background image

© 2007 Matsushita Electric Industrial Co., Ltd. All
rights reserved. Unauthorized copying and distribu-
tion is a violation of law.

Order No VCB0703005CE

Vacuum Cleaner

MC-CG475-BE7A

Product Color

: Metalic blue

Destination

: Germany

TABLE OF CONTENTS

PAGE

PAGE

1 Specifications

-----------------------------------------------------

2

2 Location of Controls and Components

-------------------

3

3 Troubleshooting Guide

-----------------------------------------

5

4 Disassembly and Assembly Instructions

----------------

6

4.1. Dust box cover assembly removal -------------------- 6
4.2. Separate the upper and lower body units ----------- 6
4.3. Printed circuit board assembly (P.C.B Ass’y)

removal------------------------------------------------------- 7

4.4. Motor removal ---------------------------------------------- 9
4.5. Cord reel partition unit replacement -----------------10
4.6. Rail base U replacement -------------------------------10
4.7. Spring-loaded cord reel pre-winding -----------------10
4.8. How to disassemble the turbine nozzle  ------------ 11

5 Wiring Connection Diagram

---------------------------------

12

6 Exploded View and Replacement Parts List

-----------

13

6.1. EXPLODED VIEW (ATTACHMENTS) --------------13
6.2. PARTS LIST (ATTACHMENTS) ----------------------14

6.3. EXPLODED VIEW (BODY UNIT)-------------------- 15
6.4. PARTS LIST (BODY UNIT)---------------------------- 16
6.5. PACKING INSTRUCTIONS --------------------------- 17
6.6. PACKING LIST ------------------------------------------- 18

Summary of Contents for MC-CG475

Page 1: ...ns 6 4 1 Dust box cover assembly removal 6 4 2 Separate the upper and lower body units 6 4 3 Printed circuit board assembly P C B Ass y removal 7 4 4 Motor removal 9 4 5 Cord reel partition unit replacement 10 4 6 Rail base U replacement 10 4 7 Spring loaded cord reel pre winding 10 4 8 How to disassemble the turbine nozzle 11 5 Wiring Connection Diagram 12 6 Exploded View and Replacement Parts Li...

Page 2: ...C CG475 Power source AC230 50Hz Input power MAX 2500W Input power Nominal 2100W Power control O Extension wand Telescopic Turbin nozzle O Dimensions WxLxH mm 280x425x260 Net weight 5 3kg Cleaning tools Crevice nozzle Dusting brush ...

Page 3: ...3 2 Location of Controls and Components ...

Page 4: ...4 ...

Page 5: ... the P C B Ass y with new one Motor runs but there is no suction Hose or Suction inlet Check if there is any blockage in the hose or suction inlet If there is any blockage remove it Dust bag Secondary filter Check if dust bag is full or Second ary filter is choked up If dust bag is full replace with a new one If Secondary filter is choked up remove and clean it out or replace Noise or vibration Mo...

Page 6: ...he dust box cover assembly at an angle of approx 45 Insert a flat blade screwdriver between the upper body and the dust box cover assembly and move it in the direction of the arrow mark to remove the dust box cover assembly from its right side 4 2 Separate the upper and lower body units 1 Remove the five screws fixing the upper body U and lower body U 2 Remove the screw fixing the upper body U fro...

Page 7: ...l cap unit and Insulation plate 2 3 Wiring illustration 4 Remove the P C B Ass y from the P C B holder When removing the P C B Ass y widen the frame of the P C B holder and then remove the P C B from the hook of the P C B holder Note When removing the P C B Ass y do not bend it to prevent it from damage such as broken wire of the P C B ...

Page 8: ...uit board and that of the lead wire from the motor Note When removing the fastening terminal of the lead wire please hold the terminal fixed to the printed circuit board to prevent an excessive load from being applied to it 6 Remove the two screws fixing the P C B holder and pull it out from the lower body U ...

Page 9: ...t the motor section from the lower body U 2 Remove all components fitted to the motor a Remove the motor support rubber rear b Remove the motor support front c Remove the noise suppressor d Remove the motor support rubber front ...

Page 10: ... replacement 1 Remove the screw fixing the rail base U onto the cord reel partition U 2 Remove the rail base U from the cord reel partition U 4 7 Spring loaded cord reel pre winding 1 The cord reel partition U has a spring that pre winds the cord reel If the cord is not wound then press the brake arm and the cord pre winding will be loosened When making spare turns again do it in the direction of ...

Page 11: ... floor nozzle upper U from the floor nozzle lower U 1 Remove the four screws fixing the floor nozzle lower U Fig 21 2 Remove the floor nozzle lower U 4 8 3 Turbine Ass y 1 Pull up the floor nozzle wand U and remove the turbine ass y Fig 22 4 8 4 Removal of the floor nozzle brush CU DU EU FU 1 Turn the floor nozzle lower unit over Insert the tip of a flat blade screwdriver into the ditch in the bru...

Reviews: