background image

ASSEMBL

Y INSTRUCTIONS

MAN 4173033

Rev

. B  02-2017

75-71234A

ELECTRIC DEFLECTOR KIT FOR SNOWBLOWER

 

Summary of Contents for Steiner 75-71234A

Page 1: ...ASSEMBLY INSTRUCTIONS MAN 4173033 Rev B 02 2017 75 71234A ELECTRIC DEFLECTOR KIT FOR SNOWBLOWER ...

Page 2: ......

Page 3: ...hiller Grounds Care Inc service ensures that you continue to receive the best results possible from Schiller Grounds Care Inc products You can trust Schiller Grounds Care Inc replacement parts because they are manufactured with the same high precision and quality as the original parts Schiller Grounds Care Inc designs and builds its equipment to serve many years in a safe and productive manner For...

Page 4: ...ies or products not approved by Schiller Grounds Care Inc will be considered the responsibility of the individual s or company designing and or making such changes Schiller Grounds Care Inc will vigorously pursue full indemnification and costs from any party responsibleforsuchunauthorizedpost manufacture modifications and or accessories should personal injury and or property damage result This sym...

Page 5: ...ector moves freely 2 Drill holes B Ø 11 32 and C Ø 7 25 on the side of the chute with the provided drilling template Use hole A Ø 11 32 and the edges of the chute to position the drilling template NOTE Depending on the model of the blower some chutes have hole B pre drilled If so use hole B to position the drilling template TOOLS REQUIRED 1 Ratchet 2 Wrenches 7 16 1 2 1 Wrench for the nuts on the ...

Page 6: ... Step 3 9 Insert the gasket Item 9 and the electric motor Item 7 on the bolts also 10 Secure the assembly with three 1 4 nylon insert locknuts Item 27 Make sure the gasket is properly positioned on the motor 4 Insert three 1 4 X 2 hex bolts Item 23 into the Ø9 32 hole drilled inthe chute Insert three 5 16 flat washers Item 31 5 Insert two spacers Item 10 on the two back bolts 6 Insert oil lite bus...

Page 7: ...ashers Item 31 and the 1 4 nylon insert locnut Item 29 Note The washers must be positioned between the head of the chute and the arm DO NOT TIGHTEN COMPLETELY so the deflector moves freely CONTROL BOX ASSEMBLY 12 Install the rubber grommet Item 19 in the cover Item 5 13 Pass wire assembly Item 6 Wires A and B thru the rubber grommet as pictured ...

Page 8: ...h Item 16 as shown below Be sure to position wire A B properly to avoid short circuit 16 Install the switch Item 16 into the box Item 4 Secure with the rubber boot Item 17 Tighten firmly 14 Plug the breaker Item 18 on the red wire Plug the small wire Item C on the breaker ...

Page 9: ...o possible to install the switch without the control box in the dashboard or on the lever of the tractor s hydraulics 19 Turn the chute to its maximum towards the right 20 Secure the wires of the deflector motor item A with a tie wrap around the motor 21 Tie the wires with another tie wrap in the hole at the base of the deflector item B as shown 22 Install the connector item 14 by cutting the wire...

Page 10: ...CAUSES CORRECTIVE ACTION Electric motor does not work Overheating of the motor These motors are equipped with internal protector Wait 10 minutes before using The deflector works inopposite direction the Wires are inversed Change the black wire with the white wire of the electric motor to switch ...

Page 11: ...00 1080 1220 4 1464 5 METRIC BOLT TORQUE SPECIFICATIONS COARSE THREAD FINE THREAD Size Screw Grade No Pitch mm Foot Pounds Newton Meters Pitch mm Foot Pounds Newton Meters M6 4T 1 00 3 6 5 8 4 9 7 9 7T 5 8 9 4 7 9 12 7 8T 7 2 10 9 8 13 6 M8 4T 1 25 7 2 14 9 8 19 1 00 12 17 16 3 23 7T 17 22 23 29 8 19 27 25 7 36 6 8T 20 26 27 1 35 2 22 31 29 8 42 M10 4T 1 50 20 25 27 1 33 9 1 25 20 29 27 1 39 3 7T ...

Page 12: ...10 PARTS BREAKDOWN ...

Page 13: ...c 1 4173032 16 18 Breaker Disjoncteur 1 4173032 17 19 Rubber grommet Oeillet de caoutchouc 1 4173032 18 20 Hex bolt 1 4 n c x 1 2 GR5 Boulon hex 1 4 n c x 1 2 GR5 2 64123 49 21 Hex bolt 1 4 n c x 1 1 4 GR5 Boulon hex 1 4 n c x 1 1 4 GR5 2 64123 80 22 Hex bolt 1 4 n c x 1 3 4 GR5 Boulon hex 1 4 n c x 1 3 4 GR5 2 4173032 19 23 Hex bolt 1 4 n c x 2 GR5 Boulon hex 1 4 n c x 2 GR5 3 64123 60 24 Carriag...

Page 14: ...Schiller Grounds Care Inc One Bob Cat Lane Johnson Creek WI 53038 ...

Reviews: