©Novinium, Inc. 2016, all rights reserved.
Novinium, Inc.
22820 Russell Rd Kent, WA 98032
Revised: February 19, 2016
(253) 395-0200
Rejuvenation Instructions
#603 – Small Diameter Cables – SPR
This NRI covers the following:
The SPR injection process for small diameter, underground residential distribution
(URD) sized cables.
Setting up injection equipment.
Reading the liquid flow meter.
Calculating fluid amounts.
Knowing when to pin the cable to finish the injection.
Trademarks:
http://www.novinium.com/trademarks/
Patents:
http://www.novinium.com/patents/
WARNING:
It is dangerous working around energized high-voltage systems,
pressurized systems, and chemicals. Always work in accordance to the
Novinium Field Operations Safety Handbook (FOSH) or other local governing
safety standards
.