KNS8 VELLEMAN
1
KNS8 – MECHANICAL SKELETON
1. Introduction & Characteristics
Thank you for buying the KNS8 ! Read this manual carefully before bringing the KNS8 into use.
•
Build a gearbox and learn how automatic transmissions and motors work.
•
Easy to build, no glue or soldering required.
•
Dislodge the pre-cut pieces when you need them and not before. Sand the jagged edges before use (sandpaper
included)
•
The kit is powered by 2 AA-batteries (not included).
The kits of the KNS-series are supplied with prepunched boards, a gearbox, gears, shafts, a switch, a motor, a
battery holder and all necessary parts.
Note that the figures with the assembly instructions can be found in the second folder “
KNS8 – Figures
”!!!
2. Parts List (see also KNS8 – Figures)
Part
n°
Quant. Description Part
n° Quant. Description
1
1 gearbox
18
6
nylon nut M3
2
1 motor
3Vdc
19
18 nut
M2
3
1 battery
holder
20
18
screw (2 x 8mm)
4
1
slide switch with wire
21
4
self-tapping screw (2 x 4mm)
5
1
metal shaft (2 x 40mm)
22
2
screw (3 x 14mm)
6
1
metal shaft (3 x 52mm)
23
2
screw (3 x 18mm)
7
1 pinion
gear
8T
24
2
screw (3 x 22m)
8
1
face gear 36T/10T (white)
25
8
washer (3.2 x 10.0 x 0.5mm)
9
1
gear 40T/0T (white)
26
15
washer (2.6 x 6.0 x 0.5mm)
10
1 gear
40T/10T
(red)
27
3 PVC
tube
(15mm)
11
1 gear
40T/10T
(green)
28
10
nylon pad (Ø 8mm)
12
1
wire with terminal (yellow)
29
5
fixing plate (L-shaped)
13
1
wire with terminal (green)
30
4
nylon post (H : 3mm)
14
2
metal foot (U-shaped)
31
1
spring (L : 50mm)
15
2
nylon connector (N-shaped)
32
2
spring (L : 20mm)
16
2
nylon pad (5.6 x 4.8 x 1.95)
33
6
self-tapping screw (2 x 6mm)
17
2
nylon post (H : 6mm)
3. Prepunched Boards (see
“
KNS8 – Figures
”
)
4. Assembly (see also
“
KNS8 – Figures
”
)
Fig. 3 : The gears (n°9/10/11/8) should be placed to the left of the pinion gear. One N-shaped nylon connector
(n°15) should point downward and the other one upward. Insert the motor as depicted in the drawing. Note
that the protruding edge should point towards the metal case.
Fig. 4 : Identify boards 2 & 3. The screw opening in board 3 is located in the middle, while the one in board 2 lies
off to the left. Make sure board 1 is not upside-down.