RAM AIR GEAR DRYERS
ASSEMBLY INSTRUCTIONS
TG-4H, TG-6H, TG-8H
TOOLS NEEDED FOR
ASSEMBLY:
5” BOLT
STEP ONE
Remove all bolts from deck leaving
rubber gasket in place.
STEP TWO
Install left vertical air chamber with
opening for the power pack facing
away from center. Tighten bolts.
STEP THREE
Install right vertical air chamber,
aligning straight edge with edge
of base. Tighten bolts.
9/16” WRENCH
(not included)
3” BOLT
3/8” BOLT
1/4” BOLT
7/16” WRENCH
(not included)
1/2” WRENCH
(not included)