correctly to ensure that the roof will be able to rest on the tops Step 7 Using 2 pieces of 1575mm x...

Page 16: ...own Lift the base and place it onto the two horizontal posts The 3 x 1 5 base supports should sit onto the horizontal posts Secure the base to the posts using the 120mm screws provided They should be...

Page 17: ...e rock wall cargo net and swing module Ensure to fit the railings in their correct positions depending on the desired layout of the frame They should fit tightly into place between the upright posts a...

Page 18: ...sitting on them the decking screws should be screwed in from beneath at an angle between each of the 3 x 1 5 base supports Step 10 To secure each railing to the upright posts screw through the upright...

Page 19: ...Step 11 Repeat steps 9 and 10 for each railing...

Page 20: ...Assembly Place one of the 1755mm x 1170mm roof panels directly onto the ground so that the shingled part is facing downwards Using the v boards provided assemble the two roof panels together using de...

Page 21: ...e and ensure it is positioned evenly on all sides before securing the roof to the top of the post using 2 x decking screws for each 2 x 1 support of the roof panel Secure the middle roof panel support...

Page 22: ...Step 14 Repeat Steps 1 13 for 2nd Tower Ensure there is 2 160m between the towers and that 2 open railings are facing each other for the rope bridge to connect to...

Page 23: ...ing the two 2 45m lengths of 3 x 1 5 that is doubled up place these on the underside of the bases They are to be placed 65mm to the left and right of the centre point of the base 130mm in between Scre...

Page 24: ...tower by placing them below the two doubled up 2 45m lengths of 3 x 1 5 and between the 3m vertical posts Screw upwards into the two doubled up 2 45m lengths of 3 x 1 5 using the 120mm screws Drill 32...

Page 25: ......

Page 26: ...Step 17 Rope Bridge Assembly Step 3 Screw the decking boards down into the two doubled up 2 45m lengths of 3 x 1 5 using decking screws...

Page 27: ......

Page 28: ...ides and the rope is pulled good and tight to minimise sagging Once both sides are secure you can now fit the netting using the small u nails 27 You will need to nail both sides first starting at the...

Page 29: ......

Page 30: ...the 200mm screws Please ensure that the 420mm post is flush with the cut on the top of each 3m post Step 20 Attach a piece of 1755mm x 3 x 1 5 across the middle of the A frame to hold it in its place...

Page 31: ...Step 21 Cut the 1755mm timber flush with the A frame posts Step 22 Place each swing hook through the pre drilled holes of the 3m monkey bar post secure using the appropriate spanner...

Page 32: ...on the ground should then be marked and the A frame should be sunk into its place so that the monkey bar is level If your garden is level holes about 250mm 300mm will suffice If your garden is running...

Page 33: ...anging either side the same distance Use the 200mm screws provided to screw the monkey bars to the 3m posts of the A frame and the 120mm screws to screw down into the 420mm post Use the 120mm screws t...

Page 34: ...Step 25 Screw Cover Assembly Press the screw covers into each of the 32mm holes on the 8 vertical posts that make up the H Frames and the swing assembly posts...

Page 35: ...l against the top of a closed railing Measure the amount you may have to take off the bottom of the rock wall Cut the bottom of the rock wall to ensure that it fits flush onto the top of the top rail...

Page 36: ......

Page 37: ...Step 27 Cargo Net Assembly Place the cargo net onto the top of a closed railing Using the 120mm screws provided screw the cargo net into the top rail...

Page 38: ......

Page 39: ...nding on the slope of your surface They are secured using decking screws through the top and sides of the steps into the base of the tower Again ensure these holes are well pre drilled to avoid splitt...

Page 40: ...the same distance as the turn in the pole itself Dig a hole about 10 deep and 10 in diameter Place the fireman s pole into the hole and cut off any excess length so that the pole can be secured into...

Page 41: ...Step 30 Slide Assembly Using 2 decking screws secure the slide to the bottom timber of an open railing through the pre drilled holes in the slide...

Page 42: ......

Page 43: ...31 Cargo Net on A Frame Assembly Place the 3m 3 x 1 5 timber provided at a height of approximately 200mm from the ground to the bottom of the timber Secure them in place using the decking screws prov...

Page 44: ...Step 32 Cut the 3 x 1 5 flush with the A frame posts...

Page 45: ...he 3 x 1 5 timbers and divide equally Ensure that the gaps between the ropes are at least 230mm to prevent head entrapments Fix the horizontal rope first using the U nails provided Now using the rope...

Page 46: ...sembly the picnic table under your chosen frame Using the existing 1575mm 3 x 1 5 timbers that were placed at the bottom of the climbing frame Step 7 add an additional 2 x 1575mm 3 x 1 5 timbers besid...

Page 47: ...Step 35 Measure 300mm above the seating and mark all 4 posts Using the two 1755mm 3 x 1 5 timbers screw these into place to form straps for the tabletop...

Page 48: ...Step 36 Using 10 x 1575mm x 3 x 1 5 timbers centre these to form the table top itself Screw these into place using the 65mm decking screw provided again predrilling the holes...

Page 49: ...Step 37 Cut 3 pieces of 1575mm x 3 x 1 5 to size to use as supports for underneath the benches at each side and for the table and secure these using decking screws...

Page 50: ...Step 38 Swing Attachment Hang your chosen swings from the swing hooks...

Page 51: ...ostcrete has dried Step 40 Removing the H Frame supports Remove the lower H Frame supports that were added during steps 3 and 7 for the tower without the picnic table The final stage is to put on the...

Page 52: ...ve been put back Q How should I maintain my Climbing Frame A There are many customers whose Climbing frames last for years as a result of simple steps taken to ensure the wood s longevity The timber u...

Page 53: ...lenty of options and suggestions for you Q What else should I do A We suggest you check bolt tightness and all hardware periodically to ensure everything is in proper order We hope you enjoyed the cha...

Reviews: