FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp
INSTRUCTIONS CM308F
© Panduit Corp. 2017
Mounting Kits
(sold separately)
Front/Rear
Front Only
WMPVCBE, NRVCB
(Center Mount)
WMPV22E
WMPVF22E
(Standard mounting for
WMPV45E
WMPVF45E
Panduit 2 and 4 post racks
WMPVHC45E
WMPVHCF45E
racks. One kit Included.)
NRV6
NRVF6
NRV10
NRVF10
NRV12
NRVF12
VERTICAL CABLE
MANAGEMENT
R4P Series of Racks
R2P Series of Racks
Doors
WMPV Includes
Cover
NRD6B1
NRD10B1
NRD12B1
Racks
R2P Series of Racks
R4P Series of Racks
ER4P Series of Racks
WMPVSMK (Side Mount)
(Optional Mounting for
4 post racks and R2PS)
(Required Mounting for R2P6S)
Page 1 of 3
N
ET
R
UNNER
Vertical Cable Managers
PART NUMBERS
Location pin(s)
#12-24 Screws
Rear Bottom Mounting
Location
Top Mounting Location
Bottom Mounting Location
#12-24 Screws
Bracket Installation
Note:
For additional brackets when
installing between two racks use
part number
WMPVCBE
or
NRVCB
. Bracket is keyed to be
installed in the correct orientation.
Standard Rack Installation
2
3
4
1
Note:
Arrows and flags
must point upward
Dimensions in () parenthesis are for 6” Vertical Cable Management
Location Guide for Center Mounting
(
R2P
with
WMPVCBE and NRVCB
)
Table 1