872
872
CAUTION
Energy Meter Wiring & Setting (EM24 RS485 Type)
RS485-A
RS485-B
CGND
CGND
OUT Connector Board
[ EM 24 Meter Setting ]
1) Application : F
2) SYS : 3P.n
3) P int.ti : 1
4) ModBus Address : 1 ( default value )
5) Baudrate : 9600 ( default value )
INVERTER
RS485-A
Energy Meter
42
41
GRID (Mains)
MAIN LOAD
N
L1
L2
L3
L1 L2 L3
N
CAUTION
IP65
This warranty does not apply to the batteries that
• are not operated in accordance with the operating manuals for their intended purposes.
• have been incorrectly installed or commissioned.
• have been modified, altered or operated with other components not approved by Q CELLS.
• have been physically damaged (e.g. damage from falls or transportation).
• have been damaged by force majeure (e.g. flash of lightning, overvoltage, storm, fire).
• have been treated improperly or negligently in an inappropriate way (including the use in non-recommended ambient conditions).
(Eng) 05/19
Hybrid PCS Installation Quick Guide
Q.HOME+ ESS HYB G2
Q.HOME+ ESS HYB G2 is a hybrid PCS based on the INVERTER and Battery. The weight of the PCS is about 35kg, and the Battery
is about 55kg. Therefore, special care is required when handling. At least two people have to deliver and take it out.
• Do not operate with other components not approved by Q.HOME+ ESS HYB G2.
(Connecting other products in parallel to Q CELLS's products may result in abnormal operation.)
• The internet connection is required to use all functions of Q.HOME+ ESS HYB G2.
• If you have a problem, please contact the installer.
• The Specifications of the product may be modified without prior notice to improve product quality.
• https://www.q-cells.de/service-support/downloadbereich.html
• https://www.q-cells.com/au/main/customer_support/download/brochure.html
Manual Download (Refer to Installation Manual)
Wiring Schematic of Single-Phase System
TN-S Network System (Single-Phase)
▶
CN906
CN2
CN1
CN3
CN4
CN5
CN905
CN901
CN902
CN904
CN906
CN2
CN1
CN3
CN4
CN5
CN905
CN901
CN902
CN904
41
42
43
1
31
32
33 3
6
9
7
11
1
4
SUB LOAD
L1
N
RS485-B
(A) Screw
(A)
(A)
(B)
(B)
(B) Screw
L 35mm
L 75mm
PUSH!
2. Connect PV, AC Grid, and Energy meter (See Chapter 5)
CAUTION
1. Open the bottom cover of INVERTER and Battery case.
2. Check inner circuit breaker and terminal in Battery case.
• Make sure the AC circuit breaker, PV switch and DC circuit breaker of the Battery are disconnected before starting electrical cable
connections.
• Battery replacement can only be carried out by qualified personnel. If the Battery needs to be changed, it should be placed with
a product which meets the manufacturer’s specifications.
• Do not mismatch the connection of the electric poles (+) to (-) and (-) to (+) when installing. It may cause electric shock or the product
may permanently be damaged.
• Incorrect Battery polarity connection will damage the product seriously. This damage is not covered by the warranty.
• All other connections should be done before Battery assembly and the Battery interrupter must be off.
1. Battery Connections
The order for assembling the INVERTER and Battery. Please follow the following steps.
3. Connect the (+) and (-) wire (PCS) to the marked teminal (Battery).
And then connect the ground terminal. (See Chapter 5.8.4)
4. Turn the cable gland clockwise to check the tightness.
5. Connect Battery communication cable. If you use more than one
Battery (8kwh or more), use the adaptor (Amphenol) for Battery
communication. (EX. If you use 3 Battery, you need 2 adaptor for
BMS communication.)
When using the adaptor, hold the communication cable and fasten
the silver color of the adaptor to anticlockwise.
7. Close the bottom cover of INVERTER and Battery case.
6. Change the switch on.
Switch
Switch
Move the switch
◀
TT Network System (Single-Phase)
872
872