background image

 

 

 

 

Cable Kit 

SKDP03-T 

10 M 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Mounting instructions 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Summary of Contents for SKDP03-T

Page 1: ...Cable Kit SKDP03 T 10 M Mounting instructions ...

Page 2: ...DP03 T 3 Figure 2 1 Cable cross section 4 Figure 2 2 Stripped cable and bare shielding 4 Figure 2 3 Blank shielding wire and shielding braid 4 Figure 2 4 Shrinking tube over twisted shielding braid 5 Figure 2 5 Customized cable 5 Figure 2 6 Connection in the terminal box 6 Figure 3 1 Components of the barrier gland 7 Figure 3 2 Configure the connection for the barrier gland 7 Figure 3 3 Kneading o...

Page 3: ... The electrical connection of the equipment must be executed by quali fied personnel only Attention Please observe the national regulations regarding security installa tion and accident prevention e g IEC 60079 14 Attention When stripping the isolation no inner cores must be damaged a b c d 10 m SKDP03 T System Cable Digital a 1 x cable gland with compound b 5 ml Loctite threadlock c 1 x CAT6 RJ45...

Page 4: ...the shield is uncovered In a next step separate the shield by pulling out the data elements 8 from the copper wire shielding 4 see figure 2 2 Figure 2 2 Stripped cable and bare shielding Cut off the five filling threads and the plastic foil Make sure that the blank shielding wire 5 is not removed Twist this blank wire with the shielding 4 as shown below Figure 2 3 Blank shielding wire and shieldin...

Page 5: ...air blower Figure 2 4 Shrinking tube over twisted shielding braid After this put the black shrinking tube over all cables and the shielding and shrink it Remove approx 1 cm of the foil 6 at the top of the 4 twisted pairs 8 Untwist them to match this length and cut off the ends with a wire stripper Squeeze the wire end ferrules onto the 3 power cables the grounding cable Figure 2 5 Customized cable...

Page 6: ...e already connected camera cable also the cables of the cable kit are connected so that the colors match Please do not untie the twisted pair network and put the shielding braid as close to the clamps as possible Tidily strip the ends of the wires and mount them firmly Figure 2 6 Connection in the terminal box On YouTube you will find precise instructions on the cable configuration and the connec ...

Page 7: ...eparate the shield and cut off the blank shielding wire 5 and the shielding braid 4 so that the foil around the cables can be removed To prepare the twisted pairs 8 for the kneading screw connection they need to be untwisted Slightly unscrew the red outer seal nut until the cable can be easily inserted into the screw connection 1 insert direction from outer seal nut towards screw connection 1 The ...

Page 8: ...sure that it does not overlap the tube If required add more compound into place until the compound tube is fully filled Figure 3 3 Kneading of the barrier gland The compound should be flush to the tube Please let everything dry for at least 24 h and allow the compound to harden After the drying period please check that all cables are tightly connected with the compound and screw on the screw conne...

Page 9: ...s of the same color will be put through the applicable opening and then cut off flush at the front It is important that the shielding is lead through until it touches the shielding clamp Figure 4 1 Connecting the RJ 45 plug With a gripper press together the plug until it snaps and remove the piece of paper Figure 4 2 Completed cable with a RJ 45 plug For detailed instructions regarding the connect...

Page 10: ... cable is connected by using a barrier gland In safe areas it is sufficient to use a common cable gland Cable distribution Black 24 VDC Blue 0 VDC Green yellow to earth potential 6 Support contact If you have any questions or if you need our support please contact us at Mail support samcon eu Tel 49 6426 9231 0 https www samcon eu en contact ...

Page 11: ...Doc ID CableKitSKDP03 T_10M_MountingInstructions_rev 00 docx Seite 11 von 12 7 Notes ...

Page 12: ...Doc ID CableKitSKDP03 T_10M_MountingInstructions_rev 00 docx Seite 12 von 12 Schillerstrasse 17 35102 Lohra Altenvers www samcon eu info samcon eu fon 49 6426 9231 0 fax 31 ...

Reviews: