background image

Page | i                                                                                                                                                 

 

 

 
 
 
 
 
 

FirstLine Parallel Output 

Redundant Cabinet 

FLP-10-POPC-5-R-4Y-2Y  

10kVA 

USER MANUAL

  

 
 

003-2593  

Summary of Contents for FLP-10-POPC-5-R-4Y-2Y

Page 1: ...Page i FirstLine Parallel Output Redundant Cabinet FLP 10 POPC 5 R 4Y 2Y 10kVA USER MANUAL 003 2593...

Page 2: ...rder to improve it at any time and without notice 301 Gaddis Boulevard Dayton Ohio 45403 U S Toll Free 866 261 1191 937 253 1191 Fax 937 253 1723 Web site www stacoenergy com Thank you for choosing ou...

Page 3: ...Protection 12 Remote EPO Emergency Power Off 13 Section 6 14 REPO 16 Section 7 17 Maintenance 17 Section 8 17 Parallel Output Redundant Cabinet Technical Specifications 17 Table 1 Symbols 3 Table 2 Mo...

Page 4: ...bottom for maximum flexibility in wiring the source and load power connections Please refer to Figure 1 for the outline drawing of the cabinet Figure 1 The Firstline Parallel Output Redundant Cabinet...

Page 5: ...vent the possibility of backfeed Read and follow the instructions that came with the associated UPS or emergency lighting system before operating this equipment DANGER This equipment contains lethal v...

Page 6: ...ould only be performed by qualified service personnel knowledgeable of batteries and the required precautions Keep unauthorized personnel away from batteries Read understand and follow all instruction...

Page 7: ...ing damage or concealed damage 1 File with the carrier within 15 days of receipt of the equipment 2 Send a copy of the damage claim within 15 days to your service representative Floor Loading When pla...

Page 8: ...t strap or similar device of sufficient strength to tie the upper part of the cabinet to the forklift tower before moving 5 Keep people out of the fall zone If the cabinet topples over stand clear 6 W...

Page 9: ...nd initial startup There is a risk of electrical shock Wiring Preparation 1 Verify that the equipment is the proper type The equipment covered by this manual is 480V 60 Hz input and 208V output only T...

Page 10: ...to ensure physical separation between them and the power wiring 5 All wiring is to be in compliance with all applicable codes 6 Verify that the source circuit capability is in compliance with the req...

Page 11: ...ble 4 Maximum Current Ratings Rated Input Current Amps Rated Output Current Amps 18 28 Table 5 Terminal Tightening Torques INPUT OUTPUT NEUTRAL TERMINAL TORQUE Bolt Size Torque 20 75 inch pounds GROUN...

Page 12: ...o the load The load may be an external distribution panel etc If neutral is not needed by the load then it does not need to be supplied The wire must be in compliance with Table 3 and the terminals mu...

Page 13: ...f it is desired to use both a switch with multiple contacts is required one set for each UPS and another set for this Parallel Output Redundant Cabinet Refer to the UPS manual for the requirements reg...

Page 14: ...5 Customer Low Voltage Connection Terminal Block DS1 J201 J202 J203 J204 J205 J206 TB9 TB8 TB1 TB7 OT HT 1 1 1 1 1 TB6 TB5 TB4 TB3 TB2 TB11 TB10 1 2 3 4 1 2 1 2 4 3 2 1 5 6 5 3 4 6 5 1 2 3 4 PLT NCR O...

Page 15: ...before break transfer and to prevent backfeed This coordination requires two pairs of signal wires between the MBS and each UPS The interlock scheme also has redundancy so that the failure of a singl...

Page 16: ...sets would wire to each of the UPS per the instructions in the UPS manual The UPS switch must be normally closed Some users prefer to use a normally open switch in the REPO system others prefer a norm...

Page 17: ...ersize the load wiring in a redundant system that otherwise could supply twice the rated current First time operation at UPS commissioning This procedure initially applies the bypass source to the loa...

Page 18: ...Mode 4 Close Breaker 2 then open Breaker 6 The load is now supplied from the bypass source and there is no battery back up available 5 The UPSes can be powered down for service Open Breakers 1 and 3...

Page 19: ...ion trips Breaker 2 if closed and Breaker 3 and 5 if closed interrupting power to the load For details on how to connect to the REPO input s refer to Section 4 of this Manual To restart the system aft...

Page 20: ...rsonnel should perform this work Elevated temperatures of the terminations usually are the sign of a loose connection but can also signal that a breaker is failing Loose connections should only be ser...