background image

 

 

 

 

 

OPERATIONS MANUAL 

CORE DRILLING MOTOR 

DBM 31PH 

 

Unit 4/1 Rocklea Drive 

Port Melbourne Vic 3207 

Australia 

1300 109 108 

www.traxxcp.com.au 

Summary of Contents for DBM 31PH

Page 1: ...OPERATIONS MANUAL CORE DRILLING MOTOR DBM 31PH Unit 4 1 Rocklea Drive Port Melbourne Vic 3207 Australia 1300 109 108 www traxxcp com au ...

Page 2: ...ducts has composed this manual with accuracy However mistakes may occur or articles may be changed Traxx Construction Products is not responsible for mistakes or deviations of figures graphics or any other information found in this instruction manual 1 INTRODUCTION 3 2 GENERAL SAFETY 3 3 STARTING THE CORE DRILL RIG 4 4 STOPPING THE CORE DRILL RIG 4 5 MAINTENANCE 4 6 TECHNICAL PARAMETERS 5 7 PARTS ...

Page 3: ...der any circumstance touch the running core bits 9 Take care that all non operators keep a safe distance from the machine especially children 10 To avoid accidents the throttle should be in idle state when engine is running that is the clutch is in a state of separation to ensure that the core bits is not running 11 Do not use machine indoors 12 When the machine is in use it should be more than 3 ...

Page 4: ...st the throttle valve to enable the engine in idle state 9 With the engine temperature increasing shift the air valve to OPEN position 10 Adjust the throttle valve to enable the engine speed has ideal position lock throttle position and you can start your work Note do not apply too much pressure while drilling push machine appropriately with a constant power Do not use machine in a dangerous envir...

Page 5: ...GINE MODEL GX35T DISPLACEMENT 35 8CC MAXIMUM POWER 1 2KW 7000RPM MAXIMUM TORQUE 1 9NM 5500RPM COOLING SYSTEM FORCED AIR COOLING SYSTEM SPARK PLUG CMR5H NGK MAX SPEED OF CORE BITS W DECELERATION DEVICE 777RPM MAX CORE BIT DIAMETER 160MM CORE BIT CONNECTING THREAD G 1 1 4 7 WEIGHT 9 7KG ...

Page 6: ...Traxx Constructions Products Operations Manual DBM 31PH 6 7 PARTS LIST AND EXPLODED VIEW ...

Page 7: ...Traxx Constructions Products Operations Manual DBM 31PH 7 ...

Page 8: ...Traxx Constructions Products Operations Manual DBM 31PH 8 Unit 4 1 Rocklea Drive Port Melbourne Vic 3207 1300 109 108 www traxxcp com au ...

Reviews: