background image

 1 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

1.Preface 

T h a n k   y o u   f o r   p u r c h a s i n g   t h e   S h o c k   R e l a y   T S B S C   s e r i e s .  
T h e   S h o c k   R e l a y   i s   a   c u r r e n t   m o n i t o r i n g   d e v i c e   t h a t

q u i c k l y   d e t e c t s   m o t o r  

o v e r l o a d ,   t h u s   p r o t e c t i n g   y o u r   e q u i p m e n t   f r o m   c o s t l y   d a m a g e .  
T h i s   i n s t r u c t i o n   m a n u a l   d e s c r i b e s   e v e r y t h i n g   f r o m   i n s t a l l a t i o n   t o   a d j u s t m e n t .  
B e   s u r e   t o   r e a d   t h i s   m a n u a l   c a r e f u l l y   b e f o r e   u s i n g   y o u r   S h o c k   R e l a y .  
W h e n   d e l i v e r i n g   a   d e v i c e   c o n t a i n i n g   t h e   S h o c k   R e l a y ,   b e   s u r e   t h a t   t h i s  
i n s t r u c t i o n   m a n u a l   i s   i n c l u d e d .  

'*5%$4

ᲬᲪᲫᲱ᳉᳝ᳮᲫᲬ

6+2&.5(/$<

76%6&

6HULHV

,16758&7,21

0$18$/

768%$.,00272

&&+$,1

&&2

᳑᲻᳌᳈᳃᳈᳁

 

1. Make sure you read this instruction manual thoroughly before 

installing, wiring, operation and inspecting this SHOCK RELAY. 

2. Please make sure that this instruction manual accompanies the 

SHOCK RELAY to the end user. 

3. Product specifications are subject to change for improvement 

without notice. 

4.   Disconnect power. Always lock out power switch before 

installing,    removing, or servicing unit. Comply with Occupational 

Safety and Health Standards 1910. 147 

The Control of Hazardous 

Energy (Lock Out/Tag Out)

.”

 

5. Install in proper enclosure in accordance with NEMA 250-1991 

Enclosures for Electrical Equipment (1000Volts Maximum)

 and 

NFPA496 1993 edition 

Purged and Pressurized Enclosures for 

Electrical Equipment, 1993 Edition

.”

    When revisions of these 

standards are published, the updated edition shall apply.  

6. Make sure you read this instruction manual thoroughly before 

installing, wiring, operation and inspecting this SHOCK RELAY.  

7. Please make sure that this instruction manual accompanies the 

SHOCK RELAY to the end user. 

8. Product specifications are subject to change for improvement 

without notice. 

 

Summary of Contents for SHOCK RELAY TSBSC Series

Page 1: ...RELAY to the end user 3 Product specifications are subject to change for improvement without notice 4 Disconnect power Always lock out power switch before installing removing or servicing unit Comply...

Page 2: ...e to prevent accidents 9 Disconnect power Always lock out power switch before installing removing or servicing unit Comply with Occupational Safety and Health Standards 1910 147 The Control of Hazardo...

Page 3: ...in one type TSBSCB06 TSBSCB34 TSBSCB60 Panel type TSBSCS06 TSBSCS34 TSBSCS60 Panel Unit TSBSCD Cable SBSCC05 TSBSCC10 TSBSCC15 External CT TSB3CTC100 TSB3CTC200 TSBSCC20 TSBSCC30 TSB3CTC300 Dimension...

Page 4: ...4 Specifications...

Page 5: ...DIN Rail While pulling the hook of Shock Relay to the arrow direction install Shock Relay to 35mm DIN rail When removal pull the hook to the arrow direction with flathead screwdriver 6 3 Panel unit 1...

Page 6: ...6 8 Explanation of each part 8 1 Operation portion...

Page 7: ...7 9 Setting procedure...

Page 8: ...OQVQT M9 RRNKECDNG 5JQEM 4GNC QFGN 0Q M9 RRNKECDNG 5JQEM 4GNC QFGN 0Q 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 65 5 65 5 5 QFGN 0Q 65 6 65 6 65 6 NCUU TCFG 4CVGF RTKOCT EWTTGPV 4CVG...

Page 9: ...9 Parameter...

Page 10: ...10 X100 Current Max Current Max Im Current Min io balancerat...

Page 11: ...11...

Page 12: ...12...

Page 13: ...13 close close...

Page 14: ...14 Wiring diagram 3 Communication function Single phase motor CB Circuit breaker OCR Overcurrent relay F Fuse MC Magnetic contactor TR Transformer...

Page 15: ...lay After the start over load trip occurs Load of motor Over load Motor capacity is reexamined Inertia is too big Start time setup value is examined It is too short It is set up a little long Current...

Page 16: ...r 5 Any repair by engineers other than the Seller or those designated by the Seller 6 Operation in an inappropriate environment not specified in the manual 7 Force Majeure or forces beyond the Seller...

Reviews: