background image

1-877-789-3245  |  info@reliance-foundry.com  |  www.reliance-foundry.com

Martello Bollard Installation

Embedded Mounting

Parts List 

Installation Equipment

#

PART

QTY

1

Bollard Body

1

2

Bollard Cover with Reflective Strip

1

3

Concrete Anchor

2

Measuring Tape

Chalk/Marker

Auger

Level

Dirt Tamper

Shovel

To protect the finish, keep bollards in original 

packaging until exact moment of installation.

Handle with care to avoid scratching or 

damaging bollard surfaces. 

Once scratched, bollards cannot be repaired 

to original form without re-finishing the entire 

surface.

Consider local soil conditions before proceeding 

with bollard installation.

Before Installation

STEP 1: 

Always check for hazards such as water pipes, 

gas lines, and underground wiring before digging. 

STEP 2: 

Study the site plans and mark the precise center 

point of each bollard.

STEP 3: 

 Please consult your local Building Code 

Department to determine the recommended depth 

below the frost line for digging in your area. Choose a 

minimum of this or 18", whichever is greater. This is the 

total depth for digging. The diameter of the hole should 

extend to a minimum of 42". 

Note: If you have specific 

impact requirements, please consult your local civil 

engineer.

STEP 4: 

Center the auger on the installation mark and 

bore a hole to the required depth and diameter. 

R-7651-EM

SECTION W-W

SCALE 0.38 : 1

W

W

1

2

3

1

2

3

42"

FROST LINE

18"

Reviews: