background image

 

 

45601A 

Printed in Canada 

14-02-2019 

OPTIONAL OIL UNIT INSTALLATION 

(PA03055 or PA03105) 

CADDY FURNACE 

 

 

WARNING: INSTALL THE NOZZLE, ADJUST THE ELECTRODES, 

ADJUST PRESSURE ACCORDING TO THE OIL UNIT 

MANUFACTURER’S RECOMMENDATIONS. 

NOTE: IF A PROBLEM RESULTS FROM IMPROPER INSTALLATION, 

NO PRODUCT WARRANTY WILL BE VALID. 

 

Verified and tested for 

Canada and the United 

States by an accredited 

laboratory. 

 

 

This manual is available for free download on the manufacturer’s 

web site. It is a copyrighted document. Resale is strictly prohibited. 

The manufacturer may update this manual from time to time and 

cannot be responsible for problems, injuries, or damages arising 

out of the use of information contained in any manual obtained 

from unauthorized sources.

 

 

Eco-energy at the hearth 

of your home 

PSG 

250, rue de Copenhague,

 

St-Augustin-de-Desmaures (Québec)

 

CANADA G3A 2H3

 

Summary of Contents for Caddy Series

Page 1: ...sted for Canada and the United States by an accredited laboratory This manual is available for free download on the manufacturer s web site It is a copyrighted document Resale is strictly prohibited T...

Page 2: ...oil unit on the left side but requires additional steps Please note that the installation on the furnace is carried out in an identical way for both Beckett and Riello units For electrical connections...

Page 3: ...ed on the furnace 18X if the blower box was already installed on the furnace Keep the screws Note The duct support assembly location may differ depending on the chosen configuration when installing th...

Page 4: ...the blower box user s manual kit Note To install the oil unit on the left side of the furnace replace Step 5 by the Section additional steps for left side installation Continue the installation from...

Page 5: ...5 Step 6 Remove the vision tube cap Step 7 Slide the oil unit R in the furnace Step 8 Use the bolts F on each side of the oil unit to have it leveled...

Page 6: ...6 Step 9 Cut and install the gasket T on the left panel S the right panel U and the air jacket panels V 2X of the furnace according to the following measurements...

Page 7: ...For a left side installation see Additional steps for left side installation for directions on which sides to install the air jacket panels Step 11 Install the left panel S on the furnace Secure it wi...

Page 8: ...8 Step 12 Install the gasket X on the oil unit combustion chamber cover Then install the right panel U with the screws C 11X removed from Step 1...

Page 9: ...9 Step 13 Install 4 screws W on the right side panel to plug the holes Step 14 Install the burner AA Secure it with washers Y 3X and nuts Z 3X Beckett unit...

Page 10: ...10 Install the burner BB Secure it with washers Y 3X and nuts Z 3X Riello unit Step 15 Install and secure the sealed vision cap CC with the set screw DD...

Page 11: ...11 Step 16 Install the certification label EE on the air jacket panel Step 17 In order to access the power board remove the filter support assembly FF held in place with screws GG 9X if necessary...

Page 12: ...Electrical connections section Step 19 Reinstall the filter support assembly FF on the blower box with screws GG 9X previously removed on Step 17 SECTION 2 ELECTRICAL CONNECTIONS BECKETT BURNER Step 1...

Page 13: ...rimary control and pass them through the middle grommet of the blower box and connect the wires of the oil unit on the OIL terminal on the power board Detail 4 To facilitate connections the use of a j...

Page 14: ...e the two blowers box knockout HH located on both sides of the blower box Detail 1 Install a grommet JJ or a connector not included Detail 2 Step 2 Remove the screw LL that holds the power board cover...

Page 15: ...facilitate connections the use of a junction box is recommended It can be installed on the back of the furnace Use the following diagram for reference Refer to the wiring diagram for complete connect...

Page 16: ...the support K with the existing screws L 2X located on the top of the combustion chamber Step 5 2 Unscrew the bolts M 12X washers N 12X and nuts O 12X located on the periphery of the combustion chamb...

Page 17: ...flector H on the oil unit with the screws provided with it I 4X Then fasten the bolts J 4X to the nuts located on the oil unit combustion chamber Step 5 4 Secure air jacket panels V 2X using screws W...

Page 18: ...UH CADDY RIELLO 40 F3 91 000 0 50 X 700W DELAVAN 0 60 GAL US H 2 27 L H 150 PSI 1035 kPa 1 3 1 2 5 87 BLOCKED VENT SWITCH A Blocked Vent Switch is mandatory for installation with an oil fired applian...

Page 19: ...19 WIRING DIAGRAM BECKETT BURNER...

Page 20: ...20 WIRING DIAGRAM RIELLO BURNER...

Reviews: