background image

 

 

 

         NEED

INSTALL

ATION

        HELP?

                       C

all

1-800-45-B

ASCO (452-2726) 

   Monda

y - Frida

y

8:00 A.M.

 - 4:30 P

.M.

      Easter

n Time

QCI0150 REV. 0

Page 1 of 14

Certified 06/04/10

 

INSTALLATION 

INSTRUCTIONS

 

935 RODA

 

FRAMELESS DOOR

ROLAIRE

Summary of Contents for ROLAIRE

Page 1: ...NEED INSTALLATION HELP Call 1 800 45 BASCO 452 2726 Monday Friday 8 00 A M 4 30 P M Eastern Time QCI0150 REV 0 Page 1 of 14 Certified 06 04 10 INSTALLATION INSTRUCTIONS 935 RODA FRAMELESS DOOR ROLAIRE...

Page 2: ...RACKET 2 8 SC4640 CLAMP WITH ANTI JUMPER 1 9 SC4800 01 ROLLER ASSEMBLY WITH STOPPER PIN 1 10 SC4800 02 ROLLER ASSEMBLY 1 11 SC4610 GUIDE 1 12 SC4710 BOTTOM CATCH 1 13 SC4910 or SC4950 18 PULL KNOB or...

Page 3: ...QCI0150 REV 0 Page 3 of 14 Certified 06 04 10 9 10 1 7 6 20 11 2 18 12 4 5 16 13 3 14 15 14 15 8 6...

Page 4: ...ully break the glazed surface to prevent skidding when drilling Installation Notes To install your Basco Shower Enclosure you will need the following Pencil Low Tack Masking Tape Tape Measure 4 ft 6 f...

Page 5: ...the threshold QCI0150 REV 0 Page 5 of 14 Certified 06 04 10 2 IMPORTANT Keep both holes in line to ensure the header mounts level 3 16 Unit Height 1 2 Use a level to check the threshold for out of lev...

Page 6: ...and secure it with 8 x 1 1 2 truss head screws 18 Next drill three 3 16 diameter holes in the center of U channel 2 centerline groove provided for convenience two holes approximately 2 1 2 from each e...

Page 7: ...e wall centerline marked in step one With a pencil carefully mark each hole position on the wall centerline Drill a 3 16 diameter hole approximately 1 deep directly on the wall centerline at the marke...

Page 8: ...n tighten the 4 set screws on each Wall Mount Header Bracket Note The set screws closest to the wall must be tightened first Disassemble two Wall Mount Header Brackets 7 by loosening the set screws Ne...

Page 9: ...ate side Use different sizes of setting blocks to make exposed edges of the glass level and plumb Exposed edges MUST be level and plumb before moving to next step Different sizes setting blocks may be...

Page 10: ...small amount of silicone into each drilled hole and insert a wall plug into each hole Then carefully cut heads off of the wall plugs with a razor blade so there is nothing raised above the surface of...

Page 11: ...YL WALL SIDE DOOR PANEL DOOR PANEL 15 Carefully hang the Door Panel with Rollers 9 10 on the Header 1 Make sure the Door Panel is lined up inside the Guide 11 Then if necessary adjust the Door Panel s...

Page 12: ...Vinyl Seal to size equal to the Door Panel height minus 1 2 Place the Vinyl Seal onto the wall side of the door panel with vinyl lip facing inside the shower 2 For the Bumpers Place one bumper to the...

Page 13: ...oor Panel 1 4 approx Location of the Bottom Catch when the Door Panel completely closed GUIDE SPRING DRIP VINYL DOOR PANEL STATIONARY PANEL Place 18 Pull Knob 13 or Back to Back Knob 13 on the Door Pa...

Page 14: ...rs On the interior face of the Side Panel place a strip of low tack tape on the glass about 1 8 to 3 16 away from edge of the u channel both vertically and horizontally Run a small bead of silicone al...

Reviews: