P/N 315-093305-2
Installation Instructions
CERBERUS PYROTRONICS
TM
Model ALI-8
The
CERBERUS PYROTRONICS
TM
Model
ALI-8 is an enclosure assembly that accom-
modates up to eight TRI-60Ds to provide the
interface between the MXL and the
AnaLASER control panels (See also
TRI-60D
Installation Instructions, P/N 315-092329).
Fasten the enclosure securely to a clean, dry,
shock-free, and vibration-free surface. Con-
sider the following when mounting the box.
—Mounting height for visual and manual
access to the modules in the enclosure
—Weight and size of the enclosure
—Local mounting codes
—The maximum cable length of 200 feet
(18 AWG) for the TRI-60Ds to the
AnaLASER equipment
When mounting, position the backbox clear of
obstruction so that the door can open freely
and so that the modules are easily accessible.
TO INSTALL THE ALI-8
1. Slip the door off the hinges of the box and
put it to one side temporarily.
2. Cover the opening in the door by placing
the black metal plate over the studs
located on the door.
Figure 1
Enclosure for the ALI-8
Cerberus Division
Siemens Building Technologies, Inc.
8 Fernwood Road
Florham Park, New Jersey 07932
Siemens Building Technologies, Ltd.
50 East Pearce Street
Richmond Hill, Ontario L4B 1B7 CN