A 18/01/2011 J Shepherd
1. Check all components before
commencing with the construction
of your Salcey
2. The only parts that may require
trimming are the final roof and
floorboards.
3. Keep all timber dry or your building
will not fit together.
4. We also recommend that you seal
the corner log joints with silicone
sealant (not supplied).
5. We recommend a minimum of two
people required for assembly.
6. Read through all the instructions
before constructing your pine lodge.
7. You will see there is a set of lettered
drawings showing each side of the
building. You will find these letters
printed at one end of each log or in
the slot.
Adult assembly only-Do not attempt to modify this playhouse
Thank you and congratulations on the purchase of your Shire pine lodge.
We believe that this product will give you many years of excellent service.
This is a natural product manufactured to a high standard therefore if you
have any queries or experience any difficulties then please contact our
customer service hotline
on
01945 46 89 10 01945 46 89 11 01945 46 89 12
Normal office hours: 8.30am to 5.00pm Monday to Friday. Answer phone all other times.
Assembly of Salcey play cabin
See drawings for log quantities
QTY DESCRIPTION Sizes in mm
Floor
5 Pressure treated floor bearers 38x63x1600
11 Floor Boards 139x14x1540
3 Skirting 25x40x1600
1 Skirting 25x40x900
1 Skirting 25x40x250
Terrace
5 Pressure treated deck bearers 38x63x395
4 Deck boards 22x95x1590
2 Terrace capping pieces V1 20x70x330
2 Terrace end caps V2 20x7x600
Roof
3 Roof joists 44x44x2090
1 Felt 10m roll
4 Fascia-2 plain –2 wavy
32 Roof Boards 139x14x1060
2 Diamond
2 Angled eaves edging 2090
2 Roof edging 44x44x2090
Doors & Windows
1 Door
1 Door frame
1 Black door ring
1 wooden door knob
1 Continuous door hinge
1 Roller door catch set
QTY DESCRIPTION
1 CE mark plaque
2 Window frames
2 Window inserts
4 Window hinges
2 Casement stays
4 Casement stay pins
12 Styrene glazing
48 Beading
Other &Hardware
2 Vent kits
28 80mm screws
100 50mm screws
1 45mm flat head screw (for wooden knob)
60 25mm screws
205 40mm round , flat head nails
170 40mm oval nails
110 Felt nails
100 Panel pins
2 playhouse window boxes
Preparation of base
Prior to assembly a suitable perfectly level concrete base must be
provided
. Actual floor area 2790 mm x 2090 mm
.
Parts list
Treatment/care of your pine lodge
All timber must be dry to apply the timber treatment.
Treat with a suitable decorative wood finish immediately. We recommend
that
you treat the door and window slots (fig 22 & 23) with a top quality timber
treatment before assembly and treat the entire building as soon as
assembly is complete, we further recommend that all pieces are treated
and again within 3months of assembly and again at least annually or as
frequently as the instructions on the product used recommends.
We would also remind you that you would rarely (if ever) be able to
re-treat the underside of the floor boards following assembly. We strongly
recommend that the underside of the floor is treated an absolute minimum
of twice, the floor bearers are pressure treated and don’t need to be
treated although you may if you wish.
Use only child safe wood
preservative and allow to dry thoroughly before further use. Do not
use creosote.
Tools required
●
Hammer
●
Rubber mallet
●
Spirit level
●
Stepladder
●
Battery-powered drill/screwdriver
●
8mm drill
●
3mm drill
●
Tape measure
●
Gloves
IMPORTANT!
Completed Salcey play cabin
Wood is a natural product and is therefore
prone to changes in appearance, including
some warping, movement and splitting,
particularly during unusual climatic conditions
(long hot or wet spells of weather). As a natural
occurrence this is not covered by a guarantee.
PLEASE NOTE
PLEASE LAY OUT PARTS AND CHECK OFF AGAINST CHECK LIST BELOW: