Assembly of Flat Pack Loft
©
Parts List
Completed Loft
QTY DESCRIPTION
Balustrade Railing (A2):
2:
1025 mm Rebated sections
1:
1300 mm framework (A3)
8:
660 mm slats (12 x 70 mm)
1:
630 mm framework
Shutters (B1):
16: 50 x 518 mm long shutter pieces
16: 80 mm blocks
Ladder (A4):
2:
notched posts 1050 mm long
5:
475 mm ‘steps’
Floor (A):
8:
370 mm framework
For Upstairs support:
1:
732 mm framework
BUI
BUILT AROUND OUR REPUTATION
T AROUND OUR REPUTATION
Thank you and congratulations on the purchase of your Shire Garden Building. We believe that this product will
give you many years of excellent service. This is a natural product manufactured to a high standard therefore
if you have any queries or experience any difficulties then please contact our customer service hotline
on
01945 465295
. Normal office hours: 8.30am to 5.00 Monday to Friday. Answerphone all other times.
Preparation of Base
Adult Assembly Only - Do not attempt to modify this Playhouse
We recommend that the base onto which your building will stand should be at least 75mm larger in each
direction than the total floor size of the building.
Actual floor area of the building:
2400 x 1668mm
Total height clearance:
2350mm
The chosen position in your garden for the siting of the building should be excavated to a depth of 75mm to
allow a base of sand, on to which paving slabs can be evenly laid -
THEY MUST BE LEVEL AND FIRM.
Treatment/Care
of your Garden
Building
Treat with a suitable decorative
wood finish immediately. We
recommend that all timber
pieces be treated again prior to
assembly and again within 3
months of assembly. We
further recommend that all
pieces are treated again at
least annually or as frequently
as the instructions on the
product used recommends.
We would suggest that all wall
panels be treated in an upside-
down position to allow the
finish/treatment to ingress into
the tongue and groove jointing.
We would also remind you that
you would rarely (if ever) be
able to re-treat the underside
of the floor following assembly.
We strongly recommend that
the underside of the floor is
treated an absolute minimum
of twice (not including pre-
treatment). Use only child safe
wood preservative and allow to
dry thoroughly before further
use. Do not use creosote.
Tools Required
IMPORTANT!
PLEASE READ PRIOR TO ASSEMBLY OF
THE BUILDING
EVERY PRECAUTION IS TAKEN TO ENSURE
THAT YOUR BUILDING HAS NO ELEMENT
INCORRECTLY PLACED OR POSSIBLY
HAZARDOUS, HOWEVER PRIOR TO USE PLEASE
CHECK ALL SURFACES FOR THE FOLLOWING:
1 RAISED GRAIN, SPLINTERS: sand down
timber to smooth finish
2 NAIL/SCREW/PIN HEADS PROUD: tap
home to be flush with surface of timber
3 DAMAGED SCREW HEADS RESULTING
IN SHARP SPLINTERS OF METAL: replace
4 SHARP ENDS OF NAILS/SCREWS/PINS
PROTRUDING THROUGH THE PANEL:
remove and reposition.
5 ENSURE ALL PARTS ARE SECURED
AGAINST REASONABLE FORCE: remove
and refit
6 ENSURE THERE ARE NO LOOSE PARTS:
remove and refit/discard
We recommend that protective gloves
be worn throughout
Wood is a natural product and is therefore
prone to changes in appearance, including
some warping, movement and splitting,
particularly during unusual climatic conditions
(long hot or wet spells of weather). As a natural
occurrence this is not covered by a guarantee.
PLEASE NOTE
PLEASE KEEP THIS LEAFLET FOR FUTURE REFERENCE
●
Posidrive screwdriver (electric is best)
●
Drill and 6mm and 3mm drill bit
●
Hammer
●
Sandpaper (to smooth any rough edges)
●
Cutting knife
●
Tape measure
●
Step ladder
●
Ruler
●
Pencil
●
Saw
●
Chisel
Warning:
The Playhouse contains stairs that
present a falling hazard to younger children.
Ensure all children that play in the house are
aware of the danger and are able to cope with it.
Adult supervision is recommended and boisterous
play within the house should be discouraged.
PLEASE LAY OUT PARTS AND CHECK OFF AGAINST CHECK LIST BELOW:
QTY DESCRIPTION
1:
Piano hinge (or two sections)
3:
False hinges
4:
Window Hinges
2:
Casement Stays
4:
Casement Stay Pins
1:
Ring Handle
1:
Door Catch
1:
Block of wood
2:
Vents
1:
Door glazing material
4:
Door rebated pieces beading
255: 25mm Screws
84: 60mm Screws
12: 25mm Black Screws
74: 40mm Nails
10: 80mm Screws
110: Felt Nails
128: Panel Pins
K
K
J1
H1
I
J2
H
H
H
H3
H
D
D
D
D
D
D
H2
E
F
E
F
C
B
B2
A
A
A
B1
C1
B
A1
A2
A3
A4
B3
B4
G
G
G
G
G
BB
QTY DESCRIPTION
Building Parts:
18: Timber Sections (Ax3, A1x1,
Bx2, BBx1, Cx1, Dx6, Ex2, Fx2)
4:
Window Inserts (B2)
16: Window glazing material (B3)
64: Pieces beading (B4)
1:
Door (C1)
12: Coverstrips (10 @ 1720mm 2 @
500mm) (G)
6:
OSB Roof Panels (3 large, 3 small) (H)
4:
Roof framework @ 960mm (H1)
4:
Roof bearers @1600mm (H2)
4:
Roof Blocks @ 230mm (H3)
1:
6mtr roll of felt (I)
2:
Profiled Facia (J1)
2:
Plain Facia (J2)
2:
Diamonds (K)