background image

 

 

 

 

 

 

 

 
 

Shenzhen SCOTLE Technology 

----------------------------------------------------------------------- 

Email:sales08@diy-buy.net    Tel:8675589378931    Alice       

http://www.scotle.com/ 

------------------------------------------------------------------------------------------------ 

 
 

Scotle IR360 pro

 V3 Manual 

 

 

 

 

 

Scotle

 IR360 PRO V3 Brief Introduction 

 

Scotle IR360 PRO V3 is a 3 in 1 multi-functional

 BGA Rework Station 

 

with hot air head, infrared head and an 80w soldering iron . 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 

Scotle IR360 PRO V3 specifications

Summary of Contents for IR360 pro V3

Page 1: ...89378931 Alice http www scotle com Scotle IR360 pro V3 Manual Scotle IR360 PRO V3 Brief Introduction Scotle IR360 PRO V3 is a 3 in 1 multi functional BGA Rework Station with hot air head infrared head...

Page 2: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com...

Page 3: ...atures Scotle IR360 PRO V3 functions and outstanding features as below 1 It is with three independent temperature zones top temperature zone can use dark infrared or hot air heater for your preference...

Page 4: ...w cooling system to accelerate the preheating zone cooling to ensure the success rate of continuous de soldering 4 Bottom hot air nozzles follow the high tech rework station s mature design 5 Using hi...

Page 5: ...n in a room which the breeze flow is 2 m s This can lessen affect caused by breeze flow and improve reworking efficiency 2 Scotle IR 360 Maximum power consumption is 3450W average power consumption is...

Page 6: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com Scotle IR360 pro V3 Photos SCOTLE IR360 PRO V3 Front View...

Page 7: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com SCOTLE IR360 PRO V3 vertical view...

Page 8: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com SCOTLE IR360 PRO side review...

Page 9: ...y Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com SCOTLE IR360 PRO V3 is with built in an high quality soldering iron station it can be used independently with independent contro...

Page 10: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com The hot air head and infrared heat is easy to be exchanged only by unscrewing the four screws here...

Page 11: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com...

Page 12: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com Top Heater head can move flexible forward backward up down right left Top IR Heater...

Page 13: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com Lower Hot Air Heater Can be moved up down Infrared Pre heater...

Page 14: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com Fix the PCB The thermocouple is easy to be placed...

Page 15: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com BGA chip already pick away successfully Control Panel Introduction...

Page 16: ...outlet When you use hot air head you need to use this outlet for thermocouple 2 Infrared rework thermocouple outlet When you use infrared head use this outlet for thermocouple 3 Switch for cross cooli...

Page 17: ...r button After you set or select temperature profile press START the machine will begin to run the profile 10 Stop button When you want the running temperature profile to stop or stop for the time bei...

Page 18: ...ups temperature profiles including 8 heating temperature profiles 8 constant temperature profiles 15 Top air adjust spin button to adjust the top hot air volume Start Press START button for 3 seconds...

Page 19: ...gy Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com The size of preheating area the last left and right long ceramic plates can be controlled by the two buttons on the right side...

Page 20: ...Used Button PTN Temperature profile selection each Temperature Control instrument can stored 0 9 total 10 group temperature curves Press PTN the PTN LCD window show the number of the current temperat...

Page 21: ...ction In actual use you only need to place the thermocouple wire sensor in the bottom of BGA chip then you can observe the BGA chip s actual temperature Control Panel Introduction 1 SV switch key 2 Nu...

Page 22: ...net Tel 8675589378931 Alice http www scotle com 5 Curve pause key press it the machine pause 6 Set Switch Press it to enter next step 7 Actual temperature display window 8 Profile groups display windo...

Page 23: ...e slope S r1 3 r2 3 r3 3 r4 3 r5 3 Bottom heating zone L1 100 L2 175 L3 195 L4 220 L5 230 Bottom temperatur e ramp up Time S D1 40 D2 40 D3 40 D4 40 D5 40 Preheating area Target Set 160 Shenzhen SCOT...

Page 24: ...mperature has great effect on profile need flexible adjustment 1 Press PTN the PTN window display 0 means select ing 0 profile 2 Press SET button to set the first parameters of 0 group profile r1 is t...

Page 25: ...bove setting press PAR to enter next parameter setting of 0 profile L1 is the target temperature of first segment of 0 profile We set for 60 and then continue to press PAR 4 After finishing above sett...

Page 26: ...le com to the target temperature165 In below picture 60 unit is second It means after get to 165 this temperature keeps unchanged and lasts 60 seconds 5 Press PAR to enter into second segment setting...

Page 27: ...sales08 diy buy net Tel 8675589378931 Alice http www scotle com 7 Press PAR to set D2 the value is 40 After the temperature get to 165 it keeps no change and last 40 seconds 8 Press PAR to set third...

Page 28: ...Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com 9 Press PAR to set L3 it is 195 10 After reach to target temperature 195 It will last40 seconds...

Page 29: ...en SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com 11 Press PAR to set fourth segment of 0 profile slope r4 is 3 00 12 Target temperature of fourth segment L4 i...

Page 30: ...sales08 diy buy net Tel 8675589378931 Alice http www scotle com 13 Press PAR to set D4 of fourth segment it is 40 which means it will last 40 seconds after get to 215 14 Press PAR to set fifth segmen...

Page 31: ...n SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com 15 Set target temperature of fifth segment L5 to 225 16 After reach to target temperature 225 it will last 40...

Page 32: ...y Email sales08 diy buy net Tel 8675589378931 Alice http www scotle com 17 After the fifth segment finished Press PAR to r6 then press until End comes out It means after running above 5 segments 0 tem...

Page 33: ...scotle com If you want to set more segments of one temperature profile or more profiles please do above steps 18 Below parameters Hb is set for 320 please do not modify Lower hot air heater temperatu...

Page 34: ...e com 1 PV Actual temperature display 2 SV Setting temperature display 3 SET for setting temperature 4 Temperature key Temperature Setting Methods press SET for 1 second then loosen PV display SO SV d...

Page 35: ...current room temperature any time Summer and winter is different Methods for increasing the preheating temperature Increase the heating time of first segment of both top IR lower heater And higher the...

Page 36: ...net Tel 8675589378931 Alice http www scotle com 4 When reworking 775 and 478 CPU socket we suggest use the same size air nozzle with 775 and 478 the air nozzle should toward to 775 tentacle and 478 ja...

Page 37: ...4 3 r5 3 Bottom heating area L1 100 L2 175 L3 195 L4 235 L5 245 Bottom temperature area Time S D1 40 D2 40 D3 40 D4 40 D5 40 Preheating Area Set Point 160 Preheating Suggest 150 summer 180 winter indo...

Page 38: ...3 r2 3 r3 3 r4 3 r5 3 Top heating area L1 165 L2 185 L3 215 L4 235 L5 245 Top temperature area Time S D1 40 D2 40 D3 40 D4 40 D5 40 Bottom temperature area r1 3 r2 3 r3 3 r4 3 r5 3 Shenzhen SCOTLE Tec...

Page 39: ...180 summer 200 winter indoor temperature has a great effect on curve impact on curve need flexible adjustment Applicable Materials Lead Free Curve common material such as INTEL north south bridge chi...

Page 40: ...40 40 40 50 50 Preheating Suggest 180 summer 200 winter indoor temperature Area Bottom Heating Area 165 195 225 245 260 Time 40 40 40 45 45 Preheating Area Suggest 180 summer 200 winter indoor tempera...

Page 41: ...uggest 160 summer 180 winter indoor temperature has a great effect on curve impact on curve need flexible adjustment Shenzhen SCOTLE Technology Email sales08 diy buy net Tel 8675589378931 Alice http w...

Page 42: ...ure has a great effect on curve impact on curve need flexible adjustment Applicable Materials Lead Free Curve laptop NV etc graphics card curve Stage 1 2 3 4 5 Top 165 195 215 232 242 Shenzhen SCOTLE...

Page 43: ...g and find suitable curve BGA chips de soldering is subject to variety of environmental impact air temperature humidity indoor breeze flow PCB thickness PCB copper foil distribution and so on There ca...

Page 44: ...mplete observe the temperature from thermocouple wire ideal temperature lead free curve about 217 leaded curve about 183 This two temperature is the melting point of lead free and leaded materials But...

Page 45: ...highest temperature segment finish the best point is not exceed 240 if more reduce the fifth segment temperature appropriate 2 When Soldering the PCB thimble which is on bottom bracket can t withstand...

Page 46: ...opper foil is not a even the outboard 1 2 are ground wire and power supply copper foil the inboard 1 2 are all signal lines According to our test the maximum difference in temperature can reach to 20...

Page 47: ...ldering Please select shady and cool place to store 3 Clean Work in BGA Welding BGA stencil can be clean with specialized washer water and ultrasonic Cleaner Solder ball do not recycle use after first...

Page 48: ...e professional method is use the constant temperature oven in 100 to do more than 10 hours drying operation on the board and chip Advice purchase of moisture proof case to store the chip cause even br...

Page 49: ...s calories In other words the same temperature of 250 at the beginning of heating chips the other bottom temperature is different and the temperature will even after some minutes Therefore the tempera...

Page 50: ...e http www scotle com 2 CD without warranty If damaged please contact us to download Contact Us ADD Room 101 First Floor A Dormitory Nankeng First Industry Park Bantian Longgang District Shenzhen Chin...

Reviews:

Related manuals for IR360 pro V3