background image

INSTRUCTIONS CM281G

© Panduit Corp. 2010

FOR TECHNICAL SUPPORT www.panduit.com/resources/install_maintain.asp 

Page 1 of 4

Modular 

N

ET

F

RAME

 Rack and Accessories

Part Numbers: NFR84, NFD484, NFSK, NFDR4X6K, NFCDRK, NFVSM4, NFEDB23, 
NFSHLF19X18, NFSHLF19X25, NFLRB, NFEP, NFD884, NFD1284,  NFREB2, NFBRFK

Optional Accessories

NFR84

Modular 

N

ET

F

RAME

 Rack

(8) D-rings

NFDR4X6K

Rack Assembly

(1) Vertical 
Slack Manager

NFVSM4

Step1

Lay the two vertical channels 
on the floor or a pair of sturdy 
saw horses to ease installa-
tion.

Install (1) Base Angle and 
Front Top Flange on the verti-
cal channels using (8) 3/8” 
bolts, lockwashers and nuts 
provided. 

Do not tighten.

19” Mounting

23” Mounting

(2) Vertical Channels
(2) Base Angles
(1) Pack of (20) 3/8x1.00
     Bolt, Lockwasher, Nut
(1) Front Top Flange
(1) Rear Top Flange
(2) Center Waterfalls
(1) Pack of (25) #12-24x1/2” Screws
(1) Grounding and Hardware Kit

(16) Center 
D-rings

NFCDRK

(1) 

N

ET

F

RAME

 Extender 

Door Brackets for
23” Mtg
(4) #10-32 Screws

NFEDB23

(1) End Panel
(6)3/8”-16x1.625” Hex Bolts
3/8”-16 Hex Nuts
3/8” Split Lockwashers

NFEP

(1) Ladder Rack 
Bracket
(2)3/8”-16x1” Hex Bolts
3/8”-16 Hex Nuts
3/8” Split Lockwasher

NFLRB

(1) Shelf
(4) #12-24 Screws

NFSHLF19x18

 

NFSHLF19x25

 

(shown)

(1)  Door, 4” wide w/
Mtg Brackets
(4) #10-32 Screws

NFD484

(1)  Center 
Door, with 
brackets

NFD884
NFD1284

(2) Rear Extender 
Bracket
(8) #12-24 Screws

NFREB2

(8) Bend Radius Fingers

NFBRFK

Vertical 
Channel 

Base Angle

Front Top 
Flange

Step 2

Roll the rack on its side to install 
the other base angle and rear 
top flange using (8) 3/8” bolts, 
lockwashers and nuts provided. 

Do not tighten

.

Rear Top Flange

Base Angle

(1) Spool
(2)#12-24 Screws

NFSK

Summary of Contents for NetFrame NFR84

Page 1: ...s 1 Pack of 20 3 8x1 00 Bolt Lockwasher Nut 1 Front Top Flange 1 Rear Top Flange 2 Center Waterfalls 1 Pack of 25 12 24x1 2 Screws 1 Grounding and Hardware Kit 16 Center D rings NFCDRK 1 NETFRAME Extender Door Brackets for 23 Mtg 4 10 32 Screws NFEDB23 1 End Panel 6 3 8 16x1 625 Hex Bolts 3 8 16 Hex Nuts 3 8 Split Lockwashers NFEP 1 Ladder Rack Bracket 2 3 8 16x1 Hex Bolts 3 8 16 Hex Nuts 3 8 Spli...

Page 2: ...h 12 24 screws Attach Front Bracket to front of rack at desired height with 12 24 screws Attach Shelf Plate to Front and Rear Brackets with the 10 32 screws The Shelf Plate C Channel mates with the bracket J Slot to provide adjustable mounting Can be mounted flush or extended 6 inches Shelf Installation NFSHLF19X18 NFHSLF19X25 Rear Extender Bracket Installation NFREB2 2 12 24 SCREWS Use 2 12 24 sc...

Page 3: ...nue upwards on the right side Start finger installation from top of rack and continue down on the left side NETFRAME Vertical Slack Manager NFVSM4 Spool Installation Step 1 Align buttons with mounting leg slot Step 3 Apply downward pres sure until plastic spool clicks into place Step 2 Push buttons through back bone until mounting face is flush with backbone Removal Replacement Step 4 Pull back on...

Page 4: ... and Bottom Bracket with 10 32x5 16 screws provided 3 Door installs to top and bottom brackets by aligning lower hinge pin to hinge pin mounting hole Squeeze knobs together then align upper hinge pin to upper hinge pin mounting hole Release pressure on knobs to set door in place Top Bottom Bracket NFD884 NFD484 installed to NETFRAME with 4 10x32 screws provided Door Installation NFD484 NFEDB23 NFE...

Reviews: