background image

Inspection Certificate 

Controlecertificaat 

● Kontrollschein ● Bulletin de contrôle ●  Certificato 

di controllo  

● Certificado de control 

 
 

Please keep safely! 

Zorgvuldig te bewaren! 

● Bitte gut aufbewahren! ● A bien conserver, 

s.v.p.! ● Da conservare! ● ¡A conservar! 

 

                     Art. Nr. FRF44-3556   

3.05.2012 

 

English:

 The house you have purchased was manufactured in accordance with the high quality norms. The building unit has been carefully inspected and 

packed. In order to avoid possible problems during the assembly carried out by yourself or the building company of your choice, we recommend that you 
inspect the delivery for its completeness in accordance with the list of pieces before assembly. This inspection must be carried out within 14 days after 
delivery to your place. Warranty claims are limited to the exchange of defective materials. Defective building parts, which have already been used or painted, 
are excluded from being replaced. All further claims are excluded! In cases of complaints, please pay attention to the following procedures: Please present 
this inspection certificate along with the sales receipt to your place of purchase. Only in cases where these documents are presented will the complaint be 
dealt with quickly and without complications. 

Dutch

: Het door U gekochte tuinhuis werd vervaardigd volgens de hoge kwaliteitsnormen. Het tuinhuis werd zorgvuldig gecontroleerd en verpakt. Om tijdens 

de montage, uitgevoerd door Uzelf of een door U gekozen aannemer, problemen te vermijden, raden we U aan, vÓÓr de montage, de  levering te 
controleren op volledigheid in overeenstemming met de onderdelenlijst. Deze controle dient te gebeuren binnen 14 dagen na levering bij U thuis. 
Waarborgvorderingen zijn beperkt tot het vervangen van gebrekkig materiaal. Gebrekkige onderdelen die reeds gebruikt of geschilderd zijn, zijn uitgesloten 
van vervanging. Alle latere vorderingen zijn uitgesloten! In geval van klachten, gelieve dan te letten op de volgende procedure: Leg dit controlecertificaat, 
samen met Uw aankoopbewijs voor aan Uw verkoper. Enkel in gevallen waarbij deze documenten voorgelegd worden, zal de klacht snel en zonder 
complicaties behandeld worden.

 

Deutsch:

  Das von Ihnen gekaufte Haus wurde nach der hohen Qualitätsnorm gefertigt. Der Bausatz wurde sorgfältig geprüft und verpackt. Um etwaige 

auftretende Probleme während des Aufbaus durch Sie oder Ihre Aufbaufirma zu vermeiden, kontrollieren Sie bitte die Lieferung auf Vollständigkeit laut 
Stückliste vor dem Aufbau. Diese Kontrolle muss innerhalb 14 Tagen nach Anlieferung bei Ihnen erfolgen. Ansprüche auf Gewährleistung beschränken sich 
auf den Austausch von fehlerhaftem Material. Fehlerhafte Bauteile, die bereits verbaut oder gestrichen wurden, sind vom Umtausch ausgeschlossen. Alle 
weiteren Ansprüche sind ausgeschlossen! Sollte es zu einer Beanstandung kommen, beachten Sie folgende Vorgehensweise: Legen Sie Ihrem Fachhändler 
diesen Kontrollschein zusammen mit dem Einkaufsbeleg vor. Nur bei Vorlage dieser Unterlagen ist eine schnelle und problemlose  Bearbeitung Ihrer 
Beanstandung möglich. 

Français:

 La cabane que vous venez d’acheter a été fabriqué en respectant de hautes normes de qualité. L’ensemble de construction a été testé et emballé 

avec soin. Afin d’éviter des problèmes éventuels pendant la construction par vous-même ou la société de construction mandatée, nous vous prions de bien 
vouloir vérifier que toutes les pièces ont été fournies selon la liste des pièces avant que vous ne commenciez la construction. Il vous incombe de faire ce 
contrôle dans les 14 jours après la fourniture. Les revendications en dédommagement se limitent à l’échange de matériel défectueux. Des pièces de 
construction défectueuses, déjà construites ou peintes, sont exclues de  tout échange. Toutes les revendications ultérieures sont exclues ! Si une 
réclamation avait lieu, veuillez respecter le déroulement suivant : Il vous faudra présenter, à votre commerçant spécialisé, ce bulletin de contrôle avec le 
récépissé de l’achat. Ce ne sera que moyennant présentation de ces documents qu’un traitement rapide et sans problème de votre réclamation sera 
possible! 

Italiano:

  La casetta che avete acquistato è stata prodotta secondo la norma di alta qualità. Il kit è stato controllato ed imballato con cura. Per evitare 

eventuali inconvenienti durante il montaggio, si prega di verificare, prima del montaggio, la completezza della fornitura in base alla distinta dei pezzi. Tale 
verifica deve essere effettuata entro 14 giorni dalla consegna. Eventuali diritti di garanzia si limitano alla sostituzione di materiale difettoso. Gli elementi 
difettosi già montati o verniciati sono esclusi dal diritto alla sostituzione. Ogni altro diritto resta escluso! In caso di reclamazione, procedere nel modo 
seguente: presentare questo certificato di controllo unitamente alla prova d’acquisto al rivenditore. Solo in questo modo la Sua reclamazione potrà essere 
evasa rapidamente e senza problemi. 

Español: 

La casa que ha adquirido ha sido fabricada de acuerdo con normas de alta calidad. Las piezas de la casa han sido cuidadosamente 

inspeccionadas y embaladas. Con el fin de evitar posibles problemas durante el montaje, hecho por usted o por la empresa de construcción de su elección, 
le recomendamos revisar el paquete entregado, con la lista de piezas, antes de armar la casa. Haga la revisión dentro de 14 días después de recibir el 
paquete. La garantía se limita a reemplazar las piezas defectuosas. No se reemplazarán las partes defectuosas que ya hayan sido utilizadas o pintadas. ¡No 
se aceptan otras reclamaciones! En casos de queja, por favor, presente este certificado junto con la factura en el lugar donde hizo la compra. Sólo 
presentando estos documentos podremos resolver su problema rápidamente y sin complicaciones. 

 
Factory inspection by

 

● Fabriekscontrole door ● Werkskontrolle durch ● 

Contrôle à partir de l’usine par ● Collaudato da ● Inspector de fábrica: 
……………………...……………………………………………………....... 

 
Pack number

 

● Pack Nr. ● Pack Nr.● Packet n° ● Pacco N. ● Paquete N

o

:

 

 
…………………

Date 

● Datum ● Date ● Data ● Fecha :…..............…………… 

 

To be completed by buyer! (Please use block letters) 

 

In te vullen door de verkoper! (Graag in drukletters) 

 

Vom Käufer auszufüllen! (Bitte in 

Druckschrift) 

● A remplir par l’acheteur! (en lettres d’imprimerie, s’il vous plaît) ● Da compilare dall’acquirente! (in stampatello) ● ¡Completa el cliente! (en 

mayúsculas) : 

Place of purchase

 

● Plaats van aankoop ● Bezugsquelle 

● Source d’achat ● Acquistato presso ● Lugar de 
compra : 
…………………………………………………………………
…………………………………………………………………

 

Sales receipt No.

 

● Aankoopbewijs Nr. ● Kaufbeleg-Nr. ● 

Récépissé n° ● Prova d’acquisto N. ● Recibo N

o

 .…….......

 

Delivery date 

● Leveringsdatum ● Lieferdatum ● Date de 

livraison ● Data di consegna ● Fecha de entrega: .……….

 

Buyer’s address

 

● Adres koper ● Kundenanschrift ● Adresse du client ● Indirizzo del cliente ● 

Dirección  del cliente: .…………………………………………………………………………………… 

Telephone 

● Telefoon ● Telefon ● Téléphone ● Teléfono: ...……………………..……...............

 

Sales receipt date

 

● Aankoopbewijs -Datum ● Kaufbeleg-Datum ● Date du récépissé ● Data 

prova d’acquisto 

● Fecha recibo :………….…...…………………………………………………….

 

Forwarder: 

 Pick-up 

 Others

 

● Door:

 

 Verzending 

 Zelf afhalen 

 Spedition 

 

Selbstabholer 

● Par: 

Transporteur 

 Propres moyens 

● Tramite: 

 Spedizioniere 

 Mezzo 

proprio 

● Entrega:Transporte organizado 

 transporte propio 

Description of complaint  

● Beschrijving van de klacht ● Schilderung der Beanstandung ● Déscription de la réclamation ● Descrizione della reclamazione 

● Descripción del problema: 

Please keep the parts which are the object of the complaint until the complaint is settled!

 

● Gelieve de betrokken 

onderdelen te bewaren tot de klacht is afgehandeld 

● Veuillez garder les pièces contestées jusqu’à ce que la réclamation soit traitée définitivement! ● Si 

prega di conservare i pezzi reclamati fino all’evasione della reclamazione! 

● Por favor, conserve las piezas objeto de la queja hasta que el problema haya 

sido resuelto 

………………...........................................................................................………………....................................................………
………....................................................………………....................................................……………….........................................
...........………………....................................................………………....................................................………………....................
................................………………....................................................………………....................................................……………
…....................................................………………....................................................……………….................................................
...………………....................................................………………....................................................………………............................
........................………………....................................................………………....................................................……………….......
........................………………....................................................………………....................................................……………….......
........................………………....................................................………………....................................................……………….......
........................………………....................................................………………....................................................……………….......
.............................................………………..................................................................................................................................... 

 

Summary of Contents for FRF44-3556

Page 1: ...eintes sont exclues de tout change Toutes les revendications ult rieures sont exclues Si une r clamation avait lieu veuillez respecter le d roulement suivant Il vous faudra pr senter votre commer ant...

Page 2: ..._________________________________________________________________ P dansk Kontrol Certifikat Opbevares sikkert Dansk Det k bte hus er fremstillet i overensstemmelse med de h je kvalitets krav Produkte...

Page 3: ...re tekniske egenskaper ved produktet Alle rechten en technische wijzigingen voorbehouden Installation manual Montageanleitung Notice de montage Istruzioni per il montaggio Manual de montaje Monterings...

Page 4: ...f the house We can only review complaints if you submit the control number of the house to the seller Peculiarities of wood as a natural material The warranty does not cover Wooden details already pai...

Page 5: ...windows with a wood impregnation agent and do that namely both inside and outside Otherwise the doors and windows can become twisted After the house assembly is completed we recommend for the conclusi...

Page 6: ...At the same time make sure that there are sufficient air apertures under the house floor for ventilation We recommend the following foundation options Strip or spot foundation Foundation from concrete...

Page 7: ...r that The logs are always assembled with their tongue upwards If necessary use the hitting block and hammer Never directly hit the tongue with the hammer Install the walls in accordance with the appe...

Page 8: ...you reach the window height The wall plans see Technical specifications show how many logs go under the window Install the window similarly with the door Just like the door push the window frame with...

Page 9: ...r plane the apex or sidewall log somewhat lower Roof Before installing the roof boards make sure that the house is completely level Use the water level to check all walls ATTENTION When placing the ro...

Page 10: ...t least 10 cm NB Some house options do not include it in the kit Having installed the roof cover material attach the wind braces to the roof and the facia boards to the rafters and upper wall logs Ins...

Page 11: ...n the screws tightly so wood can further swell or diminish With the house having settled you should adjust the attachments so the wall logs can settle Installation of storm braces General advice Probl...

Page 12: ...trollnummer des Hauses Es ist m glich die Reklamation nur dann als Garantiefall zu behandeln wenn Sie die Kontrollnummer Ihrem Fachh ndler weitergeben Abweichungen die keinen Reklamationsgrund darstel...

Page 13: ...r wichtig sowohl die Innen als auch die Aussenseiten der T ren und Fenster auf einmal zu streichen Andernfalls k nnen sie sich verziehen Nach dem Aufbau empfehlen wir Ihnen die Aussenhaut ohne Dach zu...

Page 14: ...Fundamentvorschl ge Streifen oder Punktfundament Beton bzw Gehwegplattenfundament gesch ttetes Betonfundament Bereiten Sie das Fundament so vor dass die Lagerh lzer berall im Abstand von max 50 60 cm...

Page 15: ...Hammer direkt auf die Feder schlagen Die Wandpl ne Siehe Technische Daten zeigen Ihnen den Aufbau der W nde Als erstes verlegen Sie die halben Bohlen der Vorder und R ckwand und befestigen Sie sie mit...

Page 16: ...hren Sie fort die W nde hochzuziehen bis Sie zur Fensterh he gelangen Aus den Wandpl nen siehe Technische Daten wird ersichtlich wie viele Bohlen unter den Fenstern sind Beim Einsetzen der Fenster ver...

Page 17: ...en der Dachbretter ist darauf zu achten dass das Haus hundertprozentig in Waage steht berpr fen Sie mittels einer Wasserwaage alle 4 Seitenw nde WICHTIG Der Dachbelag darf nur ber eine standfeste Leit...

Page 18: ...bei der Anbringung der n chsten Lagen dass diese mindestens 10 cm ber die vorherige Lage berlappen Nach dem Einlegen der Dachpappe erfolgt die Montage der Windbretter und die Befestigung der Giebelbl...

Page 19: ...n Sie die Leisten von der oberen Seite k rzer Die Schlossschrauben d rfen nur Handfest angezogen werden damit das Holz weiterhin arbeiten kann Wenn das Haus sich gesetzt hat m ssen die Befestigungen r...

Page 20: ...e peut tre trait e dans le cadre de la garantie que si vous communiquez le num ro de contr le votre revendeur sp cialis Ecarts qui ne constituent pas un motif de r clamation Le bois est un produit nat...

Page 21: ...l est tr s important de peindre en une seule fois aussi bien les faces int rieures que les faces ext rieures des portes et des fen tres Dans le cas contraire elles pourront se d former Une fois le mon...

Page 22: ...ment ventil e par dessous Nous vous proposons les fondations suivantes Semelle filante ou fondations ponctuelles Fondations en b ton ou fondations en dalles de ciment Fondations coul es en b ton Pr pa...

Page 23: ...oujours ressort tourn vers le haut En cas de besoin utilisez la planche frapper et le marteau Ne jamais frapper directement sur le ressort avec le marteau Les plans des parois voir partie Caract risti...

Page 24: ...des fen tres Continuez monter les parois jusqu ce que vous arriviez la hauteur des fen tres Les plans des parois voir Caract ristiques techniques vous indiquent combien il y a de madriers sous les fen...

Page 25: ...Avant la pose des planches du toit il convient de veiller ce que la maison soit cent pour cent de niveau A l aide d un niveau bulle d air v rifiez les 4 parois lat rales IMPORTANT Le rev tement du toi...

Page 26: ...s pour carton bitum en respectant un espacement de 15 cm environ Lors de la mise en place des couches suivantes veillez ce que celles ci recouvrent la couche pr c dente sur 10 cm au moins Apr s la pos...

Page 27: ...as de besoin raccourcissez les baguettes du c t sup rieur Les vis t te bomb e et collet carr ne doivent tre serr es qu la main afin que le bois puisse continuer travailler Une fois que la maison s est...

Page 28: ...la documentazione Sul certificato di controllo riportato il numero di controllo della casa Reclami possono essere evasi in garanzia unicamente se comunicherete il numero di controllo al vostro negozi...

Page 29: ...re con un colore di fondo E molto importante verniciare sia il lato interno che quello esterno delle porte in un unica soluzione altrimenti potrebbero deformarsi Dopo il montaggio consigliamo di appli...

Page 30: ...meglio dall umidit Ricordate inoltre che la casetta deve essere sufficientemente ventilata Nostri consigli per le fondamenta Fondamenta a strisce o punti Fondamenta in calcestruzzo risp fondamenta con...

Page 31: ...chio verso l alto Se necessario usare il blocchetto di legno ed il martello Non battere mai con il martello direttamente sul maschio Gli schemi delle pareti vedi parte Dati Tecnici illustrano il monta...

Page 32: ...pareti fino a raggiungere l altezza delle finestra Dagli schemi della parete vedi Dati Tecnici risulta quante tavole si trovano sotto le finestre Per inserire le finestre procedere esattamente come p...

Page 33: ...posa delle tavole tetto controllare che la casetta si trovi al 100 in piano Controllare con una livella a bolla d aria tutte e 4 le pareti laterali IMPORTANTE Il rivestimento del tetto deve essere ap...

Page 34: ...elle strisce nel senso della lunghezza dalla parte posteriore verso quella anteriore Lasciare sporgere la prima striscia lateralmente di ca 2 4 cm grondaia Fissare il cartone catramato con gli apposit...

Page 35: ...listelli antivento vengano fissati in alto sulla tavola del timpano e sotto nel centro della prima tavola parete intera Al bisogno accorciare i listelli dalla parte superiore Le viti a testa quadra de...

Page 36: ...olamente si usted suministra al vendedor el n mero de control de su casita de madera Caracter sticas peculiares de la madera derivadas de la misma como un material natural La garant a no cubre Element...

Page 37: ...como por fuera de las superficies de las puertas y ventanas En caso contrario se pueden desarrollar deformaciones Despu s del ensamblaje de la caba a recomendamos para su acabado el uso de pintura re...

Page 38: ...a asegurar la ventilaci n Le recomendamos los siguientes tipos de cimentaci n Cimentaci n de bloques o de tiras Cimentaci n de losas de hormig n o de pavimento Cimentaci n de hormig n in situ Construy...

Page 39: ...regado Instalaci n de los rastreles de cimentaci n Paredes Durante el montaje de las paredes recuerde que Todos los elementos han de ser montados con la leng eta hacia arriba Si es necesario use los b...

Page 40: ...elementos laterales con las manillas de las puertas tienen bisagras y contra imagen Es recomendable instalar los paneles de la puerta m s tarde Las puertas simples tienen el marco de la puerta y el pa...

Page 41: ...ces asegurando que el tejado es colocado firmemente y en su lugar correcto Ahora coloque las viguetas de tejado en el las terminaciones de cuatro aguas en las muescas para las vigas Compruebe que el e...

Page 42: ...los aleros del tejado Material del tejado NB Algunos modelos no lo tienen incluido en el paquete de entrega Corte el material de la cubierta de acuerdo con la longitud de la cubierta en trozos adecua...

Page 43: ...l suelo pueden ser puestas muy cerca unas de las otras porque cada vez se secar n m s y pueden aparecer aberturas entre las tablas Protecci n contra tormentas NB No incluido en el paquete de entrega d...

Page 44: ...iado firmemente afloje un poco el tornillo Si las tuber as de lluvia han sido fijadas a las paredes afloje un poco el cierre que sujeta las tuber as Problema Puertas ventanas est n atascadas Causa La...

Page 45: ......

Page 46: ......

Page 47: ...Side slat Randleiste Baguette en bordure Pos mm mm mm pcs Sis A 19 95 986 2 Sis B 19 70 1018 4 Sis C 19 70 846 2 A C B B...

Page 48: ......

Page 49: ......

Page 50: ......

Page 51: ......

Page 52: ......

Page 53: ......

Page 54: ......

Page 55: ......

Page 56: ......

Reviews: