background image

 

USER AND INSTALLATION 

GUIDE

 

SSH INDOOR SERIES 
 

MODELS 

 

60-150     60-120

 

60-90       60-60 

   

Manual updated on 4 January 2016 

THE EFFICIENT 

HEATING

 

 

Summary of Contents for 60-120

Page 1: ...USER AND INSTALLATION GUIDE SSH INDOOR SERIES MODELS 60 150 60 120 60 90 60 60 Manual updated on 4 January 2016 THE EFFICIENT HEATING ...

Page 2: ...guide carefully for an appropriate installation and later use If you have any questions regarding the installation or use of the product please contact us through our website www ssheat co uk or directly through your distributor Thank you Thank you for purchasing SS Heat Products Our products have the highest certifications worldwide and are manufactured under the strictest quality standards ...

Page 3: ...lt in fire and explosions Do not place flammable substances near the SSH panel such as oils gas containers sprays etc o If these recommendations are not followed it may result in explosions or fire Do not strike the SSH panel o If you do not follow the instructions appropriately there may be some risks due to malfunction The panels are not designed to be used by children or ill people with limited...

Page 4: ...rmal switch must be used Misuse of the thermostat may result in accidents Storage Do not place heavy items on the SSH panel for storage as they may cause damage or malfunction of the SSH panel For storage do not stack more than 10 plates at the same time Keep stored plates away from moisture 2 User s guide and guarantee Components included in each box 4 X SS HEAT direct heat radiation plate 4 X Pl...

Page 5: ...y of the receipt The receipt must show the serial number SS Heat assumes no liability for any problems caused by power surges in the mains Damages caused to the plate caused by any of the following are expressly excluded from the guarantee Accidents fire liquids chemical products other substances flooding vibrations electrical overloads excessive or incorrect voltage radiation electrostatic discha...

Page 6: ...fast amortisation due to its low energy consumption It imitates the process used by the sun to heat the Earth emitting heat in the low range of the infrared spectrum between 4 and 14 nano meters Energy savings It increases available space as it does not require boilers radiators split units compressors or gas bottles Maximum energy efficiency Completely silent heating that generates no noise or vi...

Page 7: ... 8 x 2 1 8 60 90 SR 4 SMART 600 2 6 89 8 x 59 8 x 2 2 4 60 120SR 5 SMART 800 3 5 119 8 x 59 8 x 2 3 1 60 150SR 6 SMART 900 3 9 149 8 x 59 8 x 2 3 8 Surface installation Fitted installation 4 Installation ALL ELECTRICAL CONNECTIONS AND INSTALLATION MUST BE CARRIED OUT BY A COMPETENT AND CERTIFIED ELECTRICIAN IN ACCORDANCE WITH CURRENT LEGISLATION REGULATION ...

Page 8: ... be shared with other electrical equipment Disconnection means must be incorporated into the wiring according to safety regulations The mains cable must comply with standard IEC 60245 66 and have a minimum thickness of 2 5 mm In the case of installing multiple plates connected to the same wire its size must match the type of installation following the instructions of the authorised installer Preca...

Page 9: ...10 cm away from lighting systems The SSH panel must be kept at a minimum distance of 100 cm from flammable products Recommended plate locations Figure 1 Figure 2 In the bedroom you must prevent the greatest heat to be produced on the bed Therefore it is recommended for the plate to be installed at the foot of the bed as shown in figure 1 If it is installed as in figure 2 comfort will be reduced as...

Page 10: ...placed in the area that heat reaches directly Taking into account that the aperture angle of the area heated by each plate is of 40 degrees according to the example on a ceiling with a height of 3 metres and a distance between the plate and the wall of 150 cm the thermostat must be placed over 130 cm from the ground Thermostat T T T T T Thermostat SS HEAT Panel The installation of a thermostat in ...

Page 11: ...5 While disconnected from the mains connect the plate wires to the wires that connect the plate section on the ceiling to the thermostat 6 Cover the screw holes with the trim caps included in the box and clean the plate 7 Connect the wires to the thermostat or home automation system close the covers connect to the mains verify that the plates are working correctly and programme the thermostat see ...

Page 12: ...mart Sun Heat The supply of service and the performance described herein will depend on the specific conditions of each project The use or reproduction of this document in whole or in part is strictly prohibited for any other purpose To obtain authorisation for the use of this information or any additional clarification contact THE EFFICIENT HEATING SMART SUN HEAT Unit 4 Townley park industrial es...

Reviews: