3.1 Check Packing List
3. Preparation
2. Overview
B
A
Off-grid1
Object
Name
3.2 Tools
Φ
10 Drill
Marker Pen
Hexagon keys
Phillips Screwdriver
Diagonal Plier
Crimping Plier
Slotted Screwdriver
Monkey Wrench
4. Mounting
Step 1: Screw the wall bracket on the wall
The mounting method of the X1-Matebox bracket is as follows:
Matebox
Load
Grid
X1-Matebox
Quick Installation Guide
1. Introduction
533 mm
4
3
7 m
m
185 mm
A B C
G H I J
L
D E F
D
C
Load
Grid1
F
E
I
H
Grid 2
Off-grid 2
G
K
J Grid
K
Description
Off-grid1
output port
of the inverter
Load connection port
Grid1 output port
of the inverter
Reserved
Battery connection port
(to
battery
pack)
Reserved
Battery connection port of the inverter
Grid
connection port (to local grid)
Reserved
Bracket A *1
Bracket C *1
Bracket B *1
Flange nut *4
Earthing
conductor
*1
(Expansion bolt ,
Gasket ,Self-tapping
bolt) *2
First splice the inverter bracket, bracket A, bracket B, and battery bracket according to the steps, and
then fasten them to the wall.
b)
c)
d)
Expansion
bolts
Screw
c) Insert expansion bolt into the hole, use rubber hammer
to knock the expansion screw bolt into the wall.
b) Drill holes at marked spots with depth of 80 mm.
a) Use the bracket as a template to mark the two holes
on the wall with a marker pen.
Φ
10 drill
a)
Rubber hammer
Torque :2
.
5
±
0
.
2N
·
m
d ) The bracket is aligned with the screw uses the
inner hexagonal wrench to screw the tapping screw
until the expansion bolt "bang" is heard.
Rubber hammer
200.00mm
Bracket A
Bracket B
Inverter bracket
Inverter bracket
Bracket A
Bracket B
Bracket C
Battery bracket
1)
2)
Use a level first to ensure that the brackets (battery bracket, bracket A, bracket B, bracket C, inverter
bracket) in the system are firmly installed and level. Then follow the steps below to hang X1-Matebox.
X1-Hybrid G4 inverter
b) Firstly install the battery and inverter on the wall,
and then install the X1-Matebox on the wall;
C) Open the X1-Matebox buckle, remove the cover, and take out the front protective cover.
5. Monitor the antenna connections of accessories
a)
b)
c)
X1-Matebox
Distrbution Box
Battery
Grid
Off-grid
Grid
B
re
a
k
e
r
Loads
N
Main Breaker
X1-Hybrid G4
Hexagon keys
Torque: 1.5±0.2 N
·
m
Crimping Tool
L
M
M
X1-Matebox
Distrbution Box
Battery
Grid
Off-grid
Grid
B
re
a
k
e
r
Loads
N
Main Breaker
X1-Hybrid G4
Step 4: Finally install the X1-Hybrid G4 inverter bracket (please refer to the
X1-Hybrid G4 inverter quick installation guide).
Step 3: Mounting bracket A
Step 5. Install the X1-Matebox on the wall and lock the screws.
80.00 m
m
X1-Hybrid G4
inverter
Then set the bracket C on the bracket A ;
Then the bracket C is fixed on the battery
bracket and the screws are locked ;
Then set the bracket B on the bracket A and fix it
with screws;
Fix the inverter bracket on the support
B;
Monkey Wrench
Torque: 1.5±0.2 N
·
m
Monkey Wrench
Torque: 1.5±0.2 N
·
m
Monkey Wrench
Torque: 1.5±0.2 N
·
m
Bracket A
Bracket B
Bracket C
Battery bracket
Monkey Wrench
Torque: 1.5±0.2 N
·
m
Inverter bracket
Inner hexagonal
wrench
Philips screwdriver
Torque: 1.5±0.2 N
·
m
Upgrade/
Dongle
Quick Installation Guide
Quick Installation
Guide X 1
Warranty
Registration
Form X 1
5-6
mm² European
terminals * 6
13-15
mm²
European
terminals * 4
5-6
mm² Battery
power line
(negative*1,positive*1)
13-15
mm²
R type
terminal*1
N-terminal adjacent
bridge *1
a) Before the installation of the inverter, connect
the ground wire rstly, and remove the “DONGLE”
waterproof cover (for the installation of
communication accessories); Please refer to the
pocket dongle ( WiFi) quick installation guide.
PV connection port (PV array)
Step 2: Install the T-BAT-SYS-3.0 battery bracket; (Please refer to T-BAT-SYS-3.0
battery quick installation guide)
Warranty
Registration
Form
For Customer (Compulsory)
For Installer
Name
Product Serial Number
Date of Commissioning
Installation Company Name
Installer Name
Electrician License No.
Phone Number
Address
State
Country
Zip Code
614.00002.07
Module Brand
Module Size(W)
Number of String
Number of Panel Per String
Battery Type
Brand
Number of Battery Attached
Battery ( If Any )
Module ( If Any )
Date of Delivery
Signature
Please visit our warranty website: https://www.solaxcloud.com/#/warranty
to complete the online warranty registration or use your mobile phone to
scan the QR code to register.
For more detailed warranty terms, please visit SolaX official website: www.solaxpower.com
to check it.