background image

ECV

-645-MD 

Installation 

Instructions,Anchorless 

Method 

M-54186-1 

Rev

. A.

(1/4) 

March 

2015

ECV-645-MD hurricane louver

installation instructions - anchorless method 

page 1 of 4

IMPORTANT: READ ALL INSTRUCTIONS BEFORE PROCEEDING WITH INSTALLATION

Single Section Louver Installation

Locate all crates, boxes, cartons, etc.

Remove  louvers  from  packaging,  inspect  for  damage,  confirm

quantities and sizes with packing list and organize parts in order of

installation. To verify installation hardware quantities, refer to Table

1. Installation hardware will typically be shipped in a separate box.

Notify your Pottorff representative immediately of any shortages or

shipping damage.

First, locate the Hat Channel Clips (A-3) and attach to the top and 

bottom of each louver section using #12 Hex-Head Screws (F-6).

Refer to Figure 1 for details and required locations.

Next,  attach  the  Mounting  Clips  (A-4)  to  the  Hat  Channel  Clips

using #12 Flat-Head screws (F-11) as illustrated in Figure 2. When

installed, each pair of Mounting Clips should sit side-by-side.

If  the  louver  includes  the  fully  sleeved  option,  attach  the  Sleeve

Side Plates to the sides of the louver section using #12 Hex-Head

Screws  (F-6)  running  through  the  existing  clearance  holes  in  the

pre-welded  sleeve  attachment  angle  into  the  back  of  the  louver

frame. Refer to Figure 5 and 6. The ends of the attachment angle

should be roughly flush with the top and bottom of the louver frame.

If no sleeve is required, omit steps 3-4 and proceed to step 5.  

Inspect openings  for damage,  repair  as needed  and remove any

obstructions or debris.

Prior to installation, verify that openings are square and plumb and

that the louvers will fit properly.

Louvers and Hardware:

1.

2.  

3.  

Openings:

1.

2.  

1.

2.  

3. 

Preparation

The  following  guidelines  provide  basic  assembly  and  installation

instructions  for  ECV-645-MD  extruded  aluminum  stationary  blade 

louvers  installing  via  the  “anchorless”  method.  The  ECV-645-MD  is

designed to withstand the severe weather effects typically associated

with hurricanes and is certified by Miami-Dade County for resistance

to impacts, cyclic fatigue and static pressures up to 150 psf.

General

POTTORFF

®

5101 Blue Mound Road, Fort Worth, Texas 76106

www.pottorff.com

1.

2.  

3. 

For  additional  details,  refer  to  product  NOA  submittal  drawings

posted  at  www.pottorff.com  as  well  as  any  job-specific  submittal

drawings when provided.

Carefully  lift  louver  sections  by  their  frames  using  multiple  lifting

points if necessary to avoid distortion, racking or damage. 

Do not

apply excessive force to a single point and NEVER LIFT UNITS

BY LOUVER BLADES.

Take  necessary  precautions  to  prevent

marring the louver finish.

Caulk and anchors to the building condition are by others. Per the

Florida Building Code, proper isolation (also by others) is required

between  aluminum  louver  components  and  steel  building  condi-

tions in order to prevent corrosion.

Table 1: Standard Installation Hardware, 
“Anchorless Method”

Part                Description   

A-3

A-4

A-5

F-2

F-4

F-5

F-6

F-11

Hat Channel

Clip

Formed

Mounting Clip,

Flanged

2'' x 2'' x 1/4'' x

12'' - Long

Retaining Angle

1/4'' I.D. x 5/8''

O.D. Flat

Washer

1/4-20 UNC

Hex Nut

1/4-20 UNC x

1'' Hex Bolt

#12-14 x 3/4''

Hex-Head Tek

Self-Drilling

Machine Screw

#12-14 x 3/4''

Flat-Head Tek

Self-Drilling

Machine Screw

Four (4) 

per section

Four (4) 

per section

Two (2)

per section

Twenty-four

(24) per

section

Twelve (12)

per section

Twelve (12)

per section

Sixteen (16) 

per section*

Sixteen (16)

per section

Eight (8) 

per section

Eight (8) 

per section

Four (4)

per section

Forty-eight

(48) per 

section

Twenty-four

(24) per 

section

Twenty-four

(24) per 

section

Thirty-two

(32) per 

section*

Thirty-two

(32) per 

section

Quantity Required

Louver           Louver

Sections         Sections

< 26'' wide      ≥ 26'' wide

Working from the rear (interior) side of the louver, slide the Sleeve

Top  and  Bottom  Plates  into  place.  The  Top  and  Bottom  Plates

should fit inside the formed flanges at the ends of the Side Plates,

and will rest just outside the Mounting Clips. Refer to Figure 5. If no

sleeve is required, omit steps 3-4 and proceed directly to step 5.

Lift the louver section up and place it into the opening as shown in

Figure 3.

As necessary, shim around the perimeter to level the louver and to

maintain an approximate 1/4'' clearance between the louver frame

and the edges of the opening (shims by others.)

4.

5.

6.

* Note: Additional #12 Hex-Head Screws will be shipped for louvers with an optional sleeve.

Reviews: