background image

 

 

 

 
 
 
 

Spredway

®

 

 
 
 
 

Owner’s 

Installation and Operation Manual 

 
  

Sukup Manufacturing Co. 

1555 255th Street, Box 677 

Sheffield, Iowa, USA 50475-0677

 

Phone: 641-892-4222

 

Fax: 641-892-4629

 

Website: www.sukup.com 

E-mail: info@sukup.com 

 
 
 
 
 
 
 

 
 
Manual L1431                                                                                                              ©Sukup Manufacturing Co. 
12/05/2017

 

D

ATES

 

R

EVISIONS

 

P

AGES

 

12/05/2017 – Updated operation instructions ....................................................................................................... 10 

Summary of Contents for Spredway

Page 1: ...acturing Co 1555 255th Street Box 677 Sheffield Iowa USA 50475 0677 Phone 641 892 4222 Fax 641 892 4629 Website www sukup com E mail info sukup com Manual L1431 Sukup Manufacturing Co 12 05 2017 DATES...

Page 2: ...ting from improper management during drying or storage Limited Warranty 3 Safety Section 4 Assembly 7 Installation 8 Operation 10 Troubleshooting Guide 10 Specifications 11 Wiring 11 Optional Pre Spre...

Page 3: ...Limited Warranty 3...

Page 4: ...f hazards and safety precautions that need to be taken to avoid personal injury or death Always keep children away from bins and vehicles with flowing grain Make no unauthorized modifications to machi...

Page 5: ...larly during operation Keep away from all moving parts Keep all shields in place SHUT OFF AND LOCK OUT all power before servicing Failure to follow precautions above could result in death or serious i...

Page 6: ...during installation Decal 3 is mounted at factory Make sure location for decal is free from grease oil and dirt Remove backing from decal and place in proper position IMPORTANT If suggested locations...

Page 7: ...To mount pan to spreader lower pitch adjusting rod by loosening locking handle and pre spread disc inside of cone Lower adjusting rod so its end is about 3 below main bearing shaft See Fig 2 One end o...

Page 8: ...A 3 Bolt 5 16 18 x 1 PLT 18 J0527 4 Lock washer 5 16 PLT 18 J1200 5 Hex nut 5 16 18 18 J1002 6 Flat washer 5 16 18 J1111 Super Hi Capacity 1 Divide circumferences of center fill ring into three 3 equa...

Page 9: ...onal vertical brackets if required If pre spread funnel is used use longer vertical brackets See table below If bin s fill ring is too small for Spredway to fit through use a winch to raise it from in...

Page 10: ...lls in center of bin If grain is too high in center rotate cover to make opening smaller If grain is too low in center rotate cover to make opening larger Pre spread ring is designed to allow for mult...

Page 11: ...vy duty wiring to Spredway motor Follow applicable electrical codes Operating voltages for Spredway motors are listed below MOTOR TYPE FACTORY PRE WIRED VOLTAGE ALTERNATIVE VOLTAGE 1 2hp 1ph 115 volts...

Page 12: ...Parts Identification 12 PARTS IDENTIFICATION Standard and High Capacity Spredway Galvanized G01051...

Page 13: ...Spread G0144 Motor 75hp 3ph 440V wired High Cap Wide Spread G0148 13 Pulley 1 3 4 x 5 8 Standard 1 J0290 14 Pulley 2 1 4 x 5 8 High Cap Wide Spread 1 J0299 15 Key 3 16 x 3 16 x 1 1 G0150 16 Bolt 5 16...

Page 14: ...Parts Identification 14 Super High Capacity Spredway Galvanized G0250...

Page 15: ...1 G0272 G0273 G0274 15 Spreader cone 1 G02921 16 Center bracket 3 G02922 17 Motor mount bracket 1 G02923 18 Pre spread ring Super High 1 G02924 19 Spreader pan Super High 2 G02991 20 1 center bearing...

Page 16: ...phone _____________________________ Office phone ___________________________ Fax ___________________________________ In Case of Emergency Have emergency numbers and directions to your location near a...

Reviews: