background image

 

 
SCHAKO KG 

  Phone  +49 (0) 7463-980-0 

Steigstraße 25-27 

  Fax  

+49 (0) 7463-980-200 

D-78600 Kolbingen 

  schako.com | info@schako.de

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Fig.: BKA-U with B10 actuator and smoke detection system RMS 

 

 

 
USABILITY CERTIFICATE 

 

General type approval (aBG)  
Z-6.50-2012 

 
 
 
 

CONSTRUCTION PRODUCTS TO BE USED IN 
COMPLIANCE WITH GENERAL TYPE APPROVAL 

 

Fire damper model BKA-EN according to DIN EN 
15650 

 

Smoke detection system type RMS in compliance 
with general building supervisory approval (abZ) 
no. Z-78.6-58 

 

PERFORMANCE DATA 

 

To close the openings in fire-resistant walls 
and ceilings 

 
 
 
 

 

SPECIAL FEATURES 

 

Extensive uses and applications 

 

Large free cross-sections 

 

 

 

BKA-Ü 

Fire-resistant damper 

of special design and application 

Technical Documentation  
"Installation, Mounting and Operating Instructions"

 

Summary of Contents for BKA-U

Page 1: ...LIANCE WITH GENERAL TYPE APPROVAL Fire damper model BKA EN according to DIN EN 15650 Smoke detection system type RMS in compliance with general building supervisory approval abZ no Z 78 6 58 PERFORMAN...

Page 2: ...12 Installation in lightweight partition walls with metal posts 14 Lightweight partition walls with panelling on both sides and wall thickness W 100 mm 14 Wet installation of a fire damper complete mo...

Page 3: ...e housing made of galva nised sheet steel with spring return actuator 24 V SCHAKO Mounting part type EBT galvanised sheet steel model painted black matt on the inside SCHAKO Finishing protective grati...

Page 4: ...1 Fire Resistant Damper Model BKA 2 Assembly part type EBT painted black matt on the inside 3 Extension piece type VT required for H 400 4 Finishing protective grating type ASG operator side painted...

Page 5: ...or type RMSII L must always be installed above B side in the assembly part type EBT H mm L1 mm L mm L2 mm Total length mm 200 180 500 680 225 250 275 300 325 350 375 400 180 860 450 500 550 600 650 70...

Page 6: ...nelling on both sides 6 100 next to each other 200 2 EI 90 ve i o S 20 Dry installation in lightweight partition walls with metal posts and panelling on both sides 6 75 next to each other 200 2 EI 30...

Page 7: ...and date of issue and signature of the person responsible This declaration of compliance has to be handed over to the building owner for possible forwarding to the respon sible building supervision a...

Page 8: ...gap dimensions for complete mortar lin ing in solid walls Wet installation of two fire dampers at a re duced distance or flange to flange Installation of max two BKA s next to each other in an in sta...

Page 9: ...estop boards after installation of the BKA installation dimension 210 mm is possible starting with an annular gap of about 100 mm For each BKA a separate installation opening must be provided The dist...

Page 10: ...the operating side has to be compiled with The annular gap must be sealed with two layers of firestop boards pos 37 1 of the Hilti soft seal system see p 9 among others With an annular gap of 50 100...

Page 11: ...nce from adjacent components wall is at least 40 mm Further information to be considered see page 7 Minimum distances or projecting ends Figure 9 Annular gap dimensions for complete mortar lin ing in...

Page 12: ...n addition to the constructive anti crack reinforcement it must be ensured that the concrete base is applied di rectly to the reinforced concrete ceiling or connected to the raw ceiling Any separating...

Page 13: ...cement to the reinforced concrete ceiling if an annular gap is present in the immediate ceiling opening area it must be sealed with concrete in the appropriate grade 8 e 500 mm splice bar in ceiling p...

Page 14: ...components must be due to the design at least 90 mm from the wall and at least 80 mm from the ceiling The actual minimum distance may slightly differ from the distances mentioned therein and must be e...

Page 15: ...unting of BKA with the help of mounting suspensions etc Insert mortar pos 13 into the circumferential gap of 40 mm between the BKA housing and the circumferential metal profiles pos 10 If reveals pos...

Page 16: ...Insert mineral wool pos 11 3 non flammable according to EN 13501 1 packing density 80 kg m melting point 1000 C into the circumferential gap 40 mm in width be tween the housing of BKA and the circumf...

Page 17: ...Minimum distances or projecting ends The ER A1 installation frame is to be ordered as an acces sory extra charge supplied loose or factory mounted Figure 18 Metal stud frame with required replacement...

Page 18: ...2 fixing lugs side 400 to 865 3 fixing lugs side 865 Table 5 Number of fixing lugs per side for ER A1 Figure 22 Examples of fixing lug number and positioning for installation frame type ER A1 Figure 2...

Page 19: ...frame type ER A1 Mounting of BKA with the help of mounting suspensions etc BKA is fastened on all sides to the supporting structure exchange profiles pos 10 using the appropriate number of fixing lug...

Page 20: ...mentioned therein and must be executed and adapted as a function of the wall connection type Further information to be considered see page 7 Minimum distances or projecting ends Soft seal system Permi...

Page 21: ...of the boards themselves must be covered with the firestop sealant pos 37 3 and sealed In gen eral the specifications and processing guidelines of the soft seal manufacturer must be observed BKA is su...

Page 22: ...wall manufacturer and the required ex change parts as shown on Figure 33 Insert BKA pos 1 into the wall recess operating side observe the installation dimension of 210 mm Average out the circumferent...

Page 23: ...g 1 Fire resistant damper model BKA 9 1 Profile CW 75 50 06 150 profiles 10 1 Profile UW 75 40 06 150 profiles 12 1 Panelling on one side 2x25 of the shaft wall made of gypsum bonded wall boards The s...

Page 24: ...ems etc with proven fire resistance duration must be used and matched to the ceiling designs Push through mounting with fasteners above the solid ceilings is also possible see Figure 37 Figure 37 Push...

Page 25: ...23 0 248 0 272 0 297 0 322 0 347 0 371 0 396 0 446 0 495 0 545 0 594 0 644 0 693 0 743 600 0 109 0 123 0 136 0 150 0 164 0 177 0 191 0 204 0 218 0 245 0 273 0 300 0 327 0 354 0 382 0 409 0 436 0 491 0...

Page 26: ...10 B20 B32 S00 S10 S20 Assignment of the actuator types according to the dimensions B10 BFL24 T ST SO or S00 GRA126 1E SO3 B20 BFN24 T ST SO or S10 GNA126 1E SO3 B32 BF24 TN ST SO or S20 GGA126 1E SO3...

Page 27: ...s of the control key of BAT Spare parts Temperature fuse for temperature inside the duct ZBAT72 Exchange takes place by unscrewing the two screws of the thermoelectric release device Remove the thermo...

Page 28: ...SK79 4 The replacement takes place by unscrewing both screws at the temperature monitoring unit and removing the ac tuator unit Pull the duct tip internal duct temperature fuse off the temperature mon...

Page 29: ...LED fault 7 LED alarm 8 LED operation 9 Connection RMSII L 10 AMP plug for 24V AC DC spring return actuator 11 Selector switch 1 potential free contact 1 foot contact 24V 230V 12 Selector switch 2 pot...

Page 30: ...the components when mounting the in stallation frame ER A1 BKA must be placed on a suitable surface e g cardboard pallet etc during mounting All holes required for screw mounting have been predrilled...

Page 31: ...ature sensitive measuring sensor Response temperature of the temperature sensitive measuring sensor passed Response delay Response time Closing time passed Operational safety Cyclic testing 50 cycles...

Page 32: ...350 375 400 450 500 550 600 650 700 750 800 in mm always three digits 04 LENGTH 500 in mm always three digits 05 MATERIAL HOUSING SV Galvanised sheet steel standard V2 Stainless steel material no 1 43...

Page 33: ...ion must be observed For the installation in solid ceilings the dimensions of BKA are limited to W and H 500 mm For wall installation the smoke detector type RMSII L must always be installed above B s...

Page 34: ...he safe operation must be observed Observe the notes in the general type approval aBG no Z 6 50 2012 section 3 1 Electric spring return actuator 1 1 Visual inspection Check BKA for damage and contamin...

Page 35: ...etector and or relay module RM must flash green 2 2 Internal check 2 2 1 Fault control On the smoke detector RMSII L the transmitter and receiver sensors must be covered The diode on the smoke detecto...

Page 36: ...s Release device The following functional steps have been carried out according to the documents installation mounting and operating instructions Prior to commis sioning Next functional check in _____...

Page 37: ...ko de Web schako com Sample Functional test protocol for fire resistant dampers Cons No ____________________ Defects found during the test on ________________________________________ Sluggishness due...

Page 38: ...nufactured and labelled in compliance with all regulations of the general type approval aBG No Z 6 50 2012 by German Institute for Building Technology Deutschen Instituts f r Bautechnik of and if rele...

Page 39: ...L 2343 Luxembourg A 1060 Wien PL 05 500 Piaseczno Phone 352 403 157 1 Phone 352 403 157 1 Phone 43 1 890 24 62 Phone 48 22 7263570 Fax 352 403 157 66 Fax 352 403 157 66 Fax 43 1 890 24 62 50 Fax 48 22...

Page 40: ...all 16 Figure 18 Metal stud frame with required replacement parts at W 125 mm and 1 layer of circumferential reveal 12 5 mm for BKA with ER A1 installation frame 17 Figure 19 Metal stud frame with req...

Page 41: ...Figure 39 Fastening detail of suspension angle 24 Figure 40 Circuit diagram of relay module RM 29 Figure 41 BKA with ER A1 installation frame loose 30 Figure 42 Side view BKA spring return actuator 34...

Reviews:

Related manuals for BKA-U