background image

The package includes the following items.

 

1 x UPBv2 aluminum enclosure

8 x M3x6mm Allen bolts

4 x M3x14mm Philips screws

Pegasus Ultimate Power Box v2 2020 enclosure installation

Step 3

Slide out the circuit board and place it on the new bottom part as shown in the photos below.

Your older circuit board doesn’t have holes to secure it on the available threads of the bottom part of the enclosure. 

Therefore, there is a piece of foam glued so when you placed the circuit board, the pins of the Dew Heater sockets 

will make holes into it and will keep the board in place.

old enclosure

Step 2

Untie the four (4) stock screws from one side of your old enclosure, 

displayed by the black arrows.

1/2

Step 1

Untie the four (4) bottom screws from the new enclosure.

Store the old enclosure and all of its screws
as you don’t need them anymore.

Reviews: