Canopy Set Up Instructions
Canopy Parts List
1
. 12x12 Instant Up Canopy Top (1)
2
. 12x12 Instant Up Canopy Frame (1)
3
. 12x12 Instant Up Carry Bag (1)
4
. Canopy Stakes (4)
Q100 12x12 Instant Up Canopy
Instruction Manual
1. Remove all parts from the canopy bag.
2. Place the canopy frame in the upright
standing position. Open the frame
partially using the legs.
3. Open the canopy frame using the sides
of the canopy as indicated. The canopy
locations are marked “Open Here”.
5. Secure the canopy top to the canopy
frame on all four corners using the hook
and loop strips.
1.
2.
3.
4.
5.
6.
6. Open the canopy frame until all four
corners lock into place. You should hear a
click when the canopy frame has opened
and the corner has locked.
7. Turn all four sides down to cover the
side of the frame. On the inside of the
canopy, secure all four sides and ceiling
to the canopy frame using the inside
hook and loop strips.
7.
8.
8. Extend all four legs to the desired
preset height. This should be completed
by extending two legs on the same side at
the same time. Once extended to the
appropriate height, the canopy legs will
lock into place.
9. To secure the canopy to the ground, place
one canopy stake in each of the four
pre-drilled holes at the base of the canopy.
The short side of the stake should be touching
the ground. Set up for your Quest 10x10
Instant Up Canopy is now complete.
4. Place the canopy top on the opened
frame.
9.