background image

MOUNTING 

• 

Locate the pump in the deepest position in the 
bilge. Keep away from high heat source. 

• 

Mount quick disconnect bracket to bulkhead or 
stringer with #10 S.S. screws. Do not drive 
screws through hull. 

• 

Route smooth I.D. discharge tubing to a thru-hull 
fitting well above the water line . Avoid any      
sagging or loops in the tubing. Tubing must go 
up from the pump to the thru-hull fitting. 

911-742-H 

 

 

 

 

 

 

 

 

 

Page 1 of 2 

ELECTRICAL WIRE:  

Use 16GA wire for all circuits. If installation is over 20 feet, use 14GA wire. Brown pump wire must be 
hooked to positive power for maximum flow. Wire is tinned to prevent corrosion. PANEL SWITCH:     
Attach all wires to UL Marine approved duty switch with auto-off-manual, rated at or above 15 amps. 
FUSE: Install a fuse per pump label specifications . CONNECTIONS: Wire connections should be made 
above the highest possible water level. Seal wire connections to prevent corrosion and electrolysis. 

OPERATION 

 

DO NOT RUN PUMP DRY. ALWAYS TEST PUMP AND SWITCH BEFORE LEAVING DOCK. 

 

EXPLODED VIEW 

358™SHURflo BILGE PUMP 

Installation and Operation Instructions

 

ADVANCED BILGE PUMP FEATURES 

 

• 

Anti-Airlock 

• 

Tough Nylon Housing  

• 

Tinned 6’ Wire Assembly  

• 

Water Cooled Motor 

• 

Submersible 

• 

Ignition Protected 

• 

ISO 8846, ABYC, NMMA Type Accepted, CE 

Baseplate tabs press 
in for easy removal. 

Remove all 7 screws for 
cleaning if necessary. 

* not supplied 

Reviews: