INSTALLATION AND
OPERATION MANUAL
Q.PEAK DUO-G10.X solar module series
Valid for Africa, Europe, LatinAmerica, South America
Page 1: ...INSTALLATION AND OPERATION MANUAL Q PEAK DUO G10 X solar module series Valid for Africa Europe LatinAmerica South America...
Page 2: ...y hazardous goods and environmental protection Regulations and requirements specific to the system Any applicable laws and requirements in particular inter national country specific regional laws and...
Page 3: ...are relevant DOCUMENT TYPE Product data sheet Packaging and transport information External dimensions and components for Q PEAK DUO G10 Q PEAK DUO G10 Q PEAK DUO G10 a Q PEAK DUO G10 a Q PEAK DUO G10...
Page 4: ...orces acting on the module are relayed to the mounting substructure Ensures sufficient rear ventilation of the module Avoid the usage of different metals to prevent contact corrosion Allows for stress...
Page 5: ...qui rements Ensure that the connection cables of the junction box do not run between laminate and mounting rails Modules bend under load Therefore sharp objects e g screws ballast stones rail ends rai...
Page 6: ...nce of reverse currents caused by module defects ground leaks or defective insulation Ensure that the maximum reverse current load capacity indicated in the data sheet is met In order to limit reverse...
Page 7: ...te Module damage may occur Never step on modules Do not subject modules to any mechanical stress Do not allow any objects to fall onto modules 3 INSTALLATION 3 1 SAFETY AND TRANSPORT Danger Risk of fa...
Page 8: ...fe threatening injuries The danger increases when several modules are connected in series Please be aware of that the entire open circuit voltage is active even at low levels of solar irradiation Plea...
Page 9: ...personnel see page 3 Ensure correct polarity Use solar cables for the connection at the junction box outlet Only interconnect connectors of the same type and manufacturer Use minimum 4mm2 copper wire...
Page 10: ...ht concentrators e g mirrors or lenses Ensure that the cabling is not exposed and or hanging and is protected from dirt moisture and mechanical friction 4 ELECTRICAL CONNECTION 4 4 AFTER INSTALLATION...
Page 11: ...age may occur Remove snow and ice carefully without force e g with a very soft broom Do not scratch off dirt Module cleaning has to be done by qualified personnel according to the state of the art and...
Page 12: ...ee 17 21 06766 Bitterfeld Wolfen Germany TEL 49 0 34946699 23222 FAX 49 0 34946699 23000 EMAIL sales q cells com WEB www q cells com Subject to change without notice Q CELLS Installation manual solar...