1
nuaire.co.uk
029 2085 8400
04. 09. 19. Leaflet Number 671789
The EMC Directive
2014/30/EU
The Low Voltage
Directive
2014/35/EU
UNI-X
Supply & Extract Ventilation Unit with Heat Recovery
Installation and Maintenance Instructions
1.0 SAFETY INFORMATION
•
Sharp edges need to be handled with caution. Care should be taken that all
personnel are aware of this and precautions are implemented to ensure that no
injuries are caused.
•
Items should only be lifted by competent personnel following appropriate risk
assessment.
•
The unit must be installed fully levelled, for the condensate drain and for compliance
with safety regulations relating to IP protection for water drip ingress.
•
The five core cable from the mains power supply should be connected to a fixed
wiring installation, via a fused isolator, in accordance with current IEE wiring
regulations.
•
The electrical wiring should be carried out by competent persons, in accordance with
industry practises and in conformance to all governing and statutory bodies.
•
Isolation - Before commencing work make sure that the unit, switched live and
Nuaire control are electrically isolated from the mains supply and switched live
supply.
•
The unit must be earthed.
•
In the event of an ESD discharge while operating the optional touch switch, the fan
control may reset itself causing the fans to switch off temporarily. Functions will
resume as normal after the control resets.
•
Disconnection from the supply mains must be incorporated within the fixed wiring in
accordance with the wiring regulations and shall have a minimum contact separation
of 3mm.
•
The supply cable must be replaced by an electrically competent person.