background image

RAM AIR GEAR DRYERS

ASSEMBLY INSTRUCTIONS

TG-4, TG-6, TG-8

TOOLS NEEDED FOR 

ASSEMBLY:

5” BOLT

STEP ONE

Remove all bolts from deck leaving 

rubber gasket in place.

STEP TWO

Install left vertical air chamber with  

opening for the power pack facing 

away from center. Tighten bolts.

STEP THREE

Install right vertical air chamber, 

aligning straight edge with edge  

of base. Tighten bolts.

9/16” WRENCH 

(not included)

3” BOLT

3/8” BOLT

1/4” BOLT

7/16” WRENCH 

(not included)

1/2” WRENCH 

(not included)

Reviews: