background image

© 2015 Syncronorm GmbH

Syncronorm V:Server

Instruction Manual

Summary of Contents for V:Server U16

Page 1: ... 2015 Syncronorm GmbH Syncronorm V Server Instruction Manual ...

Page 2: ...Dangers resulting from non adherence to the safety information 5 Safety conscious operation 5 Safety information regarding maintenance inspection and installation work 5 Optional retrofitting and production of spare parts Part II Installation 6 6 1 Front Panel 6 2 Back Connectors 7 3 Getting Started 7 Connecting 7 First Start Up 8 4 Settings 8 Folder and Project 9 V PAD and V 3D 10 Synchronization...

Page 3: ...manual when installing and operating this unit All persons working with this equipment must read this manual before installation and commissioning of the equipment device All persons working with this device equipment must read the manual before starting work Even personnel working with this device only occasionally must read and understand this manual before beginning to work This manual must alw...

Page 4: ...cal installation Electrical installations must meet the national regulations and may only be carried out by a qualified electrician A person is regarded as a qualified electrician if due to his her vocational education knowledge and experience he or she is capable of and authorized to judge and carry out the work commissioned to him her This also includes the recognition of possible hazards and th...

Page 5: ...ection and installation work It is the owner user s responsibility to ensure that all maintenance inspection and installation work is carried out by authorized and qualified personnel who have read and understood this manual Only carry out maintenance work on this unit when the unit system is switched off Ensure that no pressure is applied to the unit and it is disconnected from the power supply v...

Page 6: ...Syncronorm V Server 6 2015 Syncronorm GmbH 2 Installation 2 1 Front Panel 2 2 Back Connectors ...

Page 7: ...e 2 Now connect a IEC power cord with 110 230V AC to the device 3 Connect the V Server to your Shownet Network using the Ethernet connector on BACKSIDE 4 Connect an USB Keyboard Mouse or Touch Screen to one of the available USB Ports 5 Connect a Monitor to one of the DVI connectors 6 Connect your DMX devices 2 3 2 First Start Up 1 Switch on the Device on backside 2 Wait until the V Server boot is ...

Page 8: ...n Login and type in depence as password in lower cases 2 4 1 Folder and Project Path to Projects This option can change the internal project folder Current Project Here you can manually load an existing project Load Showfile after Boot This option will load a specific Sequence show after startup Update Project from USB This option can be used to import a full Project from any USB Stick This is als...

Page 9: ...o send back DMX Data to V PAD i e for recording old show you can here define the IP address of the PC where V PAD is running Same for V 3D as monitoring on an additional PC Check out I O Configuration to setup specific Universes to be sent to V PAD or V 3D See I O Control ...

Page 10: ...r Slave The V Server supports 3 different Timecode formats SMPTE Analog over XLR Connector on backside NTC Nettimecode over Ethernet SNTC Syncronorm Timecode over Ethernet Here you can also adjust the SMPTE signal volume Additionally the V Server offers the possibility to add an Audio Delay i e if your Audience is to far away from the speakers ...

Page 11: ...s password depence in lower case 2 Now the Settings button will be enabled 3 In the tab Input and Output Configuration select Network Settings 4 Assign a valid IP address for Shownet and if you also want to use Comnet for running a TeamViewer application in background you can also setup an additional IP address for Comnet Note that it is always recommend to use static IP addresses instead of using...

Page 12: ...all Data coming from the Left side are INPUTS and on right side are OUTPUTS Data input Showdata These are all Universes are internally calculated by the V Server so finally the current running show V PAD Means all DMX data are currently sent by a potentially connected V PAD This is disabled by default This option is only used in some special cases i e where you want to keep control over a specific...

Page 13: ... shows See V PAD and V 3D V 3D This is used to send DMX Data to a PC where V 3D is running in Network i e for monitoring See V PAD and V 3D ArtNET Here you can define one or multiple ArtNET Nodes which should receive the DMX Data of the current DMX line Note that ArtNET Universes are counted by 0 V Nano Same as by ArtNET you can define one or multiple V Nano devices in the Network to work as DMX I...

Page 14: ...t ProjectName REBOOT Reloads the current Project LOAD Loads a specific Show load MyShow PLAY Play the loaded Show ADDTIMEOFFSET Add a offset to showtime addtimeoffset 00 00 01 00 STARTTIMEPLANNER Starts the automatic Timeplaner STOPTIMEPLANNER Stop the Timeplaner GETSHOWLIST Will list all available shows GETBOOTLIST Will list all available Projects STARTSYSTEMUPDATE Start a Firmware update GETCURR...

Page 15: ...eserve the right at our discretion to supply a replacement unit from our range that is closest to the type subject to complaint Claims the origin of which can be traced back to installation and operating faults as well as lack of care e g the use of unsuitable cleaning materials or negligent maintenance use other than that intended damage due to accidents falls impact effect of frost cutting plugs...

Page 16: ...der and Project 8 Front Panel 6 G Guarantee 15 I I O Control 12 IP Addresses 11 L Login 8 M Maintenance 15 Master 10 N Network Connection 11 NTC 10 P Password 8 Path to Projects 8 Q Qualifications 5 R RDM 12 Routing Lines 12 S Safty information 4 scope of delivery 4 Settings 8 Showdata 12 Shownet 11 Slave 10 SMPTE 10 SMPTE signal volume 10 SNTC 10 Synchronization 10 T Technical data 3 Timecode 10 ...

Page 17: ...Index 17 2015 Syncronorm GmbH V V Nano 12 V PAD and V 3D 9 ...

Reviews: