Form No. 3434-904 Rev A
Pro Force
®
Debris Blower Mounting Kit
Groundsmaster
®
3280-D Traction Unit
Model No. 30493
Installation Instructions
Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Procedure
Description
Qty.
Use
1
No parts required
–
Remove the cutting unit from the lift
arms.
Bolt (3/8–16 x 1–3/4 inches)
2
Locknut (3/8–16 inch)
2
CV drive shaft
1
2
Roll pin (3/16 x 2–1/4 inches)
1
Replace the CV shaft.
Bolt (1/2–13 x 3/4 inches)
2
Lock washer (1/2 inch)
2
Flat washer (9/16 x 1–3/8 inches)
2
Hairpin cotter
2
Clevis pin (5/16 x 1–22/25 inches)
2
Support rod
2
Bolt (1/2–13 x 1 inch)
2
Clevis pin
2
Bolt (3/8–16 x 1–3/4 inches)
2
Locknut (3/8–16 inch)
2
Roll pin (3/16 x 2–1/4 inches)
1
3
Attachment frame
1
Mount the attachment frame to the lift
arms.
Drive-shaft assembly
1
Roll pin
1
Bolt (5/16 x 1-3/4 inches)
2
4
Locknut (5/16 inch)
2
Install the drive shaft to the blower
gearbox shaft.
Mounting plate
1
Bolt (1/2 x 1-1/4 inches)
4
5
Locknut (1/2 inch)
4
Install the mounting plate to the debris
blower frame.
Debris-blower assembly
1
Locking pin
1
6
Hairpin cotter
1
Mount the blower to the traction unit.
Console wiring harness
1
Blower wiring harness
1
Cable tie
10
Switch
1
Fuse
1
7
Fuse block
1
Route the wire harness.
© 2019—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com.
Original Instructions (EN)
Printed in the USA
All Rights Reserved
*3434-904* A