background image

                Roverpet

    20 Kiji Dava Circle   Prescott, Arizona  86301    

800-658-5925

    

rover@roverpet.com

 

 

Page 1 of 3 

 

Roverpet #44PR 

– 4’ x 4’ Puppy Rail Assembly Instructions 

 

Inventory List for The Roverpet #44PR Puppy Rail System:

 

 

(2)

 

#PR48LB

 

48” Long Support Bar 

 

 

(2) #48CB

 

48” Long Crossbar and  

(4)

 

2”, 3”, 4”, 5”, 6” or 8” high legs (depending on style of Roverpet Puppy Rail System ordered) 

Assembly Procedure 

Special Notes:

 If the Roverpet 4

’x4’ whelping box consists of a door panel, it needs to be configured with the door located on 

the right to allow door hinge clearance. 

 

 

Assembly of the Roverpet Puppy Rail System needs to be done outside of your existing Roverpet whelping box, than installed 

into the whelping box once fully assembled. 

1.)  Unpack contents of shipping carton and compare to inventory list above. 
2.)  Install all 

(4) 

legs of the Roverpet Puppy Rail System into the 4 small leg hole locations on both #PR48LB. 

 

 

 

 

Reviews: