background image

©Copyright Task Force Tips LLC 2021

1

LIY-350 January 13, 2021 Rev00

TASK FORCE TIPS LLC

MADE IN USA · tft.com 

3701 Innovation Way, Valparaiso, IN 46383-9327 USA

800-348-2686 · 219-462-6161 · Fax 219-464-7155

G-Force

INSTRUCTION FOR INSTALLATION, OPERATION, AND MAINTENANCE

RADIUS™ MONITOR 

SERIES

DANGER

Understand manual before use. Operation of this device without understanding the manual and

receiving proper training is a misuse of this equipment. Obtain safety information at tft.com/

serial-number. 
This equipment is intended for use by trained and qualified emergency services personnel for

firefighting. All personnel using this equipment shall have completed a course of education

approved by the Authority Having Jurisdiction (AHJ).
This instruction manual is intended to familiarize firefighters and maintenance personnel with the

operation, servicing, and safety procedures associated with this product. This manual should be

kept available to all operating and maintenance personnel. 

STOWED POSITION

DEPLOYED POSITION

Summary of Contents for RADIUS Series

Page 1: ...ning is a misuse of this equipment Obtain safety information at tft com serial number This equipment is intended for use by trained and qualified emergency services personnel for firefighting All pers...

Page 2: ...nt you may be called upon to use 3 It is your responsibility to know that you have been properly trained in Fire ghting and or Emergency Response and in the use precautions and care of any equipment y...

Page 3: ...GAUGE PORT 4 7 AUTOMATIC DRAIN 5 0 OPERATING INSTRUCTIONS 5 1 RAISING AND LOWERING THE MONITOR 5 2 HORIZONTAL ROTATIONAL CONTROL 5 3 ELEVATION CONTROL 5 4 RECOMMENDED PARK POSITION 6 0 FLOW CHARACTERI...

Page 4: ...pression See flow graphs WARNING This equipment is intended for use by trained personnel for firefighting Use of this equipment for other purposes may involve hazards not addressed by this manual Seek...

Page 5: ...150 Figure 3 2A Radius Monitor Operating Envelope 3 Inlet Nozzle A flows 500 gpm 1900 L min at 100 psi 7 9 bar K factor 50 Nozzle B flows 1000 gpm 3800 L min at 100 psi 7 9 bar K factor 100 Nozzle C...

Page 6: ...MODELS AND TERMS Figure 3 4 3 5 INLET OPTIONS The monitor is equipped with either a 3 or 4 ANSI 150 flange inlet Each of the flange options is equipped with corresponding pipe threads in the inner di...

Page 7: ...ht Task Force Tips LLC 2021 7 LIY 350 January 13 2021 Rev00 3 6 OVERALL DIMENSIONS Figure 3 0 379 mm 14 92 26 mm 1 01 61 mm 2 41 45 90 381 mm R15 00 291 mm R11 45 90 582 mm 22 89 669 mm 26 32 45 520 m...

Page 8: ...total of 76 80 ft lb 100 110 N m Figure 4 1 Table 4 1 WARNING Reaction forces generated by master stream flows are capable of causing injury and property damage if not properly supported Monitors sho...

Page 9: ...g labels Figure 4 2 2A 3 Mount the relay in a suitable location The enclosed relay MUST BE USED to limit the current through the switch 4 Wire the system as show below Figure 4 2 2B NOTICE Relay and l...

Page 10: ...vel for the Radius monitor is 90 degrees above to 45 degrees below horizontal Refer to Figure 4 4 if limited elevation travel is desired Figure 4 4 Straight Ahead Reference Mark Y4145 Stop Bolt 90 Lef...

Page 11: ...the screw and washer and reinstall the drain valve assembly CAUTION Mismatched or damaged waterway connections may cause equipment to leak or uncouple under pressure Failure could result in injury Equ...

Page 12: ...tor is properly parked before moving the truck and know the overall height to avoid damage from overhead obstructions such as doors or bridges WARNING The Radius monitor may be used only in either the...

Page 13: ...METER 3 5 BAR 4 1 BAR 5 5 BAR 7 BAR FLOW L min REACTION KG FLOW L min REACTION KG FLOW L min REACTION KG FLOW L min REACTION KG 50 mm 3180 140 3480 170 4010 230 4500 290 57 mm 4010 180 4430 220 5110 2...

Page 14: ...T VERTICAL DISTANCE FEET 2 25 INCH TIP 60 PSI 100 PSI 80 PSI 50 PSI VERTICAL DISTANCE M 0 0 40 0 80 0 20 0 60 0 HORIZONTAL DISTANCE M 0 10 20 0 20 40 60 80 0 0 40 0 80 0 120 0 160 0 200 0 240 0 280 0...

Page 15: ...a moderate wind can affect stream reach Figure 6 1 1B Effects of Wind on Reach 0 20 40 60 80 100 120 140 160 180 200 0 40 80 120 160 200 240 280 HORIZONTAL DISTANCE FEET 2 25 INCH TIP 100 PSI 1500 GPM...

Page 16: ...000 500 1190 630 NOZZLE INLET PRESSURE NOZZLE DIAMETER 2 8 BAR 4 1 BAR 5 5 BAR 7 BAR FLOW L min REACTION KG FLOW L min REACTION KG FLOW L min REACTION KG FLOW L min REACTION KG 35 mm 1360 50 1670 80 1...

Page 17: ...280 0 40 PSI 60 PSI 100 PSI 80 PSI HORIZONTAL DISTANCE FEET VERTICAL DISTANCE FEET VERTICAL DISTANCE M 0 0 4 0 0 80 0 0 0 6 0 0 2 HORIZONTAL DISTANCE M 1 75 INCH TIP 0 10 20 0 20 40 60 80 0 0 40 0 80...

Page 18: ...moderate wind can affect stream reach Figure 6 2 1B Effects of Wind on Reach 0 40 80 120 160 200 240 280 320 0 20 40 60 80 100 120 140 160 VERTICAL DISTANCE FEET HORIZONTAL DISTANCE FEET 80 0 6 0 4 0...

Page 19: ...REAM NOZZLES Automatic nozzles maintain a constant pressure by adjusting their orifice to match the available flow Consult the nozzle manufacturer for maximum flow and pressure range In all cases do n...

Page 20: ...ozzle will increase the stresses on the monitor s gear train and may lead to premature wear Use of a stream straightener with a fog nozzle is not recommended GPM FLOW 920 840 751 1127 1063 1246 1188 9...

Page 21: ...of its obligations under this limited warranty If TFT makes this election claimant shall return the equipment to TFT free and clear of any liens and encumbrances This is a limited warranty The origin...

Page 22: ...kote 112 Any scrapes that expose bare aluminum should be cleaned and touched up with enamel paint such as Rust Oleum Replace any missing or damaged parts before returning to service Any equipment take...

Page 23: ...nce with TFT test procedures Consult factory for the procedure that corresponds to the model and serial number of the equipment Any equipment which fails the related test criteria should be removed fr...

Page 24: ...BEING PLACED BACK IN SERVICE appliances must be inspected to this checklist 1 All valves if so equipped open and close smoothly and fully 2 The waterway is clear of obstructions 3 There is no damage t...

Reviews: