background image

PV-MODULE MOUNTING TP   

SUN-RAC 

LT SERIES

INSTALLATION MANUAL

 FOR 4.0" SCH 40

   

REV1.120518

Summary of Contents for SUN-RAC SRTP-PM-1

Page 1: ...PV MODULE MOUNTING TP SUN RAC LT SERIES INSTALLATION MANUAL FOR 4 0 SCH 40 REV1 120518...

Page 2: ...AGE 8 10 5 5 ADJUSTMENT OF ANGLE OR ARRAY PAGE 11 The SUN RAC system is the fastest most cost effective top of pole mounting system we have used I wish this racking solution was available years ago It...

Page 3: ...e of the modules will reduce the likelihood of high snow thickness ALL WARRANTY CLAIMS AGAINST SUN RAC ARE INVALID IF THE SRTP PM X IS INSTALLED IN INAPPROPRIATE CONDITIONS 2 ADDITIONAL INSTALLATION I...

Page 4: ...ACING AND INSTALLING RACKING SYSTEM Assumptions The pole extends no more than 6 feet 1 8 meters above ground Design wind speeds assume 29 psf wind force at 90mph 150km h and 51 psf wind force at 120 m...

Page 5: ...idth W 2 Write down the number of PV Modules you want to mount N 3 Calculate the Beam length L1 EXAMPLE Number of PV Modules N _____________ Width of the PV Module W ____________ L1 ___________IN N X...

Page 6: ...iddle of the Cap Place the second Beam Washer under the Beam and mount it as shown in the picture below 7 Mount one of the Purlin at a Tilt angle of 0 The W Panel s Width 24mm 0 95 inch 6 All purlins...

Page 7: ...er end of the Rail and the Pole Please Measure from the edge shown below edge on the Rail to the Pole Adjust angle by loosening u bolts through the top cap The tilt adjustment for the northern hemisph...

Page 8: ...s beam or main pole Shipping Weights Dimensions Model Shipping Weight Box Dimensions SUN RAC SRTP PM 1 18 lbs 36 in x 10 in x 10 in SUN RAC SRTP PM 2 21 lbs SUN RAC SRTP PM 3 23 lbs SUN RAC SRTP PM 4...

Page 9: ...Simply Energy 2016 All Rights Reserved...

Reviews: