background image

!"#$%&'()'*%#$%+,-./#0"1234%5(32/%1"2%+,-./#0"1%*'6$7%1"#$%&'()'*
&'.%(,1%82%+,-#237%#(%6",*2%,/%#(%-'/17%6#1",)1%+,($2(1%9/,&%:2.(,*3$

;)#*3#(0%<.$12&$7%=(+4

>%%?,-./#0"1%@A@A

Assembly Book

Manufactured by Reynolds Building Systems, Inc.

                     205 Arlington Drive            Greenville, PA   16125

Sentry Buildings

BCDE@FD%;)#*3#(0

the Jefferson

:2G#$23%H)(2%@B7%@A@B

Summary of Contents for Sentry Buildings the Jefferson

Page 1: ... 1 6 7 1 1 82 237 6 2 17 6 1 1 2 1 9 2 3 3 0 12 7 4 0 1 A A Assembly Book Manufactured by Reynolds Building Systems Inc 205 Arlington Drive Greenville PA 16125 Sentry Buildings BCDE FD 3 0 the Jefferson 2G 23 H 2 B7 A B ...

Page 2: ...YD 214 2 1 2 12 1 2 21 6 1 82 23 1 1 2 9 1 9 6 3 91 9 2 21234 T 0 82 9 1 2 9 1 9 6 3 91 9 7 2E12 3 07 91 9 0 3 9 2 1 0 6 82 32 G2 23 8 2 4 6 82 2 12 32 G2 3 6 82 1 9 23 829 2 1 1 32 G2 1 L2 24 S 12 123 1 2 8 L 02 4 2 2 6 223 1 0 9 8 1 32 G2 2 4 Owner Supplied 9 0 2 7 21 9 23027 92 1 3 G2 1 1 2 2 4 22 Step 30 9 M 1 1 223234 Q 1 9 3 0 3 1 4 G2 2 3 VD E C_C 0 02 3 6 1 6 2 3 36 27 82 1 9 2 0 2 0 9 6 3...

Page 3: ...2 12 3 G2 23 6 1 c_Ff 1 0 2 3 0 G2 6 3 9 04 Foundation TypesX b 1 9 3 1 82 1 32 2 3 6 1 1 2 9 12 6 82 1 234 2 8 3 0 32 2 6 3212 2 6 1 1 2 9 9 3 1 82 234 Y 926 3 992 2 1 1 2 9 9 3 1 2 6 82 64 2 L 1 2 0 3 8 3 0 32 2M 2 2 1 2 4 LP siding A 2 6 1 3 2 3 234 Y 16 1 9 12E 1 9 1 2 9 14 Q 1 1 2 8 11 2302 9 1 2 3 07 this is important4 S 1 Cf 1 Vf 9 2 2 9 1 2 8 11 2302 9 1 2 3 0 3 1 2 0 34 R D1 6 0 32 1 8 3 ...

Page 4: ...turer s instructions for the rough opening size B4 2 2 1 6 1 3 6 2 2 6 1 1 1 1 1 0 1 2 6 3 6 2 04 1 1 2 6 1 3 23 cBf 6 4 4 P 12 JFK 9 cVf 0 EF 9 L 14 1 2 1 2 01 9 cBf4 c4 1 1 2 2 EF 6 0 14 F4 1 J K cVf 0 2 32 1 1 3 3 2 8 1 2 32 4 4 1 1 2 cVf 0 EF 8 L 3 1 1 2 8 L 8 G2 1 2 2 32 4 S 1 BCf 1 3 0 1 2 3 0 6 221 1 2 1 34 Pre cut Wall Stud 80 1 2 Header Supports Pre built 37 1 2 Door Header B4 2 2 1 6 1 3...

Page 5: ... 324 Treated Bottom Plate B4 1 J K 16 EF VD J 2 6 82 1 2 123K 1 2 01 9 g B_ f4 Q 1 1 2 8 3 1 021 2 3 3 12 6 1 DhD L 6 2 2 1 2 6 1 3 6 82 1234 4 S L D D 6 2 2 821622 9 1 16 1 3 L 4 292 2 23 12 12 4 Note When building the lower walls use treated 2x4s for the bottom wall plates 4 1 J K 2G2 2 1 6 1 3 821622 1 2 1 3 8 11 12 4 e 1 2 1 2 123 8 11 12 1 2 6 1 3 6 1 J K 16 BC3 0 G 23 32 L 4 5 2 J K 16 BA3 1...

Page 6: ... J K 16 BC3 0 G 23 32 L 4 5 2 J K 16 BA3 123 L2 2 1 3 1 2 2 1 2 1 124 c4 2 2 1 1 8 3 J K 9 G2 2 gCf 0 6 9 2 4 F4 S L 9 2 DSide Wall Frames 3 21 9 2 324 Step 2B Assemble 6 Six 8 Side Wall Frames continued Treated Bottom Plate Step 3 Assemble Door Header 4 P 12 Ff E FVf J 2 123 1 3 8 3K 2 L23 L 14 1 J K 16 B_ f E FVf 9 2 1 9 1 821622 1 2 EV 8 3 c4 Y 6 3 0 2 1 8 1 32 9 2 9 2 6 1 8 3 1 1 2 2 12 9 1 2 ...

Page 7: ...12 3 BA3 123 L2 9 1 2 1 124 c4 292 1 1 2 0 02 3 2 9 1 1 3212 2 1 2 2 0 1 9 1 2 0 2 04 1 J K 16 2 1 1 3 1 1 2 0 1 2 B B_ f 3 1 1 2 2 32 1 0 JBAK 12 BA3 L2 4 1 1 2 EV 2 32 8 1 2 0 1 2 2 3 1 1 2 3N 2 1 1 3 6 1 BA3 L2 4 F4 1 J K 9 G2 2 2 9 2 1 1 3 1 9 1 821622 2 32 3 1 EF 124 1 6 1 BA3 L2 1 0 1 12 3 1 2 1 2 32 4 B4 1 J K 16 EF BCD J 2 6 82 1 2 123K 1 2 01 9 B D f4 Q 1 1 2 8 3 1 021 2 3 3 12 6 1 DhD L ...

Page 8: ... Header Blocking 2x8 Door Header Pre cut 2x4 Studs 2x4 15 5 Treated Bottom Plate 108 Door Opening Width X X X X X X X X S S 111 Door Header 2x4 Header Support Studs 4 Y 2 8 2 1 2 9 1 6 9 2 0 1 2 6 12 1 8 G2 3 JVK 2 0 1 2 1 6 1 3 4 5 2 BC3 0 G 23 32 L 9 1 2 8 11 12 3 BA3 123 L2 9 1 2 1 124 c4 292 1 1 2 0 02 3 2 9 1 1 3212 2 1 2 2 0 1 9 1 2 0 2 04 1 J K 16 2 1 1 3 1 1 2 0 1 2 B B_ f 3 1 1 2 2 32 1 0...

Page 9: ...24 2 6 6 1 2 1 1 3 4 IMPORTANT 2 1 2 3 L23 6 1 D D 1 2 4 2 2 9 2 1 021 2 1 1 2 2 0 JFK 9 BA3 L2 4 1 1 2 1 2 g B_ f 2 6 9 2 1 1 2 2 6 9 24 e 1 2 2 6 9 2 1 021 2 6 2 2 1 2 8 11 6 1 JVK 2 0 1 BA3 L2 J 1 002 2 32 9 1 2 1 3 K4 c4 1 1 2 VD 9 27 2E1 1 1 2 9 1 VD 32 6 9 24 e 9 2 1 021 2 6 2 2 1 2 8 11 6 1 JVK 2 0 1 BA3 L2 J 1 002 2 32 9 1 2 1 3 K4 92 1 2 End Wall Frames 8 Side Wall Frame Brace wall frames...

Page 10: ...nued B4 1 VD 32 6 9 2 1 1 2 9 1 2 4 15 5 Front Wall Frame 8 Side Wall Frame c4 e 9 2 1 1 2 9 0 BC3 0 G4 Ff 2 12 4 212 8 1 4 R 1 1 2 EF 12 1 2 3 2 04 4 1 1 2 9 1 6 9 2 821622 1 2 32 6 9 2 4 2 2 9 2 1 021 2 1 1 2 2 0 JFK 9 BA3 L2 4 ...

Page 11: ... L 6 4 5 2 BA3 L2 4 F4 1 1 9 1 3 1 EF B D 8 3 1 2 2 32 6 9 24 4 2 2 1 1 1 EF 1 2 12 1 2 12 32 6 9 2 4 Back Wall Frames B4 1 BCD 0 EF 1 2 8 L 6 4 5 2 BA3 L2 2 BCf 1 1 2 2 1 2 12 4 4 2 2 1 1 1 BCD 0 EF 1 2 12 1 2 12 9 1 6 4 Step 8A Install Siding on Wall Frames 12 Long 2x4 Tie Plate LP siding A 2 6 1 3 2 3 234 Y 16 1 9 12E 1 9 1 2 9 14 Q 1 1 2 8 11 2302 9 1 2 3 07 this is important4 S 1 Cf 1 Vf 9 2 ...

Page 12: ...rst Step 8B Install Siding on Wall Frames continued c4 1 3 0 12 32 6 4 F4 1 9 6 31 3 0 2 1 2 9 1 6 6 1 1 2 DPYQD 2302 9 6 1 1 2 3 0 1 2 32 6 4 1 3 2 G2 3 0 1 1 2E12 3 1 1 2 3 2 04 4 P 12 J K 16 BF B_ f E FVf 3 0 2 4 1 1 2 2 1 9 1 8 G2 3 2 04 S L2 2 1 2 2 2 9 6 1 8 11 9 3 2 32 4 Cut to Fit C4 1 1 2 9 6 31 3 0 1 2 0 1 32 9 1 2 3 2 04 4 1 3 2 G2 EF 12 1 1 2E12 3 1 2 3 2 04 G2 1 2 EF7 1 6 82 23 12 12 ...

Page 13: ...ke it easier to stand the gable upright over the lower wall 2x4 Block 2x4 Block 71 3 8 Long Truss Leg 2x4 On Edge 97 1 2 Long 2x4 On edge 188 1 2 71 3 8 Long Truss Leg 81 3 4 Long Truss Top Truss Knee c4 2 2 1 2 1 20 1 1 2 EF 12 6 1 J K 16 B_ f 0 32 L 26 4 F4 1 B_ f E B f 9 2 1 2 EC 1 20 2 EF 6 1 C3 4 aE 1 0 D1 1 14 4 M 2 1 4 S2 2 3 0 9 1 2 L 22 9 1 2 EC 1 1 1 2 8 11 2 9 1 2 EF 124 2 2 2 2 1 6 82 ...

Page 14: ...2 1 EF 12 0 B_ f 26 4 2 2 1 2 VA B_ f 1 3 1 1 2 2 8 1 9 2 0 B_ f 26 4 Step 13B Assemble Rear Gable continued C4 1 _Vf 3 CF B_ f 6 1 3 1 2 291 32 9 1 2 0 8 2 9 24 5 2 M 2 1 2 2 1 2 1 3 2 84 e 1 EF 8 11 12 6 1 BA3 L2 3 26 1 EC 6 1 B_ f 26 4 2 2 1 1 1 1 3 0 1 32 9 0 8 2 9 24 1 2 Gusset at Ridge 1 2 Gusset at Knee 4 P 12 JcK 1 22 F c_Ff 0 EF 3 1 1 9 1 3 1 821622 9 2 4 cut to fit Studs Framing Square F...

Page 15: ... 6 1 1 2 3 0 1 2 32 6 4 5 2 V3 0 G4 23 B f 14 1x4 Trim c4 1 J K 16 gCf 0 BEF 6 12 2 1 8 3 821622 2 8 3 4 3 82 9 6 1 1 2 91 9 4 1 3 8 3 1 9 14 F4 2 2 1 1 1 1 1 1 2 9 1 6 2 4 Siding Filler F4 1 VA B_ f 0 3 0 2 4 1 1 2 3 0 1 1 2E12 3 82 3 1 2 0 8 2 9 24 B4 1 3 1 2 0 8 2 9 2 3 32 1 1 1 2 2 9 1 2 8 3 04 Q 1 1 2 9 2 6 1 1 2 8 11 1 6 3 1 2 2 6 1 82 2 2 123 912 1 2 3 0 234 1 2 1 3 0 2 6 1 1 2 D 1 2302D 9 ...

Page 16: ...8 E 4 Siding Extends Over Trim Paint edge Step 16 Install Rear Roof Gable 4 a 2 1 1 2 0 8 2 8 L 6 4 2 1 3 2 2 0 8 2 3 0 2E12 3 G2 1 8 L 6 4 2 12 0 8 2 6 1 8 11 EF 2E12 3 0 B B_ f 1 62 6 EF 8 1 32 4 e 1 9 0 BA3 L2 4 c4 2 G2 1 2 6 8 2 9 12 6 3 2 1 2 1 8 2 1 2 0 8 2 1 1 2 91 9 4 Brace Gable with Pre cut Studs B4 1 J K 16 EF B D 8 3 1 2 8 L 6 1 2G2 1 1 2 0 8 2 9 9 0 99 3 0 0 8 2 1 1 4 1 J K 16 2 EF B ...

Page 17: ...0 EF 4 1 JBK 2 1 cCf4 Q 1 1 2 2 8 3 6 82 64 S2 2 3 1 2 1 8 11 0 8 2 9 2 3 1 JcK 1 22 EF 1 1 2 01 3 1 32 cCf 8 34 1 EF 6 1 BA3 L2 4 36 Step 17 Assemble Install Front Gable B4 1 JcK 1 22 EC D 3 JBK 2 EC VD 1 12 821622 1 2 9 1 3 2 0 8 2 6 2 2 32 6 4 1 1 2 1 EC 1 9 14 2 EC 12 3 N2 1 B B_ f 1 1 2 EF 1 2 12 J 22 R21 DYDK4 e EC 1 1 2 9 6 1 BA3 123 L2 3 8 2 6 23 Ff 14 2 2 1 12 32 6 0 1 99 EC 1 9 4 4 1 1 0...

Page 18: ...8 2 1 4 5 2 3 L2 0 6 2 2 1 3 2 1234 c4 1 3 8 2 EC 99 1 8 L 32 1 2 0 8 2 2 1 2 2 4 1 1 2 2 8 L 9 6 1 1 2 9 2 9 1 2 0 8 2 3 04 1x3 Stripping 2x6 Soffit Block 2x6 Truss Plate 4 1 99 1 8 L 32 2 DhD 1 2 1 124 2 2 1 2 1 9 1 2 99 1 8 L 2 8 26 0 1 0 1 2 EC 1 1 2 99 1 8 L 6 1 B_ f 32 L 26 4 R B_Vf 3 212 2 1 2G2 1 1 2 6 3 9 11 04 F4 2 2 1 2 99 1 8 L 2 6 1 B_ f 32 L 26 4 R 2 1 2G2 1 1 2 6 3 9 11 04 2 8 11 9 ...

Page 19: ...1 2 Ff 6 324 302 0 21 cB c_Ff 6 324 Y 6 3 0 2 6 1 8 821622 1 2 0 21 3 1 2 EC 8 3 4 2 2 0 21 6 1 JcK 1 22 6 9 C3 23 Cf 14 Importantj 6 2 1 0 1 2 0 21 1 1 2 L 227 1 0 21 6 1 1 2 12 1 0 23 32 1 6 3 1 2 3024 See detail at bottom of page4 c4 1 G2 3 0 21 1 1 2 1 2 324 21 1 324 F4 Y 2 8 2 JBAK 12 2 1 2 4 2 G2 EF 8 L 9 9 4 71 3 8 Truss Member Add 2x4 Block GLUE Short Side of Gusset Towards Ridge 81 3 4 Tr...

Page 20: ...4 1 1 2 1 99 1 2 9 6 1 1 2 2 3 9 1 2 3 8 2 99 1 8 L4 c4 1 99 1 2 1 2 12 6 4 B4 1 EC 02 G2 1 2 DhD L 1 2 1 12 3 9 6 1 1 32 2302 9 EC4 5 2 B B_ f N 1 02 4 21 1 20 1 02 4 5 2 BA3 123 L2 1 2 2 1 2 1 1 1 2 21 02 J 2 02 2 2 21 1 0 32 1 2 1 1 2 2 1 0 2K4 4 2 G2 1 2 EF B D 8 3 23 1 8 2 1 2 9 1 0 8 24 Y 0 2 211 0 1 2 1 L 1 2 2 8 3 1 L22 1 2 84 R D1 2 G2 1 2 EF 1 1 2 9 2 1 0 234 Cut Edge F4 1 BEF 2 1 32 99 ...

Page 21: ...1 2 1 9 1 82 1622 1 2 1 99 1 2 3 1 2 2 L4 4 1 99 1 2 1 9 1 9 6 1 1 2 8 11 EF4 8 Soffit Panels 8 Soffit Panel c4 1 J K 16 Vf 6 32 E FV c_Ff 99 1 2 32 1 2 EF 6 1 23 32 3 6 3 1 2 DPYQD 2302 1 021 2 1 1 2 L 22 9 1 2 0 8 24 5 2 B B_Ff 1 2 1 26 23 B f 14 302 k2 1 LAP Edges 0 2 Y 2 B4 292 1 2E1 02 9 1 2 2 1 9 1 2 _BCf 2 1 04 S L2 2 1 1 2 1 2 3 1 2 0 8 2 2 84 1 821622 2 1 1 2 1 6 9 2 1 04 9 2 1 0 302 G2 1...

Page 22: ...d in Pallets 4 1 J K 16 FVfEgCf 221 9 1 L2 JFK 9 FVfEFVf 221 4 2 1 2 1 cCfEFVf4 c4 1 1 0 1 0 8 2 L 22 1 9 2 1 0 1 1 2 9 1 9 1 2 8 3 07 refer to the sheathing layout below4 5 0 1 0 1 2302 1 1 2 9 1 221 8 6 1 1 2 99 1 2 4 2 9 2 1 0 3 221 1 2 12 9 1 2 1 2 4 F4 1 9 6 1 8 L 0 8 2 3 04 4 1 FVf 6 32 221 1 cCf 3 1 8 11 6 2 14 C4 1 FVf 6 32 221 1 9 1 1 64 7 1 Bf 62 1 6 9 G2 1 04 1 JBK 2 821622 2 1 9 1 64 4...

Page 23: ...9 2 1 0 1 2 2 0 8 24 5 2 B B_Ff 1 26 1 2 2 1 2 99 1 2 1 1 2 EF 4 5 2 3 L2 1 2 2 1 2 9 2 1 0 1 1 2 EF 4 4 2 1 3 2 2 V _Vf 0 EF 821622 1 2 99 1 2 3 1 2 9 2 1 0 1 2 32 9 1 2 0 8 24 2x4x81 3 4 2x4x82 5 8 2x4x81 3 4 2x4x82 5 8 c4 1 c B_ f E Vf 1 8 3 1 1 2 8 11 9 1 2 EF 0 B B_Ff 1 26 4 ...

Page 24: ...1 1 2 32 9 1 2 0 8 27 9 6 1 1 2 9 2 1 04 Blue Ends Together Step 25B Install Front Gable Trim continued 82 1 4 long 1x6 Trim 82 1 4 long 1x6 Trim Step 26 Install 1x6 Door Jamb B4 1 BAD 0 BEC 8 3 1 2 01 3 1 32 1 2 3 2 32 7 9 6 1 1 2 3 04 5 2 V3 0 G4 4 4 1 3 1 BEC E VD 8 3 1 2 32 9 1 2 3 2 04 C4 2 2 G2 0 1 2 8 L 0 8 24 Y 1 3 2 1 1 1 2 3 0 9 6 1 1 9 9 2 1 04 ...

Page 25: ... 1 EF 2 32 3 1 2 1 9 3 2 04 2 2 1 1 3 6 1 BA3 L2 4 1x6 Door Jamb 2x4 Cut to Fit 1x6 Door Jamb Step 28 Install 2x4s Around Door Jamb 4 1 BEF BAD 1 8 3 3 1 1 2 3 2 07 2 12 23 1 2 1 9 1 2 32 3 1 4 1x4 Door Trim VIEW FROM INSIDE B4 1 1 2 01 3 1 BEF VD 1 8 3 1 2 32 9 1 2 3 2 07 9 6 1 1 2 BEC N 8 4 5 2 V3 0 G4 4 2x4 Cut to Fit ...

Page 26: ... 1 2 6 3 6 2 0 926 4 Note the front flange projects past the window frame creating a slot for the trim4 5 2 6 1 9 1 2 3 1 2 1 82 2 123 1 2 14 e 23 1 1 0 2 6 L 62 4 c4 2 1 BEc 1 8 3 0 2 32 9 1 2 6 3 67 9 6 1 1 2 1 9 24 2 BEc 32 1 6 2E12 3 82 6 1 2 6 3 6 1 2 2 G2 1 2 8 11 1 4 2 1 1 6 2 1 1 2 32 1 4 292 1 1 2 1 82 6 9 1 2 1 6 31 3 2 01 1 82 234 F4 2 2 1 2 1 8 3 0 JCK E 1 2 1 26 4 4 1 1 1 2 1 4 Y L 0 ...

Page 27: ...erial Shipped by Local Supplier gA EF Q 2 1 b 1 3 BA EF VD b Q 12 J1 2 123K B EF BCD b 12 J1 2 123K V EF VD T 0 P 82 F EF BAD T 0 P 82 V EF B D T 0 P 82 c EF BCD T 0 P 82 BA BEF VD b4Q4 3 BEF BAD b4Q4 3 BEC VD b4Q4 R H 8 B BEC BAD b4Q4 R H 8 V BEc VD b4Q4 1 0 3 EV BAD R O2 32 c EBA VD T H 1 W O2 32 EBA B D T H 1 W O2 32 Bc EBA BCD T H 1 B FEV c_Ff WU P 91 T 0 FEV c_Vf PQ Q 23 3 0 BC FEV _BCf 2 1 0...

Page 28: ...c_Ff B 0 2 O 0 b 3 6 cCf E cCf B 0 2 O 0 b 3 6 Vf E cVf F 23 Q 2 112 B f E Fcf B 1 0 1 302 F i 22 B_ f U 8 2 T 2 H2992 BCD b 32 E FD 3 0 i 1 Q L 0 P 1 Qty Material Shipped on B Pallet C 3 EC E VB c_Ff F U 8 2 G2 0 EF E VB c_Ff c U 8 2 b 1 3 EF E CF B_ f F U 8 2 BEC E VFf F U 8 2 BEC E V B_Ff F PQ 3 0 Q 2 VA B_ f E FV c_Ff PQ 3 0 Q 2 BF B_ f E FV c_Ff BF PQ Q 23 99 1 Q 2 B_Ff E FV c_Ff V PQ Q 23 99...

Reviews: