background image

100517-32 

              SUPER-SD1 

                            5055.201

OPERATING AND 
INSTALLATION 
INSTRUCTIONS

SAFETY NOTICE

If this stove is not properly installed, a 
house fire may result.  For your safety, 
follow the installation instructions.  
Contact local building or fire officials 
about restrictions and installation 
inspection requirements in your area.

TESTED and LISTED to CAN/ULC S627 
AND UL 1482
Meets the Environmental Protection 
Agency's May 2015 Particulate Emission 
Standards

IMPORTANT:
THESE INSTRUCTIONS ARE TO 
REMAIN WITH THE HOMEOWNER

MODEL: SUPER 27,
SUPER CLASSIC

DESIGN-D

SERIAL #

Visit www.pacificenergy.net for the most recent version of this manual

Summary of Contents for Classic Gas

Page 1: ...al building or fire officials about restrictions and installation inspection requirements in your area TESTED and LISTED to CAN ULC S627 AND UL 1482 Meets the Environmental Protection Agency s May 201...

Page 2: ...17 Wood Selection 17 DO NOT BURN 17 How to Test Your Wood 18 Lighting a Fire for the first time 18 Curing of the Paint Finish 18 Lighting a fire 18 Normal Operation 18 Restarting After Extended or Ove...

Page 3: ...PERMIS D INSTALLATION ET INSPECTIONS DANS VOTRE R GION NE RELIEZ PAS CET APPAREIL UN CONDUIT DE CHEMIN E DESSERVANT D J UN AUTRE APPAREIL TATS UNIS SEULE MENT UTILISEZ UN RACCORDEMENT NOIR OU CLASS D...

Page 4: ...building up at least as quickly in the chimney WARNING ONLY USE MATERIALS SUPPLIED BY MANUFACTURER WHEN DOING MAINTENANCE OR REPLACEMENTS 4 DOOR GASKETS The gasket used by Pacific Energy 7 8 22mm med...

Page 5: ...This moisture laden smoke cools the chimney compounding the problem by offering the smoke the ideal place to condense In summary a certain amount of creosote is inevitable and must be lived with Regul...

Page 6: ...andle a chimney fire 4 After the chimney fire is out the chimney must be cleaned and checked for stress and cracks before start ing another fire Also check combustibles around the chimney and the roof...

Page 7: ...Top heat shield and mounting bolt Baffle Gasket Brick Rails Manifold Blower The blower should be cleaned out a minimum every six months by using a vacumn on the grill openings in the back and bottom...

Page 8: ...5 8 702mm 23 5 8 600mm 23 5 8 600mm 23 5 8 600mm 10 254mm 10 254mm 10 254mm 23 7 8 606mm 27 1 2 699mm 29 737mm 29 737mm 27 1 2 699mm 28 1 4 718mm Super 27 Pedestal Super 27 Pedestal Super Classic Figu...

Page 9: ...ash system hole cover and gasket located under the stove Discard cover plate and gasket 2 Inside the stove remove the two bolts for the ash dump from the firebox bottom Figure 2 and insert into the b...

Page 10: ...Brace knockout on page 10 5 Re install the Pedestal Brace with the notched corner to the top left Install the new Ash Pan into the Pedestal 1 2 Leg Model 1 Remove the two screws holding the Leg Ash B...

Page 11: ...to the connector or chimney manufacturer s installation require ments Consult your chimney supplier for installation advice Procedure CAUTION THE STRUCTURAL INTEGRITY OF THE MOBILE HOME FLOOR WALL AN...

Page 12: ...14 357mm 26 660mm 16 406mm 18 457mm 22 559mm 28 711mm 8 203mm 8 203mm 8 203mm Alcove Min Height 7 1 2 2 29m Max Depth 4 1 22m 5 127mm 15 381mm Single Wall Connector Residential Double Wall Connector R...

Page 13: ...ible floor protector 48 1219 mm 3 914 mm Minimum Hooded vent or 90 elbow turned down The chimney may incor porate an offset To do this safely all sections of listed connector off set elbows and chim n...

Page 14: ...ram 1 page 6 Chimney and Connector Connect to a listed chimney or a chimney suitable for use with solid fuel that is lined and in good condition and meets local building codes The chimney flue size sh...

Page 15: ...f the pipe inside the stove collar Use holes provided in collar to secure pipe with two screws 5 Install the remaining lengths of pipe one on top of the other to the finished height of the chimney con...

Page 16: ...e and 8 203 mm to the other sides Canada Only 8 203mm 18 457mm 8 203mm 8 203mm Minimum Width 40 1 02m Minimum Overall Depth 50 1 2 1 28m Non combustible floor protector Figure 8 Floor protector Canada...

Page 17: ...outside combustion air for residential installation requires the unit to be secured to the structure to prevent dislodging of the air duct To draw outside air from behind the stove an outside air adap...

Page 18: ...nths or more Wet or undried wood will cause the fire to smoulder and produce large amounts of creosote Wet wood also produces very little heat and tends to go out often DO NOT BURN Salt water wood Gar...

Page 19: ...mm 1 25mm until the wood kindling is fully engulfed in flame 4 After the kindling is fully engulfed add a few small logs Close door 5 Begin normal operation after a good coal base exists and wood has...

Page 20: ...od has approximately 7500 BTU s per pound Experience will give you the right settings for proper combustion and efficient burning Remember the correct air inlet setting is affected by variables such a...

Page 21: ...be placed on a non combustible floor or on the ground well away from all combustible materials pending final disposal If the ashes are disposed of by burial in soil or otherwise locally dispersed the...

Page 22: ...up to operating temperature It will also shut the blower off after the fire has gone out and the unit cooled to below a useful heat output range Manual To manually operate the blower set the rocker sw...

Page 23: ...e gasket Check door latch Low Heat Output 1 Wood may be wet Check wood and use drier wood if required 2 Fire too small Build a larger fire Open draft control to increase burn rate 3 Draft too low Chim...

Page 24: ...fic Energy for the location of the dealer nearest you 1 24 25 11 28 18 21 19 1 28 28 2 10 8 9 10 7 6 26 5 4 27 17 3 9 13a 13b 14 14 12 14 15 16 20 28 SUPD LGADA SUPD ASHLEG Replacement Parts Super 27...

Page 25: ...16 Replacement Baffle Kit SSER DBAKIT 17 Baffle Pin SSER 125001 All parts may be ordered from your nearest Pacific Energy dealer Contact Pacific Energy for the location of the dealer nearest you When...

Page 26: ...ion keeps the combustion zone hot Active flaming takes place during the first part of the burn During this stage heat is stored in the mass of the unit and is later released slowly and evenly As wood...

Page 27: ...ut system or an optional one is being installed save the extra full brick With the heater in the upright position install firebricks as follows Place firebricks on the bottom of the heater first Total...

Page 28: ...th or without an ash dump 2 Once the firebricks for the floor have been laid down the firebricks for the side walls are next The sides use D bricks The bricks will stand on top of the floor bricks and...

Page 29: ...an ash dump use a full size D brick instead of A B firebricks Again the one exception is the C brick D D D Figure 15 Rear wall firebrick installation complete Figure 16 Floor of firebox without ash d...

Page 30: ...Energy s option The defective part may be required to be returned to Pacific Energy or an accredited agent transportation prepaid Porcelain Is warranted for gloss retention Certain colors may darken w...

Page 31: ...SUPER SD1_100517 32 31 5055 201...

Page 32: ...V9L 6V8 Phone 250 748 1184 Web site http www pacificenergy net Printed in Canada 2017 Copyright Pacific Energy Fireplace Products LTD Reproduction adaptation or translation without prior written perm...

Reviews: