Pre- Installation Requirements
Verona TCS 3 Group
The following information is provided to assist building contractors, shop fitters and site operators to plan and
prepare the site and intended location for the installation of a Sanremo espresso machine.
It is important that all services are in place prior to machine installation and should be within
1 metre
of intended
machine position. Our technicians are only authorised to connect to properly terminated services
. Insurance
limitations
preclude us from carrying out any work to a site’s water, waste or electricity supplies.