QMS Document Venue Hub – Digital I/R Instructions Page
1
of
7
Version: 3.0 16/08/2016
Venue Hub - Digital I/R Kit Instructions
Kit Contents:
1 X IR Receiver & Mount Plate
1 X Data Harness
1 X Remote Control with 2 X AA Batteries
IMPORTANT: Before installing the IR kit please ensure that your SLE 1026 board is running
software version v6.0 or higher and the amplifier is running on software version v4.8 or
higher. The IR kit will not work on older software
To check software version on the amplifier switch the machine on and look at the LCD
display. It will display the software version on boot up.
To check software version on the SLE 1026 board look for a white label near the EEPROM.
If you cannot see the version on any labels the SLE 1026 will require updating.
When installing the IR kit you must remove your RVC cables from the amplifier (RVC1 &
RVC 2). If the RVC cables from the SLE 1026 are left connected the amp may ignore
commands from the IR remote.