background image

Version 01 | December 2021

Installation manual 

Valk

Double

Summary of Contents for ValkDouble

Page 1: ...Version 01 December 2021 Installation manual ValkDouble...

Page 2: ...dle zone of the roof Index Disclaimer Select wind area Page Required ballast Page Required tools Page 00a Required materials Page 00b General dimensions Page 00c Placing roof carriers Page 01 A frame...

Page 3: ...for PV panels placed on flat roofs should either be mechanically attached to the roof or need to be supported by ballast to make sure that the solar mounting system is unable to be lifted tipped over...

Page 4: ...ndmap choose the wind area and building height in the table you can now read the number of tiles kg Note 1 The extra ballast must be equally divided over the ballast foundations Note 2 The max of 16 t...

Page 5: ...allast determine the wind area on the windmap choose the wind area and building height in the table you can now read the number of tiles kg Note 1 The extra ballast must be equally divided over the ba...

Page 6: ...d ballast determine the wind area on the windmap choose the wind area and building height in the table you can now read the number of tiles kg Note 1 The extra ballast must be equally divided over the...

Page 7: ...e 1 The extra ballast must be equally divided over the ballast foundations Note 2 The max of 16 tiles can be placed for extra ballast 144 kg Environmental factors Position Middle zone roof Terrain cat...

Page 8: ...uilding height in the table you can now read the number of tiles kg Note 1 The extra ballast must be equally divided over the ballast foundations Note 2 The max of 16 tiles can be placed for extra bal...

Page 9: ...for extra ballast 144 kg Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 22 m s 44 0 44 0 49 0 65 0 82 0 kg 5 0 5 0 5 5 7 5 9 5 tiles 25 m s 86 0 86 0 97 0 123 0 144 0 kg 10 0 10...

Page 10: ...nicipalities Aurland 25 Eid 26 Fjaler 26 F rde 26 F rde near the Jostedalsbreen 26 Gaular 26 Gloppen 26 Gloppen near the lfotbreen and Jostedalsbreen 26 Hornindal 26 Hyllestad 26 H yanger 26 L rdal 26...

Page 11: ...t foundations Note 2 The max of 16 tiles can be placed for extra ballast 144 kg Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 22 m s 11 0 23 0 31 0 42 0 51 0 kg 1 5 3 0 3 5 5 0...

Page 12: ...last must be equally divided over the ballast foundations Note 2 The max of 16 tiles can be placed for extra ballast 144 kg Building height 0 5 meter 5 7 meter 7 9 meter 9 12 meter 12 15 meter 21 m s...

Page 13: ...e the wind area and building height in the table you can now read the number of tiles kg Note 1 The extra ballast must be equally divided over the ballast foundations Note 2 The max of 16 tiles can be...

Page 14: ...of tiles which must be placed on the indicated ballast foundations In three steps you can easily calculate the required ballast determine the wind area on the windmap choose the wind area and buildin...

Page 15: ...he required ballast determine the wind area on the windmap choose the wind area and building height in the table you can now read the number of tiles kg Note 1 The extra ballast must be equally divide...

Page 16: ...00 Recommended installation tools ValkDouble Cordless drill for socket 13 and bit T 30 Socket 13 Torx bit T 30 Measuring tape Wrench 13...

Page 17: ...merheadbolt M8x20 774220 Installation Page 03 Alu profile 2100mm 7272100 Alu extension profile 757050 1010 1046 mm 757051 1038 1065 mm 757052 1065 1100 mm Installation Page 04 Alu hinge 50mm 724450 In...

Page 18: ...00 10 2098 P a n e l th ic k n e s s 2 8 5 0 2128 503 1300 Advised pitch measure 3300 Based on sun angle of 14 5 825 Panel length...

Page 19: ...cations before mounting the roof carriers Detail A A 825 Front view 3rd Hole 2nd to last hole Detail B 1 Detail B 2 15 Nm 15 Nm Front view Place the mass block on the rubber tile carriers Mount the ma...

Page 20: ...groove on the bolt corresponds with the orientation of the bolt head A A A 2nd hole 3rd hole from end B Detail B 15 Nm Mount the connector pieces to the roof carriers Make sure they are placed as sho...

Page 21: ...tail A The groove on the bolt corresponds with the orientation of the bolt head A B Detail B A 4th hole 5th hole from end roof carrier 15 Nm Mount the push rods on the roof carriers to connect the two...

Page 22: ...t Create the Aluminium profile with the connector pieces first Then mount the profile to the roof carrier Detail A 1 A 15 Nm 15 Nm Mount in 3rd hole Mount in 3rd hole from end of profile Detail A 2 15...

Page 23: ...04 2 Detail A A Side view Extension piece for panel width 757050 1010 1046 mm 757051 1038 1065 mm 757052 1065 1100 mm...

Page 24: ...05 Mount the push rods to the aluminium profile and the roof carriers A Detail A A Diagonal rod 15 Nm 15 Nm M8x80 M8x80...

Page 25: ...06 2 extra tiles A Detail A A 15 Nm 4 extra tiles 6 extra tiles 8 extra tiles Turn upside down For the required number of tiles check the ballast tables in front of this manual...

Page 26: ...it s slot for an easier assembly A Step 2 Step 3 The end clamp can only be turned clockwise so make sure the end clamp is placed the right way Step 4 Put the end clamp in the right slot to continue t...

Page 27: ...08 Attention Do not forget to install the end clamps above the second panel Same installation as other end clamps page 07 A Step 1 A 8 Nm...

Page 28: ...09 Mount cable clamp on the panel...

Reviews: